Letter Sequence Meeting |
---|
|
|
MONTHYEARML1207501092012-03-15015 March 2012 Notice of Meeting with Tennessee Valley Authority to Discuss Pre-submittal Planning for Licensing Basis Change Regarding Hydrology for Watts Bar Nuclear Plant, Unit 1 Project stage: Request ML12097A3122012-03-29029 March 2012 3/29/2012 Meeting Slides - Pre-Submittal Meeting Regarding Watts Bar Unit 1 Hydrology Licensing Basis Change Project stage: Meeting ML12097A3062012-04-11011 April 2012 3/29/2012 Summary of Pre-Application Meeting with Tennessee Valley Authority on Changing the Licensing Basis for Hydrologic Engineering Project stage: Meeting ML12236A1672012-07-19019 July 2012 Application to Revise Watts Bar Nuclear Plant, Unit 1 Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis, TAC No. ME8200 (WBN-UFSAR-12-01) Project stage: Request ML12226A5612012-08-10010 August 2012 Application to Revise Sequoyah Nuclear Plant Units I and 2 Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis, (SQN-TS-12-02) Project stage: Request ML12226A5622012-08-10010 August 2012 Enclosure 1, Evaluation of Proposed Changes Attachment 1 Proposed SQN Units 1 and 2 UFSAR Text Changes (Markups), Page 2.4-1 Through 2.4-41 Project stage: Request ML12226A5632012-08-10010 August 2012 Enclosure 1, Evaluation of Proposed Changes Attachment 1 Proposed SQN Units 1 and 2 UFSAR Text Changes (Markups), Page 2.4-42 Through Enclosure 2 Project stage: Request ML12276A3752012-10-0101 October 2012 Notification of Completion of Review of Updated Hydrologic Analysis Results for Impact on Watts Bar Nuclear Plant (WBN) Units 1 and 2 Final Environmental Statements Project stage: Other ML12292A3962012-10-19019 October 2012 Forthcoming Meeting with Tennessee Valley Authority Regarding Hydrology Issues Project stage: Request ML12319A1722012-11-14014 November 2012 Meeting Notice with Tennessee Valley Authority to Discuss Hydrology Issues at Watts Bar Nuclear Plant, Unit 1 Project stage: Request ML12348A2082012-12-13013 December 2012 Meeting Slides Re TVA Hydrology Update Slides Project stage: Request ML13010A1372013-01-11011 January 2013 Summary of Meeting with TVA Regarding Hydrology Updates Project stage: Request ML13037A3262013-01-31031 January 2013 Submittal Date for Supplement to Application to Revise Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis (WBN-UFSAR-12-01) Project stage: Supplement CNL-14-026, Transmittal of Supplemental Clarification Information for the Application to Revise Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis, TAC No. ME8200 (WBN-UFSAR-12-01)2014-02-28028 February 2014 Transmittal of Supplemental Clarification Information for the Application to Revise Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis, TAC No. ME8200 (WBN-UFSAR-12-01) Project stage: Supplement 2012-03-29
[Table View] |
|
---|
Category:Slides and Viewgraphs
MONTHYEARML24284A0042024-10-16016 October 2024 Application to Use Online Monitoring Methodology for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant Session Slides ML24228A2312024-08-15015 August 2024 TVA Meeting Slides for August 19 Public Meeting Re QAPD Supplement ML24225A2542024-08-14014 August 2024 August 14, 2024 - TVA Pre-Sub Meeting Presentation - Sequoyah, Units 1 and 2; Watts Bar, Units 1 and 2 - License Amendment Request to Revise TS 3.5.2 ECCS - Operating ML24184B9162024-07-10010 July 2024 U.S. NRC Meeting Slides for Meeting with Tennessee Valley Authority Regarding NRC Questions Regarding Scope of Nuclear Quality Assurance Program ML24137A2872024-05-16016 May 2024 Pre-Submittal Meetingfor Proposed License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources - Operating to Clarify Requirements for Diesel Generator Testing ML24127A0412024-05-0606 May 2024 May 6, 2024 Meeting Slides ML24067A2832024-03-27027 March 2024 2023 Browns Ferry, Sequoyah and Watts Bar Annual Assessment Public Meeting Presentation Slides ML23291A1562023-10-18018 October 2023 NRC Pre-Submittal Meeting Watts Bar & Sequoyah LAR, TVA Presentation Slides ML23264A0412023-09-27027 September 2023 NRC Pre-Submittal Meeting WBN Rebaseline LAR, TVA Presentation Slides ML23251A1212023-09-12012 September 2023 RHR Flow Rate Reduction During Mode 6 Operation at 23 Ft. Refueling Water Level Technical Specification Change NON-PROPRIETARY Slides ML23251A1252023-09-12012 September 2023 Pre-submittal Meeting for License Amendment Request, Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specification Surveillance Requirement 3.9.5.1 ML23178A0832023-07-10010 July 2023 Pre-submittal Meeting Slides for License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs ML23128A2882023-05-0808 May 2023 TVA Nuclear Plants -2022 EOC Media Slides ML23052A0362023-02-22022 February 2023 February 22, 2023, Pre-Submittal Meeting for the License Amendment Request for Increased Tritium Production at Watts Bar (EPID L-2023-LRM-0010) - Meeting Slides ML23041A3562023-02-15015 February 2023 February 15, 2023 Pre-submittal Meeting for Expedited License Amendment Request Main Control Room (MCR) Chiller Completion Time Extension (EPID L-2022-LRM-0098) (Slides) ML23044A5182023-02-15015 February 2023 Pre-Submittal Meeting Slides for Expedited License Amendment Request Re Main Control Room Chiller Completion Time Extension ML23010A2542023-01-12012 January 2023 Pre-submittal Meeting for Expedited License Amendment Request Main Control Room (MCR) Chiller Completion Time Extension -- Meeting Slides ML22318A1042022-11-14014 November 2022 Pre-submittal Meeting for American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative WBN-2-ISI-01 Slide Presentation ML22157A4132022-06-0606 June 2022 Plants - Pre-Submittal Teleconference for Proposed Amendment Request Regarding the Change for the Sequoyah and Watts Bar Nuclear Plants Technical Specification 3.4.12 Meeting Slides ML22103A0852022-04-14014 April 2022 and Watts Bar Plant Pre-submittal Meeting for Inservice Testing (IST) Program Request for Alternative for the Motor Driven Auxiliary Feedwater Pump Testing Following Maintenance During an Outage Per ISTB-3310 ML22102A3032022-04-12012 April 2022 Pre-submittal Meeting for Request for Exemption from Requirements of 10 CFR 26.205(d)(4) and 10 CFR 26.205(d)(6) Slide Presentation ML22080A1662022-03-21021 March 2022 TVA Nuclear Plants -2021 EOC Media Loop Slides for Automatic Play ML22035A0002022-02-0404 February 2022 February 8, 2022, Pre-Submittal Meeting Slides Regarding Proposed Change to Modify the Allowable Value for Technical Specification Table 3.3.2-1, Function 6.e(1) ML22013A6432022-01-19019 January 2022 TVA Slides - Watts Bar Nuclear Plant (WBN) Schedule for the Development of a License Amendment Request (LAR) for Increased Tritium Production at WBN ML21343A0282021-12-14014 December 2021 TVA Slide Presentation Regarding Pre-Submittal Meeting for Proposed Revision to Capsule Withdrawal Schedule ML21281A2282021-10-13013 October 2021 Tennessee Valley Authority Fleet Pre-Submittal Meeting for License Amendment Request to Change Emergency Action Level Scheme Presentation - October 13, 2021 (EPID L-2021-LRM-0096) (Slides) ML21250A3652021-09-0808 September 2021 Meeting Slides - Watts Bar Nuclear Plant Unit 2, Presubmittal Teleconference for Proposed License Amendment to Revise the Updated Final Safety Analyses Report (UFSAR) to Use a Tube Support Plate Locking/Displacement Analysis ML21229A1992021-08-19019 August 2021 Mid-Cycle SG Outage Strategy (EPID L-2021-LRM-0067) (Slides) ML21217A2872021-08-19019 August 2021 TVA Slides - Pre-Submittal Meeting for Proposed License Amendment Request Re Application to Modify Technical Specification 3.7.8 Essential Raw Cooling Water (ERCW) System, to Support Permanent Shutdown Board ML21231A0972021-08-18018 August 2021 TVA Slides - Pre-Submittal Meeting for Proposed LAR Regarding Application to Modify Watts Bar Units 1 and 2 Technical Specification 3.7.8, Essential Raw Cooling Water (ERCW) System, to Support Permanent Shutdown Board Cleaning ML21096A1312021-04-0707 April 2021 Pre-submittal Meeting for Inservice Testing (IST) Program Request for One-Time Extension of Test Frequency of WBN Unit 1 Group 6 Relief Valves ML21096A1002021-04-0606 April 2021 Annual Assessments ML21041A1552021-02-11011 February 2021 Meeting Slides for February 11, 2021 Meeting with TVA ML21019A5692021-01-19019 January 2021 Pre-Submittal Teleconference for Proposed License Amendment Requests (Lars) for the WBN Unit 2 Replacement Steam Generator (RSG) Project ML20352A0362020-12-17017 December 2020 Pre-Submittal Teleconference for Proposed License Amendment to Revise the Updated Final Safety Analysis Report (UFSAR) to Use an Alternate Probability of Detection (POD) ML20329A3722020-11-24024 November 2020 Pre-Submittal Teleconference for Proposed License Amendment Request Regarding Technical Specification 5.9.9, Steam Generator Tube Inspection Report, to Use Popcd Methodology ML21050A1562020-10-21021 October 2020 Graizer - Presentation - Analysis of Tva'S Watts Bar Nuclear Power Plant Strong-Motion Records of the M 4.4 December 12, 2018 Decatur Tennessee Earthquake ML20239A8672020-08-27027 August 2020 Pre-Submittal Meeting Slides License Amendment Request for Technical Specification 5.7.2.19 ML20220A2022020-08-0707 August 2020 Pre-Submittal Meeting Slides - Proposed License Approach Regarding a Change for Watts Bar Nuclear Plant Units 1 & 2 Technical Specification 3.3.2 Table 1 Function 6.e Auxiliary Feedwater Auto-Start from Loss of Main Feedwater Pumps(Epid L-2 ML20209A0702020-07-27027 July 2020 Pre-submittal Meeting for Inservice Testing (IST) Program Request for Relief from Increased Frequency Testing of Residual Heat Removal (RHR) Pump 1B-B Meeting Slides ML20169A5222020-06-25025 June 2020 Pre-Submittal Meeting for License Amendment Request (LAR) Revised Steam Generator (SG) Inspection Intervals and TSTF-510 ML20175A0552020-06-23023 June 2020 TVA Slides for June 23, 2020, Emergency Plan Change Presubmittal Meeting ML20148M1452020-05-27027 May 2020 (Wbn)Proposed License Approach Regarding a Change for the WBN Units 1& 2 Technical Specification (TS) 3.3.2 Table 1 Function 6.e Auxiliary Feedwater Auto-Start from Loss of Main Feedwater Pumps ML20147A0132020-05-26026 May 2020 NRC Slides Final WBN-1 TS 3.3.3 LAR ML20134J0102020-05-14014 May 2020 Pre-Submittal Meeting for License Amendment Request Technical Specification 5.9.6 Add NRC-approved Neutron Fluence Calculational Methodology ML20125A3242020-05-0505 May 2020 Pre-Submittal Meeting Slides for License Amendment Request - Main Control Room Chiller Completion Time Extension ML20112F5302020-04-21021 April 2020 TVA Nuclear Plants -2019 EOC Media Loop Slides for Automatic Play (Final) ML20049G1822020-02-18018 February 2020 February 20, 2020 - Pre-submittal Meeting Presentation - Transition to Westinghouse Fuel ML20009C3962020-01-0808 January 2020 Pre-Submittal Telecon for Expedited License Amendment Request to Revise Technical Specification 3.3.5, LOP DG Start Instrumentation ML19282A0082019-10-0909 October 2019 TVA Slides for Pre-Submittal Meeting for License Amendment Request to Correct Unbalanced Voltage Relay Instrumentation Values 2024-08-15
[Table view] Category:Meeting Briefing Package/Handouts
MONTHYEARML24284A0042024-10-16016 October 2024 Application to Use Online Monitoring Methodology for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant Session Slides ML24228A2312024-08-15015 August 2024 TVA Meeting Slides for August 19 Public Meeting Re QAPD Supplement ML24225A2542024-08-14014 August 2024 August 14, 2024 - TVA Pre-Sub Meeting Presentation - Sequoyah, Units 1 and 2; Watts Bar, Units 1 and 2 - License Amendment Request to Revise TS 3.5.2 ECCS - Operating ML24137A2872024-05-16016 May 2024 Pre-Submittal Meetingfor Proposed License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources - Operating to Clarify Requirements for Diesel Generator Testing ML24127A0412024-05-0606 May 2024 May 6, 2024 Meeting Slides ML24067A2832024-03-27027 March 2024 2023 Browns Ferry, Sequoyah and Watts Bar Annual Assessment Public Meeting Presentation Slides ML24044A0872024-02-14014 February 2024 TVA Slides - Watts Bar Nuclear Plant Pre-Submittal Meeting for License Amendment Request to Revise TS 3.7.11, Main Control Room Area Chilled Water System ML23291A1562023-10-18018 October 2023 NRC Pre-Submittal Meeting Watts Bar & Sequoyah LAR, TVA Presentation Slides ML23264A0412023-09-27027 September 2023 NRC Pre-Submittal Meeting WBN Rebaseline LAR, TVA Presentation Slides ML23251A1212023-09-12012 September 2023 RHR Flow Rate Reduction During Mode 6 Operation at 23 Ft. Refueling Water Level Technical Specification Change NON-PROPRIETARY Slides ML23251A1252023-09-12012 September 2023 Pre-submittal Meeting for License Amendment Request, Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specification Surveillance Requirement 3.9.5.1 ML23178A0832023-07-10010 July 2023 Pre-submittal Meeting Slides for License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs ML23128A2882023-05-0808 May 2023 TVA Nuclear Plants -2022 EOC Media Slides ML23052A0362023-02-22022 February 2023 February 22, 2023, Pre-Submittal Meeting for the License Amendment Request for Increased Tritium Production at Watts Bar (EPID L-2023-LRM-0010) - Meeting Slides ML23041A3562023-02-15015 February 2023 February 15, 2023 Pre-submittal Meeting for Expedited License Amendment Request Main Control Room (MCR) Chiller Completion Time Extension (EPID L-2022-LRM-0098) (Slides) ML23044A5182023-02-15015 February 2023 Pre-Submittal Meeting Slides for Expedited License Amendment Request Re Main Control Room Chiller Completion Time Extension ML22318A1042022-11-14014 November 2022 Pre-submittal Meeting for American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative WBN-2-ISI-01 Slide Presentation ML22157A4132022-06-0606 June 2022 Plants - Pre-Submittal Teleconference for Proposed Amendment Request Regarding the Change for the Sequoyah and Watts Bar Nuclear Plants Technical Specification 3.4.12 Meeting Slides ML22102A3032022-04-12012 April 2022 Pre-submittal Meeting for Request for Exemption from Requirements of 10 CFR 26.205(d)(4) and 10 CFR 26.205(d)(6) Slide Presentation ML22080A1662022-03-21021 March 2022 TVA Nuclear Plants -2021 EOC Media Loop Slides for Automatic Play ML21343A0282021-12-14014 December 2021 TVA Slide Presentation Regarding Pre-Submittal Meeting for Proposed Revision to Capsule Withdrawal Schedule ML21281A2282021-10-13013 October 2021 Tennessee Valley Authority Fleet Pre-Submittal Meeting for License Amendment Request to Change Emergency Action Level Scheme Presentation - October 13, 2021 (EPID L-2021-LRM-0096) (Slides) ML21250A3652021-09-0808 September 2021 Meeting Slides - Watts Bar Nuclear Plant Unit 2, Presubmittal Teleconference for Proposed License Amendment to Revise the Updated Final Safety Analyses Report (UFSAR) to Use a Tube Support Plate Locking/Displacement Analysis ML21229A1992021-08-19019 August 2021 Mid-Cycle SG Outage Strategy (EPID L-2021-LRM-0067) (Slides) ML21217A2872021-08-19019 August 2021 TVA Slides - Pre-Submittal Meeting for Proposed License Amendment Request Re Application to Modify Technical Specification 3.7.8 Essential Raw Cooling Water (ERCW) System, to Support Permanent Shutdown Board ML21231A0972021-08-18018 August 2021 TVA Slides - Pre-Submittal Meeting for Proposed LAR Regarding Application to Modify Watts Bar Units 1 and 2 Technical Specification 3.7.8, Essential Raw Cooling Water (ERCW) System, to Support Permanent Shutdown Board Cleaning ML21117A0722021-04-27027 April 2021 Meeting Slides for April 28, 2021 Meeting with TVA ML21096A1312021-04-0707 April 2021 Pre-submittal Meeting for Inservice Testing (IST) Program Request for One-Time Extension of Test Frequency of WBN Unit 1 Group 6 Relief Valves ML21041A1552021-02-11011 February 2021 Meeting Slides for February 11, 2021 Meeting with TVA ML20345A0262020-12-10010 December 2020 Replacement Steam Generator Project Planned License Amendment Request (Lars). LAR Descriptions and Submittal Schedule Meeting Slides ML20329A3722020-11-24024 November 2020 Pre-Submittal Teleconference for Proposed License Amendment Request Regarding Technical Specification 5.9.9, Steam Generator Tube Inspection Report, to Use Popcd Methodology ML20302A1232020-10-28028 October 2020 Pre-Submittal Meeting Slides Non-Voluntary Application to Modify WBN Unit 1 and Unit 2 TS Surveillance Requirement 3.6.15.4, Shield Building ML20239A8672020-08-27027 August 2020 Pre-Submittal Meeting Slides License Amendment Request for Technical Specification 5.7.2.19 ML20175A0552020-06-23023 June 2020 TVA Slides for June 23, 2020, Emergency Plan Change Presubmittal Meeting ML20125A3242020-05-0505 May 2020 Pre-Submittal Meeting Slides for License Amendment Request - Main Control Room Chiller Completion Time Extension ML20049G1822020-02-18018 February 2020 February 20, 2020 - Pre-submittal Meeting Presentation - Transition to Westinghouse Fuel ML20009C3962020-01-0808 January 2020 Pre-Submittal Telecon for Expedited License Amendment Request to Revise Technical Specification 3.3.5, LOP DG Start Instrumentation ML19347B0722019-12-12012 December 2019 TVA and Xcel Energy Slides for Joint Presubmittal Meeting to License Amendment Requests to Adopt WCAP-17661, Revision 1 ML19282A0082019-10-0909 October 2019 TVA Slides for Pre-Submittal Meeting for License Amendment Request to Correct Unbalanced Voltage Relay Instrumentation Values ML19255H5522019-09-12012 September 2019 August 27, 2019, Summary of Public Meeting - Tennessee Valley Safety Conscious Work Environment Update at Watts Bar, Docket 50-390 and 50-391 ML19298A0042019-09-12012 September 2019 Presentation Slides for 9/12/19 Public Meeting ML19252A0532019-09-0909 September 2019 TVA Presentation Slides: Watts Bar Nuclear Plant Pre-Submittal Meeting for License Amendment Request Revised Offsite Electrical Power Sources ML19235A2712019-08-23023 August 2019 2019 TVA Watts Bar Nuclear Plant Public Meeting Slides 08-27-2019 (TVA Slides) ML19235A2882019-08-23023 August 2019 2019 WBN SCWE Public Meeting Slides 8-27-2019 (NRC Slides) ML19178A2462019-07-0101 July 2019 Presentation Material for July 1, 2019 Pre-submittal Meeting with TVA on Full Spectrum LOCA Methodology for Watts Bar, Units 1 and 2 ML19161A2412019-06-11011 June 2019 Pre-Application Meeting for Proposed License Amendment Request (LAR) Regarding Change to the WBN Unit 2 Technical Specifications (TS) 3.4.17, Steam Generator Tube Integrity and 5.7.2.12 Steam Generator Program ML19161A2392019-06-10010 June 2019 Plants Pre-Submittal Meeting for Proposed License Amendments Hydrological Analysis Updates June 10, 2019 ML19142A3602019-05-21021 May 2019 May 9, 2019 Summary of Public Meeting; Watts Bar Nuclear Plant ML19018A0072019-01-18018 January 2019 (WBN)Pre-Submittal Meeting for Proposed License Amendment Request Regarding a One-Time Change for the WBN Unit 2 Technical Specification (TS) 3.7.8, Essential Raw Cooling Water (ERCW) System. ML18291A5732018-10-18018 October 2018 Chilled Work Environment 2024-08-15
[Table view] |
Text
Tennessee VaUey Pre-Submittal Watts Bar (WBN) Unit 1 Licensing Basis March 29, 201 ,
M Age nIntroduc t ions/Op-e-ning Statements NRC Des c r i ption of WBN Unit 1 Hydrology License Amendment Request and Schedule TVA Bre ak Ope n Discussion ALL Public Comment Period ALL Adjourn 1V4; WBN Unit 2 sub.mitted FSAR" amendment in January 2010
- WBN Unit 1 License Amendment Request has been prepared based on latest approved calculations and conformance to WBN Unit 2 -Original analysis:
PMF elevation -1998 analysis results: PMF elevation: -2009 analysis results:. P , MFel'evation M Hydrology Liceqse Amendment
- License Amendment Request describes technical changes to WBN Unit 1 UFSAR Sections 2.4, , -" 2.4.1 , 2.4.2, 2.4.3, 2.4.4, 2.4.11 , and '.'2.4.14 -Hydrological , Engineering (UFSAR Section
- Conforming changes based on detailed " Ghang'es to other UFSAR 2.4.x sections -Increased PM F elevation from 734.9' to 738.8' -Updated results for coincident wind wave activity resulting in wind waves of up to 2.2' -Updated wind wave run up values for the Diesel Generator Bu ilat critical wall of the Intake Pumping Structure, and walls of the Auxiliary, Control and Shield Buildings
-Updated estimated probable minimum flow past the site 2,000 cfs to 3,200 cfs
]\14 1 Hydrology License Amendment -Hydrological Description (UFSAR Section
- Updated-the descriptions of the dams and their associated reservoirs, with updated detention areas and capacities
- Updated figures showing the current reservoir seasonal operating guides I W4 1 Hydrology License Amendment Reu lH"J? -Floods (UFSAR: Section
- Updated historical flood information used to calibrate the hydrologic models used for the hydrologic analysis
- Updated discussion of impact of increased
-PMF and co.incident wind wave activity on Design Basi , s Flood (DBF) elevations for the Diesel Generator Building, Intake Pumping Structure, and Auxiliary, Control and Shield Buildings IVA I Hydrology Licen se Ame ndment Re -PMF (UFSAR S'ection 2.4.3)
- U pd ated inputs and models for determining P MF , resulting in increase in PMF from elevation 734.9' to 738.8' -Updated discussion of the inputs for determining Prob able Maximum Preci p itation (PMP) using the more recent Hydrometeor ol ogical I Report No. 56 -Controlling PMP event changed from a postulated 7,980 sq uare-mile storm to a postulated 21 ,400 square-mile storm -Updated antecedent precipitation index (API) from a m ed i a n API, as determined from past records, to an 11-year period of hi storical rainfall records (1997-2007) at the start of the antec e dent storm Updated the runoff and stream course model, w hich is the TVA Simul ated Open Channel Hydraulics (SOCH) mo del for flood r outing cal culat ions for the Tennessee River and sel ecte d tributaries 1\'4 Hydrology License Amendment PMF (UFSAR Section 2:4.-3)
- Updated i.np'uts and models for determining PMF (cont'd) Updated the runoff and stream course model, which is the TVA Simulated Open Channel Hydraulics (SOCH) model for flood routing calculations for the Tennessee River and selected tributaries
>> Updated the Melton Hill routing to adopt unsteady flow for better refinement for dam seismic failure cases >> Updated model for main river reservoirs, Tellico, and Melton Hill using unsteady flow techniques and calibrated using profiles computed from the U.S. Army Corps of Engineers (USACE) River Analysis System (HEC-RAS) software >> Updated Fort Loudoun-Tellico complex unsteady flow model, and updated verification of the model using May 2003 flood data , instead of March 1973 flood data
!YAl Hydrology License Amendment -PMF (UFSAR: S'ection 2.4.3)* (co.nt'd)
- Updated inputs and models for determinin
.g PMF (cont'd) Updated the runoff and stream course model (cont'd) >> Updated the French Broad River and Holston River models, including Douglas Dam and Cherokee Dam, and updated verification at two gauged points each using the March 1973 flood and at one point each using the May 2003 flood. Models are also verified by replicating the FEMA published 1 DO-year and 500-year flood profiles >> Updated the Little Tennessee River model, including Tellico Dam, Tellico Reservoir, and Chilhowee Dam >> Updated the Watts Bar reservoir model, including Clinch River up to Melton Hill Dam >> Added junction ..,. Tennessee River mile 601.1 to Tellico Dam at Little Tennessee River mile 0.3 in the model Hydrology License Amendment PMF (UFSAR 'Section 2.4.3) (c.* Updated inputs and models for determi: niil9 PMF (cont'd) -Updated the runoff and stream course mode l (cont'd) >> Updated the Chickamauga reservoir model, including a junction with the Dallas Bay arm and the Hiwassee River arm, and updated verification using both March 1973 and May 2003 flood data >> Updated the overall model from use of the TVA standard-step backwater program or USACE HEC-2 software for river hydraulics, to the use of steady-state profiles computed using the USACE HEC-RAS software, using March 1973 and May 2003 flood data for verification H ydrology Lice n se Amendmen t -PMF (UF SA R Secti'on 2-.. 4*.3) (con t'd)
- Upd at ed inputs and models for determining P M.F (cont'd) Updated the runoff and stream course model (cont'd) >> Updated the inputs to the overall model to incl ude turbine discharges in the analysis (main river and tributa ri es) until hea d differentials are too small or the respective powe rh ouse is flooded, and to assume that all gates remain ope rab le without failure >> Updated median initial reservoir elevations used a t the start of the storm sequence as inputs to the model to re fle ct changes to the reservoir operating guidelines
>> Updated the inputs to the overall model to in clu de increased hei ght of embank-ments using sand bask ets t o prevent ea rth em ban kment overtopping at Fort Lou dou n, Cherokee, T el and Wa tts Bar Ml Hydrology Amendment Re PMF (UFSAR. *S*ection 2.4.3) (cont'd)
- Updated inputs and models for determining PMF (cont'd) -Updated the controlling PMF discharge of 1 ,288,000 cfs from a 7,980 square-mile storm centered at Bulls Gap to a PMF discharge of 1 ,065,000 cfs from a 21 ,400 square-mile storm in March with a downstream storm pattern -Updated the analysis to assume that the West Saddle Dike at Watts Bar Dam is overtopped and breached with the discharge input at the mouth of Yellow Creek, and to assume that Chickamauga Dam is overtopped but not postulated to fail Updated the concrete section analysis to evaluate all of the upstream dams instead of just those whose headwater/tailwater comparison were greater than 20%
M Hydrology License Amendment PMF (UFSAR Section 2.4.3) (cont'd)
- Updated inputs and models for determining PMF (cont'd) -Updated the discussion of the Watts Bar Dam spillway gates, as already described in the Watts Bar Unit 2 FSAR -Added commitment to update the Watts Bar Unit 2 FSAR to include discussions of the impact of waterborne objects on dams already included in the Watts Bar Unit 1 UFSAR -Added commitment to update the Watts Bar Unit 2 FSAR to include discussions concerning possible failure of the Fort Loudoun, Watts Bar and Chickamauga lock gates already included in the Watts Bar Unit 1 tJFSAR Deleted discussion of the potential for embankment breaching and analysis results since no breach is assumed except for failure of the Watts Bar West Saddle Dike previously described 1
Hvdrology License Amendment
-PMF (UFSAR Seqtion*-2.4.3) (cont'd)
- Updated the results of the PMF eval , uation, describing the increase in PMF from elevation 734.9' to 738.8'
- Updated the wind wave and runup elevations (as well as fetch lengths to determine those levels) for safety-related structures, with wind speed kept the same, but fetch lengths changed due to the updated PMF level which therefore increases the wind wave height and runup level 1\'4 1 H ydrology L ice n se Amendment -Potentia l Dam , Failures (UFSAR.Se c tion 2.4.4)
- U pd ated the analysis of potential se'ismic a lly induced da m fai , lu: res by considering five controlling d am per mutations
-Failure of Norris and Tellico Dams for Load Case OBE + 11 2 PMF -Failure of Fontana and Tellico Dams for Load Case O BE + 1h PMF -Failure of Fontana, Tellico, Hiwassee, Apalachia, and B lue Ridge Dams for Load Case OBE + Y2 PMF -Failure of Cherokee, Douglas, and Tellico Dams for Lo a d Case aBE Y2 PMF Fai lure of Norris, Cherokee, Douglas, and Tellico D a ms for Load Cas e SSE + 25 year flood 1V4' Hydrology License Amendment -Potential Dam* , Failures (UF'SA'RSection 2.4.4) (cont'd) PMF (UFSAR Section 2.4.3) elevations continue to envelope the calculated Potential Dam Failure elevations, the peak water surface elevation at WBN is produced by the controlling combination of failure of Norris, Cherokee, Douglas, and Tellico Dams for Load Case SSE + 25 year flood at elevation 731 .17'
- Updated the analysis to include partial fail-Ure of Fontana Dam postul.ated at a higher elevation dl:J , e 'to modifications of the dam and ad.ditional analysis utilizing finite element analysis
-Hvdrology License Amendmen Potential Dam Failur.e.s (UFSAR Section 2.4 (cont'd)
- Updated the analysis to include failure ot Tellico Dam for seismic events
- Updated the analysis to use outflow from .Norris, Cherokee Douglas, and Fontana Dams based on USACE Hydrologic Modeling System (HEC-, HMS) software model using a revised dam failure rating curve for Fontana Dam for partia failure at a high.er elevation, with results validated by comparing results with TVA's TRB'R'OUTE computer code
- Updated the analysis to**develop the outflow the case of dams which are postulated to fail (Hiwassee, Apalachia and Blue Ridge) using Hl:u...'
Ml Hydrology License Amendment Re -Potential Dam* Fai'lures (UF'SAR Section 2.4.4) (cont'd)
- Analyzed the complete failure of Tellico Dam using the TVA SOCH model
- Updated the analysis to determine failure time and initial reservoir elevations for each dam from a pre-failure TRBROUTE analysis
- Used HEC-HMS to develop the post failure outflow hydrographs based on the previously determined dam failure rating curves I
- Validated the outflow. h.ydrographs by comparing the HEC-HMS results with those generated by simulatio using TRBROUTE lV4 1 Hydrology License Amendment -UFSAR Sections 2.4.5 through 2.4.10, 2.4.12, and 2.4.13
- Included editorial changes only
- Change" d the name of the TVA Water Management Organization to TVA River Operations (RO) to reflect the current organization name
-Hvdrology License Amendment Low Water Considerations (UFSAR 2.4.11)
- Updated the , probable minimum water level at WBN Unit 1 -Water level at the WBN site upon loss of downstream dam from headwaters at elevation 682.5' begins to drop in 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> and reaches elevation 666.0' ft in 27 hours3.125e-4 days <br />0.0075 hours <br />4.464286e-5 weeks <br />1.02735e-5 months <br /> -Updated the routing model cross-sectional data using new and recalibration of the models, resulting in ne results Required minimum elevation of 666.0' is reached at a later time than original analysis (27 hours3.125e-4 days <br />0.0075 hours <br />4.464286e-5 weeks <br />1.02735e-5 months <br /> instead of 22 ho I I 1\14 Hydrology License Amendment ....-Low Water Consid'erations (U FSAR Section 2.4.11) (cont'd)
- Updated: the minimum flow requirement at essential raw cooling water (ERCW) r -Updated flow required to maintain an elevation of 665.9' producing a 5.9 ft depth at the ERCW intake channel from 2,000 cfs to 3,200 cuffs -Updated historical low water records for WBN Unit 1 at the ERCW intake to include analysis of additional years of record -Added estimated low flow for the period (1903 -2010) on the basin above' WBN with the 15 day, " 30 day, 50 day and 100 day sustained row flow as 2,907 cfs, 3,158 cfs, 3,473 cfs" an: 4,012 cfs, respectively 1\14 , Hydrology License Amendment -Flooding Protecti"on RequIrements (UFSAR Section 2.4., 1"4)
- Updated Design Basis Flood (DBF) elev,ations at various , plant locations that would the controlling PMF -PMF (still reservoir) increased from 734.9' to 738.8' -DBF runup on 4:1 sloped surfaces increased from 736.9' to 741.2' -DBF Runup on critical vertical wall of the Intake Pumping Structure increased from 736.9' to 741.0' -DBF surge level within flooded increased from 735.4' to 739.3' .
-drology License Amendmen Flooding ProtectioO c Hequirements (UFSAR Section 2.4.14) (cont'd)
- Updated the flood protection warning plan to revised
-Updated the initial median reservoir levels based on flood operational guides that have been revised, updated dam rating curves at some dams, and updated the SOCH model 0 1 the Tennessee River to meet current quality assurance standards For rainfall floods, forecasted levels for issuing Stage I and Stage II warnings are changed to reflect the updated hydrological basis for the warning plan
!VAl Hydrology License Amendment Re -FI90ding Protection Requirements Section 2.4.14)
- Updated the flood protection warning plan to reflect the revised' analysis (cont'd) -For seismically induced dam failures and coincident storm conditions, three postulated combinations of seismically induced dam failures are considered
-Updates to the TVA flood forecast system are included to reflect current processes, gage network and forecast procedures The forecast procedure is based upon--an analysis of nine of the 17 hypothetical:
-: storms up to PMP magnitude judge
- _!" controlling Hydrology License Amendment -Flooding Prote , ctio" n Requirements (UFSAR Section 2.4. t'4) (cont'd)
- Updated the flood protection warning plan to reflect the revised analysis (cont'd) -27 hours is allowed for preparation of the plant for operation in the flood mode, with an additional 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for communication and forecasting computations to translate rain on the ground to river elevations at the plant -10 hours of Stage I preparation and an additional 17 hours1.967593e-4 days <br />0.00472 hours <br />2.810847e-5 weeks <br />6.4685e-6 months <br /> for Stage n ,i*preparation that is not concurrent with the Stage I activity is required Stage I target river elevations are revised to reflect the revis' hydrologic analysis, and no changes to flood protection preparation timing is required drology License Amendment elusions -The revised DBF elevation at the WBN:' 'Unit 1. site is determined to not impact any safety-related systems, structures, or components required to be avajlable during' a plant flood -No physical change to the systems, structures, or components is necessary to ensure that they remain adequately protected from the effects of external floods -The warning time for WBN shows that there is sufficient time available in both rainfall and seismically induced dam failure floods safe plant shutdown -The updated low water level analysis. demonstrates that there is sufficient flow to support operations of WBN Unit 1 Hydrology License Amendment act on Plant Safety -Flood protection of safety-related systems, structures, or compon during external flooding events is assured; however, options to obta in additional margin between the calculated DBF elevation and the limiting elevations of safety-related systems, structures, or components required during a plant flood are being evaluated
-Most limiting component is Thermal Barrier Booster Pump motors, with procedures in place to provide temporary flood barrier protection during Stage I flood preparations resulting in 1.2' of: margin -The next limiting components are not discussed in License , I Amendment Request, but include the following:
.' Essential Raw Cooling Water Flow Control Valves, with 0.7' margin to valve centerline and additional margin to air operators and electrical components
- Spent Fuel Pool Cooling Pumps with 0.9' of margin
- Intake Pumping Station with 0.5' of margin 1\'A I Hydrology License Amendment Status of License Am.endment R'equest preparations
-Submittal and UFSAR change pages have been prepared and reviewed by licensing and technical subject matter experts within TVA -Plant Operations Review Committee (PORC) and Site Vice-President approvals have been obtained -Nuclear Safety Review Board (NSRB) review is underway, with answers to comments from NSRB members being prepared
- Schedules Submittal of License Amendment Request dependent on NSRB review completion, estimated by April 16, 20,1 2 drology License Amendme Issues Potentially Affecting Review -Potential Watts Bar , Reservoir overflow ateas recently discover l
- Estimated impact on PMF of an additional 0.2'
- TVA Problem Evaluation Report (PER) 499217 tracks resolution of this issue
- TVA will update the License Amendment Request within 30 days of approval of th affected calculations if necessary
-Order EA-12-049 related to Fukushima Oai-ichi nuclear power plant
- Continued operation does not pose an imminent risk to public health and safety
- Final Interim Staff Guidance scheduled to be issued by the NRC by August 201
- Submit overall integrated plan to the Commission by February 28, 2013
- Complete full implementation no later than two (2) refueling cycles after sub m of the overall integrated plan or December 31 , 2016, whichever comes first -Chickamauga Lock Modifications
- Estimated completion beyond 2016