Line 5: Line 5:
| author name = Haney C
| author name = Haney C
| author affiliation = NRC/NRR/ADRO/DORL
| author affiliation = NRC/NRR/ADRO/DORL
| addressee name = Allen B S
| addressee name = Allen B
| addressee affiliation = FirstEnergy Nuclear Operating Co
| addressee affiliation = FirstEnergy Nuclear Operating Co
| docket = 05000346
| docket = 05000346

Revision as of 13:33, 12 July 2019

Closure of Confirmatory Action Letter NRR-07-017
ML081070270
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 04/25/2008
From: Catherine Haney
Plant Licensing Branch III-2
To: Allen B
FirstEnergy Nuclear Operating Co
Wengert, Thomas J, NRR/DORL, 415-4037
References
TAC MD4148, NRR-07-017
Download: ML081070270 (5)


Text

April 25, 2008

Barry S. Allen Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station Mail Stop A-DB-3080 5501 North State Route 2 Oak Harbor, OH 43449-9760

SUBJECT:

DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1 - CLOSURE OF CONFIRMATORY ACTION LETTER NRR-07-017 (TAC NO. MD4148)

Dear Mr. Allen:

On March 20, 2007, the U.S. Nuclear Regulatory Commission (NRC) issued Confirmatory Action Letter (CAL) No. NRR-07-017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML070730470), regarding dissimilar metal welds in the pressurizer at Davis-Besse Nuclear Power Station, Unit 1 (Davis-Besse). This letter acknowledges receipt of your letter dated March 25, 2008 (ADAMS Accession No. ML080880147) informing the NRC of actions taken in response to this CAL.

In your letter, you stated FirstEnergy Nuclear Operating Company (FENOC) removed Davis-Besse from service on December 30, 2007, to support the mitigation activities as stated in Commitment No. 1 of your February 28, 2007, correspondence (ADAMS Accession No. ML070660476). FENOC completed the planned pressurizer structural weld overlays and performed final weld overlay ultrasonic inspections on January 20, 2008. No recordable indications were identified in the weld overlay volume.

Based on your letter, the NRC has found that all the commitments listed in the CAL and supporting commitment letter have been met. No further response is required regarding the CAL. We consider the CAL closed. As such, it is no longer necessary to implement enhanced inspection and leakage monitoring requirements for the reactor coolant system. Technical Assignment Control (TAC) No. MD4148 has been closed.

Thank you for informing us of the actions documented in your letter. These actions may be examined during a future NRC inspection of your facility.

Current NRC guidance regarding CALs is contained in the NRC Enforcement Policy and the NRC Enforcement Manual, which are available at the NRC web site at http://www.nrc.gov/about-nrc/regulatory/enforcement.html (click on Enforcement Policy or Enforcement Guidance) or by contacting the Government Printing Office (GPO) toll-free at 1-888-293-6498. The GPO is open from 7:00 a.m. to 9:00 p.m. EST, Monday through Friday (except Federal holidays).

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and your response will be made available electronically for public inspection in t he NRC Public Document Room or from the NRC

=s document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm.html.

Sincerely,

/RA/ Catherine Haney, Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Docket No. 50-346

cc: See next page

ML081070270 OFFICE DCI/CPNB DCI/CPNB LPL3-2/PM LPL3-2/LA LPL3-2/BC

NAME JCollins TChan TWengert EWhitt RGibbs DATE 4/17/08 4/17/08 4/17/08 4/17/08 4/25/08 OFFICE DCI/D DRP/D RIII DORL/D NAME MEvans CPedersen CHaney DATE 4/18/08 4/24/08 4/25/08 Page 1 of 2 Davis-Besse Nuclear Power Station, Unit No. 1 cc: Manager, Site Regulatory Compliance FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station Mail Stop A-DB-3065 5501 North State Route 2 Oak Harbor, OH 43449-9760

Director, Ohio Department of Commerce Division of Industrial Compliance Bureau of Operations & Maintenance 6606 Tussing Road P.O. Box 4009 Reynoldsburg, OH 43068-9009

Resident Inspector U.S. Nuclear Regulatory Commission 5503 North State Route 2 Oak Harbor, OH 43449-9760

Stephen Helmer Supervisor, Technical Support Section Bureau of Radiation Protection Ohio Department of Health 35 East Chestnut Street, 7 th Floor Columbus, OH 43215

Carol O'Claire, Chief, Radiological Branch Ohio Emergency Management Agency 2855 West Dublin Granville Road Columbus, OH 43235-2206

Zack A. Clayton

DERR Ohio Environmental Protection Agency P.O. Box 1049 Columbus, OH 43266-0149

State of Ohio - Transportation Department Public Utilities Commission 180 East Broad Street Columbus, OH 43266-0573

Principal Assistant Attorney General Environmental Enforcement Section State Office Tower 30 East Broad Street, 25 th Floor Columbus, OH 43215

President, Board of County Commissioners of Ottawa County Port Clinton, OH 43252

President, Board of County Commissioners of Lucas County One Government Center, Suite 800 Toledo, OH 43604-6506

The Honorable Dennis J. Kucinich United States House of Representatives Washington, D.C. 20515

The Honorable Dennis J. Kucinich United States House of Representatives 14400 Detroit Avenue Lakewood, OH 44107

Joseph J. Hagan President and Chief Nuclear Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-19 76 South Main Street Akron, OH 44308

David W. Jenkins, Attorney FirstEnergy Corporation Mail Stop A-GO-15 76 South Main Street Akron, OH 44308

Danny L. Pace Senior Vice President, Fleet Engineering FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308

Manager, Fleet Licensing FirstEnergy Nuclear Operating Company Mail Stop A-GO-2 76 South Main Street Akron, OH 44308

Page 2 of 2 Davis-Besse Nuclear Power Station, Unit 1 cc:

Director, Fleet Regulatory Affairs FirstEnergy Nuclear Operating Company Mail Stop A-GO-2 76 South Main Street Akron, OH 44308

Jeannie M. Rinckel Vice President, Fleet Oversight FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308

James H. Lash Senior Vice President of Operations and Chief Operating Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Paul A. Harden Vice President, Nuclear Support FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308