ML081190098: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 5: | Line 5: | ||
| author name = | | author name = | ||
| author affiliation = PPL Susquehanna, LLC | | author affiliation = PPL Susquehanna, LLC | ||
| addressee name = Gerlach R | | addressee name = Gerlach R | ||
| addressee affiliation = NRC/Document Control Desk, NRC/NRR | | addressee affiliation = NRC/Document Control Desk, NRC/NRR | ||
| docket = 05000388 | | docket = 05000388 | ||
Line 48: | Line 48: | ||
-UNIT 2 TRM / LOES-2 EFFECTIVE DATE 03/14//2008 SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 44 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)Section Title Effective Date Page TRM / 3.7-18 Page TRM / 3.7-19 Pages TRM / 3.7-20 through TRM /.3.7-22 Pages TRM / 3.7-23 and TRM / 3.7-24 Pages TRM / 3.7-25 and TRM / 3.7-26 Page TRM / 3.7-27 Page TRM / 3.7-28 Page TRM / 3.7-29 Page TRM / 3.7-30 Page TRM / 3.7-31 Page TRM / 3.7-32 Page TRM / 3.7-33 Page TRM / 3.7-34 Pages TRM / 3.7-35 and TRM / 3.7-36 Pages 3.7-37 through 3.7-38 Page TRM / 3.7-39 Pages TRM / 3.7-40 and TRM / 3.7-40a Page TRM / 3.7-41 Page 3.7-42 Pages TRM / 3.7-43 through TRM / 3.7-45 Page TRM / 3.7-46 Page TRM / 3.7-47 Page TRM / 3.7-48 Page TRM / 3.7-49 Page TRM / 3.7-50 Page TRM / 3.7-51 Page TRM / 3.7-52 Page TRM / 3.7-53 ELECTRICAL POWER Page TRM / 3.8-1 Pages TRM / 3.8-2 and TRM / 3.8-3 Page TRM / 3.8-4 Pages TRM / 3.8-5 and TRM / 3.8-6 Pages TRM / 3.8-7 through TRM / 3.8-10 Page TRM / 3.8-11 Page TRM / 3.8-12 Pages 3.8-13 and 3.8-14 Page TRM / 3.8-15 Pages TRM / 3.8-16 and TRM / 3.8-17.Page 3.8-18 Page TRM / 3.8-19 Page TRM / 3.8-20 Pages TRM / 3.8-21 through TRM / 3.8-23 Pages 3.8-24 and 3.8-25 Pages TRM / 3.8-26 through TRM / 3.8-29 08/02/1999 03/31/2006 08/02/1999 03/31/2006 08/02/1999 10/31/2007 11/29/2006 11/16/2001 11/30/2005 11/16/2001 01/09/2004 10/05/2002 | -UNIT 2 TRM / LOES-2 EFFECTIVE DATE 03/14//2008 SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 44 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)Section Title Effective Date Page TRM / 3.7-18 Page TRM / 3.7-19 Pages TRM / 3.7-20 through TRM /.3.7-22 Pages TRM / 3.7-23 and TRM / 3.7-24 Pages TRM / 3.7-25 and TRM / 3.7-26 Page TRM / 3.7-27 Page TRM / 3.7-28 Page TRM / 3.7-29 Page TRM / 3.7-30 Page TRM / 3.7-31 Page TRM / 3.7-32 Page TRM / 3.7-33 Page TRM / 3.7-34 Pages TRM / 3.7-35 and TRM / 3.7-36 Pages 3.7-37 through 3.7-38 Page TRM / 3.7-39 Pages TRM / 3.7-40 and TRM / 3.7-40a Page TRM / 3.7-41 Page 3.7-42 Pages TRM / 3.7-43 through TRM / 3.7-45 Page TRM / 3.7-46 Page TRM / 3.7-47 Page TRM / 3.7-48 Page TRM / 3.7-49 Page TRM / 3.7-50 Page TRM / 3.7-51 Page TRM / 3.7-52 Page TRM / 3.7-53 ELECTRICAL POWER Page TRM / 3.8-1 Pages TRM / 3.8-2 and TRM / 3.8-3 Page TRM / 3.8-4 Pages TRM / 3.8-5 and TRM / 3.8-6 Pages TRM / 3.8-7 through TRM / 3.8-10 Page TRM / 3.8-11 Page TRM / 3.8-12 Pages 3.8-13 and 3.8-14 Page TRM / 3.8-15 Pages TRM / 3.8-16 and TRM / 3.8-17.Page 3.8-18 Page TRM / 3.8-19 Page TRM / 3.8-20 Pages TRM / 3.8-21 through TRM / 3.8-23 Pages 3.8-24 and 3.8-25 Pages TRM / 3.8-26 through TRM / 3.8-29 08/02/1999 03/31/2006 08/02/1999 03/31/2006 08/02/1999 10/31/2007 11/29/2006 11/16/2001 11/30/2005 11/16/2001 01/09/2004 10/05/2002 | ||
.03/31/2006 02/01/1999 08/31/1998 03/31/2006 02/14/2005 01/30/2008 08/31/1998 10/05/2006 06/07/2007 10/05/2006 06/07/2007 03/09/2001 08/16/2006 12/03/2004 04/15/2003 07/29/1999 04/02/2002 01/28/2005 01/31/2005 | .03/31/2006 02/01/1999 08/31/1998 03/31/2006 02/14/2005 01/30/2008 08/31/1998 10/05/2006 06/07/2007 10/05/2006 06/07/2007 03/09/2001 08/16/2006 12/03/2004 04/15/2003 07/29/1999 04/02/2002 01/28/2005 01/31/2005 | ||
*04/02/2002 10/31/2007 08/10/2004 12/03/2004 08/31/1998 01/28/2005 04/02/2002 02/01/1999 04/02/2002 02/01/1999 06/06/1999 08/31/1998 11/29/2006 | *04/02/2002 10/31/2007 08/10/2004 12/03/2004 08/31/1998 01/28/2005 04/02/2002 02/01/1999 04/02/2002 02/01/1999 06/06/1999 08/31/1998 11/29/2006 3.8 SUSQUEHANNA | ||
-UNIT 2 TRM / LOES-3 EFFECTIVE DATE 03/14//2008 SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS PPL Rev. 44 MANUAL)Section Title Effective Date 3.9 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 3.10 3.11 MISCELLANEOUS Page TRM / 3.10-1 Pages 3.10-2 through 3.10-4 Pages TRM / 3.10-5 and TRM / 3.10-6 Page TRM / 3.10-7 Page TRM / 3.10-8 RADIOACTIVE EFFLUENTS Page TRM / 3.11-1 Pages 3.11-2 through 3.11-3 Page TRM / 3.11-4 Page 3.11-5 Page TRM / 3.11-6 Pages 3.11-7 through 3.11-9 Page TRM / 3.11-10 Pages 3.11-11 and 3.11-12 Page TRM / 3.11-13.Page TRM / 3.11-14 Pages 3.11-15 and 3.11-16 Page TRM / 3.11-17 Page 3.11-18 Page TRM / 3.11-19 Pages TRM / 3.11-20 and TRM / 3.11-21 Page TRM / 3.11-22 Page TRM / 3.11-23 Page TRM / 3.11-24 Page TRM / 3.11-25 Pages TRM / 3.11-26 through TRM / 3.11-28 Page TRM / 3.11-29 Pages TRM 3.11-30 through TRM / 3.11-32 Page TRM / 3.11-33 Page 3.11-34 Page TRM / 3.11-35 Pages TRM / 3.11-36 through TRM / 3.11-39 Pages 3.11-40 through 3.11-44 Page TRM / 3.11-45 Page 3.11-46 Page TRM / 3.11-47 08/31/1998 03/31/2006 08/30/1998 03/27/2007 03/31/2006 08/16/2006 03/31/2006 08/31/1998 03/31/2006 08/31/1998 03/31/2006 08/31/1998 12/03/2004 08/31/1998 04/12/2007 12/03/1004 09/01/1998 03/31/2006 08/31/1998 08/15/2005 | -UNIT 2 TRM / LOES-3 EFFECTIVE DATE 03/14//2008 SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS PPL Rev. 44 MANUAL)Section Title Effective Date 3.9 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 3.10 3.11 MISCELLANEOUS Page TRM / 3.10-1 Pages 3.10-2 through 3.10-4 Pages TRM / 3.10-5 and TRM / 3.10-6 Page TRM / 3.10-7 Page TRM / 3.10-8 RADIOACTIVE EFFLUENTS Page TRM / 3.11-1 Pages 3.11-2 through 3.11-3 Page TRM / 3.11-4 Page 3.11-5 Page TRM / 3.11-6 Pages 3.11-7 through 3.11-9 Page TRM / 3.11-10 Pages 3.11-11 and 3.11-12 Page TRM / 3.11-13.Page TRM / 3.11-14 Pages 3.11-15 and 3.11-16 Page TRM / 3.11-17 Page 3.11-18 Page TRM / 3.11-19 Pages TRM / 3.11-20 and TRM / 3.11-21 Page TRM / 3.11-22 Page TRM / 3.11-23 Page TRM / 3.11-24 Page TRM / 3.11-25 Pages TRM / 3.11-26 through TRM / 3.11-28 Page TRM / 3.11-29 Pages TRM 3.11-30 through TRM / 3.11-32 Page TRM / 3.11-33 Page 3.11-34 Page TRM / 3.11-35 Pages TRM / 3.11-36 through TRM / 3.11-39 Pages 3.11-40 through 3.11-44 Page TRM / 3.11-45 Page 3.11-46 Page TRM / 3.11-47 08/31/1998 03/31/2006 08/30/1998 03/27/2007 03/31/2006 08/16/2006 03/31/2006 08/31/1998 03/31/2006 08/31/1998 03/31/2006 08/31/1998 12/03/2004 08/31/1998 04/12/2007 12/03/1004 09/01/1998 03/31/2006 08/31/1998 08/15/2005 | ||
.03/31/2006 04/02/2002 11/14/2006 05/13/2005 04/12/2007 01/21/2004 12/03/2004 01/21/2004 03/31/2006 08/31/1998 03/31/2006 11/30/2005 08/31/1998 03/31/2006 08/31/1998 03/31/2006 SUSQUEHANNA -UNIT 2 TRM / LOES-4 EFFECTIVE DATE 03/14//2008 SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 44 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)Section Title Effective Date 3.12 4.0 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM / 3.12-3 Page TRM / 3.12-4 Page TRM / 3.12-5 02/05/1999 03/14/2008 02/05/1999 08/31/1998 ADMINISTRATIVE CONTROLS Pages 4.0-1 through 4.0-8 SUSQUEHANNA | .03/31/2006 04/02/2002 11/14/2006 05/13/2005 04/12/2007 01/21/2004 12/03/2004 01/21/2004 03/31/2006 08/31/1998 03/31/2006 11/30/2005 08/31/1998 03/31/2006 08/31/1998 03/31/2006 SUSQUEHANNA -UNIT 2 TRM / LOES-4 EFFECTIVE DATE 03/14//2008 SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 44 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)Section Title Effective Date 3.12 4.0 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM / 3.12-3 Page TRM / 3.12-4 Page TRM / 3.12-5 02/05/1999 03/14/2008 02/05/1999 08/31/1998 ADMINISTRATIVE CONTROLS Pages 4.0-1 through 4.0-8 SUSQUEHANNA |
Revision as of 12:07, 12 July 2019
ML081190098 | |
Person / Time | |
---|---|
Site: | Susquehanna |
Issue date: | 04/18/2008 |
From: | Susquehanna |
To: | Gerlach R Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
028401, 2008-17218 | |
Download: ML081190098 (27) | |
Text
Apr. 18, 2008 Page 1 of 2 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2008-17218 USER INFORMATION:
GERLACH*ROSE M Address: NUCSA2 Phone#: 254-3194 EMPL#:028401 CA#: 0363 TRANSMITTAL INFORMATION:
TO: GERLACH*ROSE M 04/18/2008 LOCATION:
USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL.
WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.TRM2 -TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS DATE: 03/04/2008 ADD MANUAL TABLE OF CONTENTS DATE: 04/17/2008 CATEGORY:
DOCUMENTS TYPE: TRM2 Aoo(
Apr. 18, 2008 Page 2 of 2 ID: TEXT 3.12.2 REMOVE: REV:3 ADD: REV: 4 CATEGORY:
DOCUMENTS TYPE: TRM2 ID: TEXT LOES REMOVE: REV:43 ADD: REV: 44 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE.
UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.
PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
SSES MANTJA-L Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 Table Of Contents Issue Date: 0 Procedure Name TEXT LOES Title: LIST OF EF]4/17/2008 FECTIVE SECT Rev Issue Date 44 04/17/2008 IONS 13 01/31/2008 Change ID Change Number TEXT TOC Title: TABLE OF CONTENTS TEXT 1.1 0 11/19/2002 Title: USE AND APPLICATION DEFINITIONS TEXT 2.1 1 02/04/2005'\, Title: PLANT PROGRAMS AND SETPOINTS PLANT PROGRAMS TEXT 2.2 Title: 6 04/09/2007, PLANT PROGRAMS AND. SETPOINTS, INSTRUMENT TRIP SETPOINT TABLE TEXT 3.0 .-3 05/J2/2007 Title: APPLICABILITY TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT 3.1.1 -1 11/09/2007 Title: REACTIVITY CONI TROL [SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION
,"(ATWS-ARI)
INSTRUMENTATION TEXT 3.1.2 0 11/19/2002 Title: REACTIVITY CONTROL SYSTEMS CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT 3.1.3 3 04/09/2007 Title: REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4 0 11/19/2002 Title: REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT 3.2.1 7 04/19/2007 Title: CORE OPERATING LIMITS CORE OPERATING LIMITS REPORT (COLR)Page 1 of 15 Report.Date:
04/17/08 Page I of .15 Report Date: 04/17/08 SSES MANUAL Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.3.1 Title: INSTRUMENTATION TEXT 3.3.2 Title: INSTRUMENTATION TEXT 3.3.3 Title: INSTRUMENTATION TEXT 3.3.4 Title: INSTRUMENTATION TEXT 3.3.5 Title: INSTRUMENTATION TEXT 3.3.6 Title: INSTRUMENTATION TEXT 3.3.7 Title: INSTRUMENTATION TEXT 3.3.8 Title: INSTRUMENTATION TEXT 3.3.9 Title: INSTRUMENTATION TEXT 3.3.10 Title: INSTRUMENTATION TEXT 3.3.11 Title: INSTRUMENTATION TEXT 3.4.1 Title: REACTOR COOLANT 0 11/19/2002 RADIATION.MONITORING INSTRUMENTATION 2 11/09/2007 SEISMIC MONITORING INSTRUMENTATION 2 11/09/2007 METEOROLOGICAL MONITORING INSTRUMENTATION 4 11/09/2007 TRM POST-ACCIDENT MONITORING INSTRUMENTATION 0 11/19/2002 THIS PAGE INTENTIONALLY LEFT BLANK 2 10/19/2005 TRM ISOLATION ACTUATION INSTRUMENTATION 1 11/09/2007 MAIN TURBINE OVERSPEED PROTECTION SYSTEM 1 10/22/2003 TRM RPS INSTRUMENTATION 2 04/09/2007 LPRM UPSCALE ALARM INSTRUMENTATION 1 12/14/2004 REACTOR RECIRCULATION PUMP MG SET STOPS 1 10/22/2003 MVP ISOLATION INSTRUMENTATION 1 04/26/2006 SYSTEM REACTOR COOLANT.SYSTEM CHEMISTRY 0 0 Page 2 of 15 Report Date: 04/17/08 Page2 of .15 Report Date: 04/17/08 SSES MANUJAL Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.4.2 Title: REACTOR TEXT. 3.4.3 Title: REACTOR TEXT. 3.4.4 Title: REACTOR TEXT 3.4.5 Title: REACTOR TEXT 3.5.1 0 11/19/2002 COOLANT SYSTEM STRUCTURAL INTEGRITY 1 11/09/2007 COOLANT SYSTEM REACTOR COOLANT SYSTEM (RCS)1 12/14/2004 COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT 1 04/26/2006 COOLANT SYSTEM REACTOR VESSEL MATERIALS.
1 02/04/2005 Title: ECCS AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2 1 11/09/2007 Title.: ECCS AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3 0 11/19/2002 Title: ECCS AND RCIC LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0 11/19/2002 Title: CONTAINMENT VENTING OR PURGING TEXT 3.6.2 0 11/19/2002 Title: CONTAINMENT SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0 11/19/2002 Title: CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION TEXT 3.6.4 0 11/19/2002 Title: CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT 3.7.1 0 11/19/2002 Title: PLANT SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW) SHUTDOWN Page 3 of i__55 Report Date: 04/17/08 SSES MANUAL Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 0 TEXT 3.7.2 Title: PLANT TEXT 3.7.3.1 Title: PLANT TEXT 3.7.3.-2 Title: PLANT TEXT 3.7.3.3 Title: PLANT TEXT 3.7.3.4 Title: PLANT TEXT 3.7.3.5 Title: PLANT TEXT 3.7.3.6 Title: PLANT TEXT 3.7.3.7 Title: PLANT TEXT 3.7.3.8 Title: PLANT TEXT 3.7.4 Title: PLANT TEXT 3.7.5.1 Title: PLANT TEXT 3.7.5.2 Title: PLANT 0 11/19/2002 SYSTEMS ULTIMATE HEAT SINK (UHS) AND GROUND WATER LEVEL 1 04/26/2006 SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM 2 04/26/2006 SYSTEMS SPRAY AND SPRINKLER SYSTEMS 2 08/18/2005 SYSTEMS C02 SYSTEMS 1 04/26/2006 SYSTEMS HALON SYSTEMS 1 04/26/2006 SYSTEMS FIRE. HOSE STATIONS 1 04/26/2006 SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES 1 04/26/2006 SYSTEMS FIRE RATED ASSEMBLIES 7 11/09/2007 SYSTEMS FIRE DETECTION INSTRUMENTATION 1 04/26/2006 SYSTEMS SOLID RADWASTE SYSTEM 0 11/19/2002 SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR 0 11/19/2002 SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE 0 Page 4 of 15 Report Date: 04/17/08 Page 4 of .15 Report Date: 04/17/08 SSES MANUAL Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.7.5.3 Title: PLANT TEXT 3.7.6 Title: PLANT 1 04/26/2006 SYSTEMS LIQUID HOLDUP TANKS 1 03/01/2005 SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7 1 01/31/2008 Title: PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT 3.7.8 6 06/21/2007 Title: PLANT SYSTEMS SNUBBERS*TEXT 3.7.9 1 08/28/2006 Title: PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 1 12/14/2004 Title: PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)TEXT 3.8.1 Title: ELECTRICAL PROTECTIVE TEXT 3.8.2.1 Title: ELECTRICAL CONTINUOUS TEXT 3.8.2.2 Title: ELECTRICAL AUTOMATIC 2 02/04/2005 POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT DEVICES 2 11/09/2007 POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD 2 12/14/2004 POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION
-PROTECTION
-TEXT 3.8.3 0 11/19/2002 Title: ELECTRICAL POWER DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT 3.8.4 1 02/04/2005 Title: ELECTRICAL POWER 24 VDC ELECTRICAL SUBSYSTEM TEXT 3.8.5 0 11/19/2002 Title: ELECTRICAL POWER DEGRADED VOLTAGE PROTECTION Page 5 of 15 Report Date: 04/17/08 Page 5 of i__55 Report Date: 04/17/08 SSES MANUAL Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.8.6 0 11/19/2002 Title: ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING TEXT 3.8.7 0 12/14/2006 Title: BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT 3.9.1 0 11/19/2002 Title: REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0 11/19/2002 Title: REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 0 11/19/2002 Title: REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 1 04/26/2006.
Title: MISCELLANEOUS SEALED SOURCE CONTAMINATION TEXT 3.10.2 1 04/09/2007 Title: MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 1 04/26/2006 Title: MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)TEXT 3.10.4 1 08/28/2006 Title: MISCELLANEOUS LEADING EDGE FLOW METER (LEFM)TEXT 3.11.1.1 1 04/26/2006 Title: RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION TEXT 3.11.1.2 1 04/26/2006 Title: RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE TEXT 3.11.1.3 1 04/26/2006 Title: RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT SYSTEM Pae6 o 5RprtDt:0/70 Page 6 of _155 Report Date: 04/17/08 SSES MANUAL Manual Name: TRP2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.1.4 Title:,RADIOACTIVE TEXT 3.11.1.5.Title: RADIOACTIVE TEXT 3.11.2.1 Title: RADIOACTIVE TEXT 3.11.2.2 Title: RADIOACTIVE TEXT 3.11.2.3 Title: RADIOACTIVE FORM TEXT 3.11.2.4 Title: RADIOACTIVE TEXT 3.11.2.5 Title: RADIOACTIVE TEXT 3.11.2.6 Title: RADIOACTIVE TEXT 3.11.3 Title: RADIOACTIVE TEXT 3.11.4.1 Title: RADIOACTIVE TEXT 3.11.4.2 Title: RADIOACTIVE TEXT 3.11.4.3 Title: RADIOACTIVE EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS 1 12/14/2004 LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION 2 05/02/2007 RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION 3 04/26/2006 DOSE RATE 1 04/26/2006 DOSE -. NOBLE GASES 1 DOSE 04/26/2006 IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATE 0 11/19/2002 GASEOUS RADWASTE TREATMENT SYSTEM EFFLUENTS EFFLUENTS 3 11/14/2006 VENTILATION EXHAUST 3 05/02/2007 RADIOACTIVE GASEOUS TREATMENT SYSTEM EFFLUENT MONITORING INSTRUMENTATION EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS 1 04/26/2006 TOTAL DOSE 3 04/26/2006 MONITORING PROGRAM 2 04/26/2006 LAND USE CENSUS 1 04/26/2006 INTERLABORATORY COMPARISON PROGRAM Page 7 of 15 Report Date: 04/17/08 Page 7 of .1_55 Report Date: 04/17/08 SSES MANUAL Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 0 TEXT 3.12.1 Title: LOADS CONTROL TEXT 3.12.2 Title: LOADS CONTROL TEXT 3.12.3 Title: LOADS CONTROL TEXT B3.0 Title: APPLICABILITY 0 11/19/2002 PROGRAM CRANE TRAVEL-SPENT FUEL STORAGE POOL 4 04/17/2008 PROGRAM HEAVY LOADS.REQUIREMENTS 0 .11/19/2002 PROGRAM LIGHT LOADS REQUIREMENTS 3 05/02/2007 BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO)APPLICABILITY TEXT B3.1.1 1 11/09/2007 Title: REACTIVITY CONTROL SYSTEM BASES.ANTICIPATED TRANSIENT WITHOUT ROD INJECTION (ATWS-ARI)
INSTRUMENTATION SCRAM ALTERNATE I I TEXT B3.1.2 0 11/19/2002 Title: REACTIVITY CONTROL SYSTEM BASES CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT B3.1.3 3 04/10/2007 Title: REACTIVITY CONTROL SYSTEM BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.1.4 0 11/19/2002 Title: REACTIVITY CONTROL SYSTEM BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT B3.2.1 0 11/19/2002 Title: CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR)TEXT B3.3.1 0 11/19/2002 Title: INSTRUMENTATION BASES RADIATION MONITORING INSTRUMENTATION TEXT B3.3.2 1 11/09/2007 Title: INSTRUMENTATION BASES SEISMIC MONITORING INSTRUMENTATION TEXT B3.3.3 2 11/09/2007 Title: INSTRUMENTATION BASES METEOROLOGICAL MONITORING INSTRUMENTATION Page 8 of 15 Report Date: 04/17/08 Page 8 of .15 Report Daýte: 04/17/08 SSE~S MANUJAL Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.3.4 Title: INSTRUMENTATION TEXT B3.3 .5 Title: INSTRUMENTATION TEXT B3.3.6 Title: INSTRUMENTATION TEXT B3.3.7 Title: INSTRUMENTATION TEXT B3.3.8 Title: INSTRUMENTATION TEXT B3.3.9 Title: INSTRUMENTATION TEXT B3.3.10 Title: INSTRUMENTATION TEXT B3.3.11 Title: INSTRUMENTATION TEXT B3.4.1 Title: REACTOR COOLANT 3 11/09/2007 BASES TRM POST ACCIDENT MONITORING (PAM) INSTRUMENTATION 2 11/09/2007 BASES THIS PAGE INTENTIONALLY LEFT BLANK 3 10/19/2005 BASES TRM ISOLATION ACTUATION INSTRUMENTATION 1 ..11/09/2007 BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM 1 10/22/2003 BASES TRM RPS INSTRUMENTATION 2 .04/10/2007 BASES LPRM UPSCALE ALARM INSTRUMENTATION 0 11/19/2002 BASES.REACTOR RECIRCULATION PUMP MG SET STOPS.1 10/22/2003 BASES MVP ISOLATION INSTRUMENTATION 0 11/19/2002 SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY.
TEXT B3.4.2 0 11/19/2002 Title: REACTOR COOLANT SYSTEM BASES STRUCTURAL INTEGRITY TEXT B3.4.3 1 11/09/2007 Title: REACTOR COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR TEXT B3.4.4 0 11/19/2002 Title: REACTOR COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT Page 9 of .15 Report Date: 04/17/08 SSES MANUAL Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 0 TEXT B3.4.5 0 11/19/2002 Title: REACTOR COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS TEXT B3*,5.1 0 11/19/2002 Title: ECCS AND RCIC BASES ADS MANUAL INHIBIT TEXT B3,5.2 1 11/09/2007 Title: ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT B3.5.3 1 11/09/2007 Title: ECCS AND RCIC BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.1 0 11/19/2002 Title: CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2 0 11/19/2002 Title: CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT B3.6.3 1 04/19/2007 Title: CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION TEXT B3.6.4 1 12/14/2004 Title: CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.1 0 11/19/2002 Title: PLANT SYSTEMS BASES EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN)
TEXT B3.7.2 0 11/19/2002 Title: PLANT SYSTEMS BASES ULTIMATE HEAT SINK (UHS) GROUND WATER LEVEL TEXT B3.7.3.1 2 01/07/2008 Title: PLANT SYSTEMS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT B3.7.3.2 2. 04/26/2006 Title: PLANT SYSTEMS BASES SPRAY AND SPRINKLER SYSTEMS Pag 1 of15ReprtDat:
4/1/0 Page 1_90 of 15 Report Date: 04/17/08 SSES MANUAL Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.3.3 Title: PLANT TEXT B3.7.3.14 Title: PLANT TEXT B3.7.3.5 Title: PLANT TEXT B3.7.3.6 Title: PLANT TEXT B3.7.3.7 Title: PLANT TEXT B3.7.3.8 Title: PLANT TEXT B3.7.4 Title: PLANT TEXT B3.7.5.1 Title: .PLANT TEXT B3.7.5.2 Title: PLANT TEXT B3.7.5.3 Title: PLANT TEXT B3.7.6 Title: PLANT SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES 0 11/19/2002 C02 SYSTEMS 1 04/26/2006 HALON SYSTEMS 1 04/26/2006 FIRE HOSE STATIONS 1 04/26/2006 YARD FIRE HYDRANTS AND HYDRANT 0 11/19/2002 FIRE RATED ASSEMBLIES 1 .01/12/2004 FIRE DETECTION INSTRUMENTATION 0 11/19/2002 SOLID RADWASTE SYSTEM 0 11/19/2002 MAIN CONDENSER OFFGAS HYDROGEN 0 11/19/2002 MAIN CONDENSER OFFGAS EXPLOSIV: 0 11/19/2002 LIQUID HOLDUP TANKS 1 03/01/2005 ESSW PUMPHOUSE VENTILATION 2 01/31/2008 HOSE HOUSES MONITOR E GAS MIXTURE TEXT B3.7.7* Title: PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION Page 11. of 15 Report Date: 04/17/08 SSES MANUAL Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.8 3 06/21/2007 Title: PLANT SYSTEMS BASES SNUBBERS TEXT B3.7.9 1 12/14/2004 Title: PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10 1 12/14/2004 Title: PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT B3.8.1 Title: ELECTRICAL PROTECTIVE TEXT B3.8.2.1 Title: ELECTRICAL CONTINUOUS TEXT B3.8.2.2 Title: ELECTRICAL AUTOMATIC TEXT B3.8.3-Title: ELECTRICAL TEXT B3.8.4 Title: ELECTRICAL TEXT B3.8.5 Title: ELECTRICAL TEXT B3.8.6 Title: ELECTRICAL TEXT B3.8.7 1 ý 02/04/2005 POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT DEVICES 0 11/19/2002 POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD 1 09/17/2004 POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION
-PROTECTION
-POWER BASES POWER BASES 0 11/19/2002 DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES 0 11/19/2002 24 VDC ELECTRICAL POWER SUBSYSTEM 0 11/19/2002 POWER BASES DEGRADED VOLTAGE PROTECTION 1 02/04/2005 POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING 0 12/14/2006 Title: BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT B3.9.1 0 11/19/2002 Title: REFUELING OPERATIONS BASES DECAY TIME Page 12 of 15 Report Date: 04/17/08 Page 12 of .15 Report Date: 04/17/08 SSES MANUAL Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.9.2 0 Title: REFUELING OPERATIONS BASES TEXT B3.9.3 0 Title: REFUELING OPERATIONS BASES 11/19/2002 COMMUNICATIONS 11/19/2002 REFUELING PLATFORM 11/19/20,02 SOURCE CONTAMINATION TEXT B3.10.1 Title: MISCELLANEOUS 0 BASES SEALED TEXT B3.10.2 1 04/10/2007 Title: MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3 0 11/19/2002 Title: MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)TEXT B3.10.4 0 11/19/2002 Title: MISCELLANEOUS BASES LEADING EDGE FLOW METER (LEFM)TEXT B3.11.1.1 Title: RADIOACTIVE TEXT B3.11.1.2 Title: RADIOACTIVE TEXT B3.11.1.3 Title: RADIOACTIVE TEXT B3.11.1.4 Title: RADIOACTIVE 0 11/19/2002 EFFLUENTS BASES LIQUID EFFLUENTS CONCENTRATION EFFLUENTS EFFLUENTS EFFLUENTS 0 11/19/2002 BASES LIQUID EFFLUENTS DOSE 0 11/19/2002 BASES LIQUID WASTE TREATMENT SYSTEM 0 11/19/2002 BASES.LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.1.5 Title: RADIOACTIVE EFFLUENTS 0 11/19/2002 BASES RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT B3.11.2.1 1 12/14/2004 Title: RADIOACTIVE EFFLUENTS BASES DOSE RATE.Page 13 of 15 Report Date: 04/17/08 Page 13 of .15 Report Date: 04/17/08 SSES MANUAL Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.11.2.2 Title: RADIOACTIVE EFFLUENTS TEXT B3.11.2.3 Title: RADIOACTIVE EFFLUENTS PARTICULATES FORM TEXT B3.11.2.4 Title: RADIOACTIVE EFFLUENTS TEXT B3.11.2.5 Title: RADIOACTIVE EFFLUENTS TEXT B3.11.2.6 Title: RADIOACTIVE EFFLUENTS INSTRUMENTATION TEXT B3.11.3 Title: RADIOACTIVE EFFLUENTS TEXT B3.11.4.1 Title: RADIOACTIVE EFFLUENTS 0 11/19/2002 BASES DOSE -NOBLE GASES 0 11/19/2002 BASES DOSE -IODINE, TRITIUM, AND RADIONUCLIDES IN 0 11/19/2002 BASES GASEOUS RADWASTE TREATMENT SYSTEM 4 11/14/2006 BASES VENTILATION EXHAUST TREATMENT SYSTEM 1 01/27/2004 BASES RADIOACTIVE GASEOUS EFFLUENT MONITORING 0 11/19/2002 BASES TOTAL.DOSE 2 01/06/2006 BASES MONITORING PROGRAM TEXT B3.11.4.2 0 11/19/2002 Title: RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS TEXT B3.11.4.3 Title: RADIOACTIVE EFFLUENTS TEXT B3.12.1 Title: LOADS CONTROL PROGRAM 0 11/19/2002 BASES INTERLABORATORY COMPARISON PROGRAM 1 BASES 10/04/2007 CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12.2 0 11/19/2002 Title: LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS TEXT B3.12.3 0 11/19/2002 Title: LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS Page 14 of 15 Report Date: 04/17/08 Page 14 of 15 Report Date: 04/17/08 SSES MANUAL Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 4.1 Title: TEXT 4.2 Title: TEXT 4.3 Title: TEXT 4.4 Title: TEXT 4.5 Title: TEXT 4.6 Title: TEXT 4 .7 Title: ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE 0 09/27/2003 CONTROLS ORGANIZATION 0 09/27/2003 CONTROLS REPORTABLE EVENT ACTION 0 09/27/2003 CONTROLS SAFETY LIMIT VIOLATION 0 09/27/2003 CONTROLS PROCEDURES
& PROGRAMS 0 09/27/2003 CONTROLS REPORTING REQUIREMENTS 0 09/27/2003 CONTROLS RADIATION PROTECTION PROGRAM 0 09/27/2003 CONTROLS TRAINING Page 15 of 15 Report Date: 04/17/08 Page 15 of .15 Report Date: .04/17/08 SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 44 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)Section Title Effective Date TOC 1.0 TABLE OF CONTENTS USE AND APPLICATION Page TRM / 1.0-1 Page TRM / 1.0-2 Page TRM / 1.0-3 2.0 3.0 3.1 3.2 PLANT PROGRAMS Page 2.0-1 Pages TRM / 2.0-2 and TRM 2.0-3 Page TRM / 2.0-4 Page TRM / 2.0-5 Pages TRM / 2.0-6 and TRM / 2.0-7 Page TRM / 2.0-8 Pages TRM / 2.0-9 through TRM / 2.0-11 Page TRM / 2.0-12 Pages TRM / 2.0-13 and TRM /2.0-14 Page TRM / 2.0-15 APPLICABILITY
--Page TRM / 3.0-1 Page TRM /3.0-2 Page TRM / 3.0-3 7 Page TRM / 3.0-4 REACTIVITY CONTROL SYSTEMS Page TRM / 3.1-1\Pages TRM a3,"1-2throuýgh TRM / 3.1-5 Pages TRM/ 3.1-6 th'rough TRM / 3.1-8 Pages TRM)a 3,1ý-9and TRM / 3.1-9a Page/TRMJ/
3..1-1J0 CORE OPERATING LIMITS REPORT PageýTRTM/
3.2-1 Pages TRM / 3.2-2 through TRM / 3.2-48 INSTRUMENTATION Pages TRM / 3.3-1 through TRM / 3.3-3 Pages TRM / 3.3-4 and TRM / 3.3-5 Page 3.3-6 Page TRM 3.3-7 Page 3.3-8 Page TRM / 3.3-9 Page TRM / 3.3-9a Page TRM / 3.3-10 Page TRM / 3.3-11 Page TRM / 3.3-1 Ia 01/30/2008 08/31/1998 10/04/2002 08/31/1998 08/31/1998 01/28/2005 06/25/2002 04/12/1999 03/27/2007 12/03/2004 11/15/2004 03/27/2007 11/15/2004 11/15/2005 01/10/2007 04/12/2007 03/15/2002 11/30/2005 10/31/2007 08/31/1998 03/27/2007 02/18/1999 02/18/1999 08/31/1998 03/30/2007 07/16/1999 10/31/2007 08/31/1998 10/31/2007 08/31/1998 04/12/2007 12/17/1998 10/31/2007 06/02/2005 05/30/2006
/9 3.3 SUSQUEHANNA
-UNIT 2 TRM / LOES-1 EFFECTIVE DATE 03/14/2008 SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 44 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)Section Title 3.4 N 3.5 Page TRM / 3.3-12 Page TRM / 3.3-13 Page TRM / 3.3-14 Page TRM / 3.3-15 Page TRM / 3.3-16 Page TRM / 3.3-17 Page TRM / 3.3-18 Pages TRM / 3.3-19 and TRM / 3.3-20 Page TRM / 3.3-21 Page TRM / 3.3-21a Pages TRM /3.3-21b through TRM / 3.3-21d Page TRM / 3.3-22 Pages TRM / 3.3-23 and TRM / 3.3-24 Page TRM / 3.3-25 REACTOR COOLANT -SYSTEM Page TRM / 3.4-1 Pages 3.4-2 through 3.4-5 Pages 3.4-6 through 3.4-9 Page 3.4-10 Page 3.4-11 Page TRM / 3.4-12 Page TRM / 3.4-13 EMERGENCY CORE COOLING AND RCIC Page TRM / 3.5-1 Pages 3.5-2 and 3.5-3 Page TRM / 3.5-4 Pages 3.5-5 through 3.5-7 CONTAINMENT Pages 3.6-1 through 3.6-4 Page TRM / 3.6-5 Page 3.6-6 Pages TRM / 3.6-7 through TRM / 3.6-9 PLANT SYSTEMS Pages TRM / 3.7-1 and TRM / 3.7-2 Page 3.7-3 Pages TRM / 3.7-4 and TRM / 3.7-5 Pages TRM / 3.7-6 through TRM / 3.7-8 Page TRM / 3.7-9 Page TRM / 3.7-10 Page TRM / 3.7-11 Pages TRM / 3.7-12 and TRM / 3.7-13 Page TRM / 3.7-14 Pages TRM / 3.7-15 and TRM / 3.7-16 Page TRM / 3.7-17 Effective Date 03/30/2001 09/13/2005 12/14/1998 10/22/2003 06/27/2001 06/14/2002 10/31/2007 10/22/2003 03/27/2007 11/15/2004 03/27/2007 12/03/2004 05/16/2003 10/22/2003 03/31/2006 10/23/1998 08/31/1998 10/31/2007 08/31/1998 12/03/2004 03/31/2006 01/28/2005 08/31/1998 10/31/2007 08/31/1998 08/31/1998 01/07/2002 08/31/1998 12/31/2002 07/29/1999 08/31/1998 03/31/2006 08/02/1999 03/31/2006 08/16/2005 01/21/2000 08/02/1999 08/09/2005 08/02/1999 03/31/2006 3.6 3.7 SUSQUEHANNA
-UNIT 2 TRM / LOES-2 EFFECTIVE DATE 03/14//2008 SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 44 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)Section Title Effective Date Page TRM / 3.7-18 Page TRM / 3.7-19 Pages TRM / 3.7-20 through TRM /.3.7-22 Pages TRM / 3.7-23 and TRM / 3.7-24 Pages TRM / 3.7-25 and TRM / 3.7-26 Page TRM / 3.7-27 Page TRM / 3.7-28 Page TRM / 3.7-29 Page TRM / 3.7-30 Page TRM / 3.7-31 Page TRM / 3.7-32 Page TRM / 3.7-33 Page TRM / 3.7-34 Pages TRM / 3.7-35 and TRM / 3.7-36 Pages 3.7-37 through 3.7-38 Page TRM / 3.7-39 Pages TRM / 3.7-40 and TRM / 3.7-40a Page TRM / 3.7-41 Page 3.7-42 Pages TRM / 3.7-43 through TRM / 3.7-45 Page TRM / 3.7-46 Page TRM / 3.7-47 Page TRM / 3.7-48 Page TRM / 3.7-49 Page TRM / 3.7-50 Page TRM / 3.7-51 Page TRM / 3.7-52 Page TRM / 3.7-53 ELECTRICAL POWER Page TRM / 3.8-1 Pages TRM / 3.8-2 and TRM / 3.8-3 Page TRM / 3.8-4 Pages TRM / 3.8-5 and TRM / 3.8-6 Pages TRM / 3.8-7 through TRM / 3.8-10 Page TRM / 3.8-11 Page TRM / 3.8-12 Pages 3.8-13 and 3.8-14 Page TRM / 3.8-15 Pages TRM / 3.8-16 and TRM / 3.8-17.Page 3.8-18 Page TRM / 3.8-19 Page TRM / 3.8-20 Pages TRM / 3.8-21 through TRM / 3.8-23 Pages 3.8-24 and 3.8-25 Pages TRM / 3.8-26 through TRM / 3.8-29 08/02/1999 03/31/2006 08/02/1999 03/31/2006 08/02/1999 10/31/2007 11/29/2006 11/16/2001 11/30/2005 11/16/2001 01/09/2004 10/05/2002
.03/31/2006 02/01/1999 08/31/1998 03/31/2006 02/14/2005 01/30/2008 08/31/1998 10/05/2006 06/07/2007 10/05/2006 06/07/2007 03/09/2001 08/16/2006 12/03/2004 04/15/2003 07/29/1999 04/02/2002 01/28/2005 01/31/2005
- 04/02/2002 10/31/2007 08/10/2004 12/03/2004 08/31/1998 01/28/2005 04/02/2002 02/01/1999 04/02/2002 02/01/1999 06/06/1999 08/31/1998 11/29/2006 3.8 SUSQUEHANNA
-UNIT 2 TRM / LOES-3 EFFECTIVE DATE 03/14//2008 SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS PPL Rev. 44 MANUAL)Section Title Effective Date 3.9 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 3.10 3.11 MISCELLANEOUS Page TRM / 3.10-1 Pages 3.10-2 through 3.10-4 Pages TRM / 3.10-5 and TRM / 3.10-6 Page TRM / 3.10-7 Page TRM / 3.10-8 RADIOACTIVE EFFLUENTS Page TRM / 3.11-1 Pages 3.11-2 through 3.11-3 Page TRM / 3.11-4 Page 3.11-5 Page TRM / 3.11-6 Pages 3.11-7 through 3.11-9 Page TRM / 3.11-10 Pages 3.11-11 and 3.11-12 Page TRM / 3.11-13.Page TRM / 3.11-14 Pages 3.11-15 and 3.11-16 Page TRM / 3.11-17 Page 3.11-18 Page TRM / 3.11-19 Pages TRM / 3.11-20 and TRM / 3.11-21 Page TRM / 3.11-22 Page TRM / 3.11-23 Page TRM / 3.11-24 Page TRM / 3.11-25 Pages TRM / 3.11-26 through TRM / 3.11-28 Page TRM / 3.11-29 Pages TRM 3.11-30 through TRM / 3.11-32 Page TRM / 3.11-33 Page 3.11-34 Page TRM / 3.11-35 Pages TRM / 3.11-36 through TRM / 3.11-39 Pages 3.11-40 through 3.11-44 Page TRM / 3.11-45 Page 3.11-46 Page TRM / 3.11-47 08/31/1998 03/31/2006 08/30/1998 03/27/2007 03/31/2006 08/16/2006 03/31/2006 08/31/1998 03/31/2006 08/31/1998 03/31/2006 08/31/1998 12/03/2004 08/31/1998 04/12/2007 12/03/1004 09/01/1998 03/31/2006 08/31/1998 08/15/2005
.03/31/2006 04/02/2002 11/14/2006 05/13/2005 04/12/2007 01/21/2004 12/03/2004 01/21/2004 03/31/2006 08/31/1998 03/31/2006 11/30/2005 08/31/1998 03/31/2006 08/31/1998 03/31/2006 SUSQUEHANNA -UNIT 2 TRM / LOES-4 EFFECTIVE DATE 03/14//2008 SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 44 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)Section Title Effective Date 3.12 4.0 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM / 3.12-3 Page TRM / 3.12-4 Page TRM / 3.12-5 02/05/1999 03/14/2008 02/05/1999 08/31/1998 ADMINISTRATIVE CONTROLS Pages 4.0-1 through 4.0-8 SUSQUEHANNA
-UNIT 2 TRM / LOES-5 EFFECTIVE DATE 03/14//2008 SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 44 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)Section Title Effective Date B 3.0 B 3.1 B 3.2 B 3.3 B 3_4 APPLICABILITY BASES Pages TRM / B 3.0-1 through TRM / B 3.0-3 Page TRM / B 3.0-4 Pages TRM / B 3.0-5 and TRM / B 3.0-6 Page TRM / B 3.0-7 Pages TRM / B 3.0-8 through TRM / B 3.0-10 Pages TRM / B 3.0-11 and TRM / B 3.0-12 Pages TRM / B 3.0-13 and TRM / B 3.0-14 Page TRM / B 3.0-15 REACTIVITY CONTROL SYSTEMS BASES Page TRM / B 3.1-1 Pages TRM / B 3.1-2 and TRM / B 3.1-3 Page B 3.1-4 Pages TRM / B 3.1-5 through TRM / B 3.1-7 Page TRM / B 3.1-8 CORE OPERATING LIMITS BASES Page B 3.2-1 INSTRUMENTATION BASES Page TRM / B 3.3-1 Pages TRM / B 3.3-2 and TRM / B-3.3-2a Pages TRM / B 3.3-3 and TRM / B 3.3-3a Pages TRM / B 3.3-4 and TRM / B 3.3-5 Pages TRM / B 3.3-6 through TRM / B 3.3-9 Page B 3.3-10 Pages TRM / B 3.3-11 and TRM / B 3.3-12 Page TRM / B 3.3-13 Page TRM / B 3.3-14 Page TRM / B 3.3-14a Page TRM / B 3.3-14b Pages TRM / B 3.3-15 through TRM / B 3.3-17 Pages TRM / B 3.3-18 and TRM / B 3.3-19 Pages TRM / B 3.3-19a through TRM / B 3.3-19e Pages TRM / B 3.3-20 and TRM / B 3.3-21 Page TRM / B 3.3-22 Page TRM / B 3.3-23 REACTOR COOLANT SYSTEM BASES Pages B 3.4-1 through B 3.4-3 Pages TRM / B 3.4-4 and TRM / B 3.4-4a Page TRM / B 3.4-5 Page B 3.4-6 08/31/1998 01/10/2007 08/31/1998 04/12/2007 08/31/1998 03/15/2002 11/30/2005 03/15/2002 07/13/1999 10/31/2007 08/31/1998 03/27/2007 02/18/1999 08/31/1998 04/07/2000 10/31/2007 10/31/2007 05/30/2006 10/31/2007 08/31/1998 09/13/2005 12/03/2004 06/25/2002 10/31/2007 06/14/2002 10/22/2003 03/27/2007 03/27/2007 05/16/2003 10/22/2003 05/16/2003 08/31/1998 10/31/2007 10/15/1999 08/31/1998 SUSQUEHANNA
-UNIT 2 TRM / LOES-6 EFFECTIVE DATE 03/14//2008 SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 44 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)Section Title Effective Date B 3.5 B 3.6 B 3.7 ECCS AND RCIC BASES Pages B 3.5-1 and B 3.5-2 Pages TRM / B 3.5-3 and TRM / B 3.5-3a Page B 3.5-4 Page TRM / B 3.5-5 CONTAINMENT BASES Page TRM / B 3.6-1 Page TRM / B 3.6-2 Page B 3.6-3 Page TRM / B 3.6-4 Page TRM / B 3.6-5 Page TRM / B 3.6-6 Pages TRM / B 3.6-7 through TRM / B 3.6-11 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 Pages TRM / B 3.7-3 and TRM / B 3.7-3a Page TRM / B 3.7-4 Page TRM / B 3.7-5 Pages TRM / B 3.7-6 and TRM / B 3.7-6a Pages TRM / B 3.7-7 and TRM / B 3.7-7a Page TRM / B 3.7-8 Page TRM / B 3.7-9 Page TRM / B 3.7-10 Pages TRM / B 3.7-10a through TRM / B 3.7-11a Pages TRM / B 3.7-12 through TRM / B 3.7-14 Pages TRM / B 3.7-14a and TRM / B 3.7-14b Pages TRM / B 3.7-15 and TRM / B 3.7-16 Pages B 3.7-17 through B 3.7-20 Pages TRM / B 3.7-21 and TRM / B3.7-21a Pages TRM / B 3.7-22 and TRM / B 3.7-23 Pages TRM / B 3.7-24 through TRM / B 3.7-29 Page TRM / B 3.7-30 Pages TRM / B 3.7-30a and TRM / B 3.7-30b Page TRM / B 3.7-31 Page TRM / B 3.7-32 Page TRM / B 3.7-33 Page TRM / B 3.7-34 Page TRM / B 3.7-35 08/31/1998 10/31/2007 08/31/1998 10/31/2007 07/26/2001 02/01/1999 08/31/1998 03/29/2007 04/04/2007 12/03/2004 12/31/2002 08/31/1998 12/27/2007 03/31/2006 08/02/1999 03/31/2006 08/02/1999 08/02/1999 03/31/2006 08/02/1999 03/31/2006 08/02/1999 01/09/2004 02/01/1999 08/31/1998 02/14/2005 01/30/2008 10/05/2006 06/07/2007 10/05/2006 12/03/2004 03/09/2001 04/15/2003 12/03/2004 07/05/2000 SUSQUEHANNA
-UNIT 2 TRM / LOES-7 EFFECTIVE DATE 03/14//2008 SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 44 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)Section Title Effective Date B 3.8 B.3.9 ELECTRICAL POWER BASES Page TRM / B 3.8-1 Pages TRM / B 3.8-2 and TRM / B 3.8-2a Page TRM / B 3.8-3 Page TRM / B 3.8-3a Page TRM / B 3.8-4 Page TRM / B 3.8-4a Page TRM / B 3.8-5 Pages TRM / B 3.8-6 through TRM / B 3.8-16 Page TRM / B 3.8-17 Pages TRM / B 3.8-18 through TRM B B 3.8-24 REFUELING OPERATIONS BASES Pages B 3.9-1 and B 3.9-2 Pages B 3.9-3 through B 3.9-7 B 3.10 MISCELLANEOUS BASES Page B 3.10-1 Pages TRM / B 3.10-2 and TRM / B 3.10-3 Pages TRM / B 3.10-4 and TRM / 8 3.10-5 Pages TRM / B 3.10-6 and TRM / 3.10-7 8 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 Page TRM / B 3.11-10 Pages TRM/B 3.11-11 and TRM/B 3.11-11a Pages TRM/B 3.11-12 and TRM/B 3.11-13 Page TRM / B 3.11-14 Page TRM / 8 3.11-15 Pages B 3.11-16 through B 3.11-19 Page TRM / B 3.11-20 Page TRM / B 3.11-20a Page TRM / B 3.11-21 Pages TRM / B 3.11-22 and TRM / B 3.11-23 Page TRM / B 3.11-23a Pages TRM / B 3.11-24 and TRM / 8 3.11-25 Pages B 3.11-26 through B 3.11-27 Pages TRM / 8 3.11-28 and TRM / B 3.11-29 Page TRM / 8 3.11-30 Pages 8 3.11-31 through 8 3.11-35 Page TRM / 8 3.11-36 B.3.12 LOADS CONTROL PROGRAM BASES Page TRM / B 3.12-1 Pages TRM / 8 3.12-2 and TRM / B 3.12-3 TRM2 text LOES.doc 4/3/08 04/02/2002 01/28/2005 04/02/2002 04/02/2002 04/02/2002 08/10/2004 08/31/1998 04/02/2002 01/28/2005 11/29/2006 08/31/1998 10/23/1998 08/31/1998 03/27/2007 08/23/1999 04/17/2002 08/31/1998 02/01/1999 04/07/2000 02/01/1999 12/03/2004 02/01/1999 08/31/1998 04/02/2002 04/02/2002 05/13/2005 11/14/2006 05/13/2005 01/21/2004 08/31/1998 11/30/2005 12/03/2004 08/31/1998 02/12/1999 09/19/2007 02/05/1999 SUSQUEHANNA
-UNIT 2 TRM / LOES-8 EFFECTIVE DATE 03/14/2008 Heavy Loads Requirements 3.12.2 PPL Rev. 4 3.12 Loads Control Program 3.12.2 Heavy Loads Requirements TRO 3.12.2 APPLICABILITY:
The Technical Specification Limiting Conditions of Operation and Technical Requirements for Operation listed in Table 3.12.2-1 shall be met.During movement of heavy loads in the proximity of irradiated fuel.ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. The Conditions of A.1 Suspend movement of Immediately TRO 3.12.2 are not met. heavy loads in the proximity of irradiated fuel.TECHNICAL REQUIREMENT SURVEILLANCE SURVEILLANCE FREQUENCY TRS 3.12.2.1 Administratively verify that all requirements of Within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> prior TRO are met. to commencing movement of heavy loads AND Every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter SUSQUEHANNA
-UNIT 2 TRM / 3.12-3 EFFECTIVE DATE 02/05/1999 Heavy Loads Requirements PPL Rev. 4 3.12.2 TABLE 3.12.2-1 TRO 3.12.2 REQUIREMENTS
- a. LCO 3.3.6.2(a)
- b. LCO 3.3.7.1(b)
- c. LCO 3.6.4.1(c)
- d. LCO 3.6.4.2(c)
- e. LCO 3.6.4.3(d)f. LCO 3.7.3(d)g. LCO 3.7.7(e)h. LCO 3.8.2()I i. LCO 3.8.5 j. LCO 3.8.8(l)k. LCO 3.9.6(g)I. TRO 3.3.4(D M. TRO 3.7.1(h)n. TRO 3.9.1 (9)(a) One trip system with all associated channels OPERABLE (Functions 3, 4, 5, 6 and 8).Note that the available trip system must support the Table 3.12.2-le required SGT subsystem.(b) One trip system with all associated channels OPERABLE (Functions 3, 4, 5, 6, 8 and 9).Note that the available trip system must support the Table 3.12.2-1f required CREOAS subsystem.(c) Zone III only.(d) Minimum of one subsystem OPERABLE.(e) Only required for movement of heavy load in the proximity of irradiated fuel in the spent fuel storage pool.( Minimum of one Table 3.3.4-1 Function 4 channel OPERABLE.(g) Only required for movement of heavy load in the proximity of irradiated fuel in the Reactor Pressure Vessel with the Steam Separator removed.(h) Two ESW pumps capable of supplying cooling to the required diesel generators.) Necessary AC Sources and Distribution Systems OPERABLE to support equipment required to be OPERABLE by TRM Table 3.12.2-1.SUSQUEHANNA
-UNIT 2 TRM / 3.12-4 EFFECTIVE DATE 03/14/2008