MONTHYEARML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24057A3382024-02-25025 February 2024 EN 56993 - Fairbanks Morse ML24088A1142024-02-25025 February 2024 Fairbanks Morse (Fm) Part 21 Report 23-02 Re Synchro-Start Mini-Gen Signal Generator ML24088A1102024-02-25025 February 2024 Fairbanks Morse (Fm) Part 21 Notification Report Number 23-01 Re Asco Stainless Steel Solenoid Valves ML24057A3372024-02-25025 February 2024 56992-EN 56992 - Fairbanks Morse Defense ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML22307A0602022-11-0303 November 2022 EN 56200 - Fairbanks Morse Re Basic Component Which Fails to Comply or Contains a Defect ML22301A1742022-10-28028 October 2022 Global Nuclear Fuel Americas, LLC (GNF) - Part 21 60-Day Interim Report Notification: GNF3 Raised Water Rod (SC-22-04 Rt) ML21322A0512021-10-27027 October 2021 Paragon Energy Solutions, LLC, P21-09282021, Rev. 0, Final Notification of a Deviation with Inverter Assembly (Model NLI-072034-CSI-K-5-A) ML20049A0752020-02-11011 February 2020 C&D Technologies, Inc. -10 CFR Part 21 Evaluation Regarding Container Failure in KCR-07 Batteries ML19253A0532019-08-29029 August 2019 Azz Nuclear - Report of Potential 1O CFR Part 21, Eaton Size 1 and 2 A200 Series Starters/Contactors ML19120A1062019-04-17017 April 2019 Interim Report of Potential 10 CFR Part 21, Eaton Size 1 and 2 A200 Series Starters/Contactors ML19080A0592019-03-0808 March 2019 Interim Report of Potential 10CFR Part 21, Eaton A200 Series Starters/Contactors ML19053A5002019-02-0101 February 2019 Sor, Inc. Part 21 Notification of Deviation Sor R-Series Housing with Terminal Block ML17194A8252017-07-11011 July 2017 Part 21 Report Re Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge Connections ML17179A3782017-06-0707 June 2017 TE Connectivity - Part 21 Transfer of Information TE-023 ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML17026A4142017-01-20020 January 2017 C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling ML17006A0112016-12-13013 December 2016 Part 21 Notification - Defective Safety-Related Relays Supplied by TE Connectivity ML16313A0622016-10-18018 October 2016 C&D Technologies, Inc. - 10 CFR Part 21 Evaluation Regarding Terminal Welding Failure in 3DCU-9 Batteries ML16209A0502016-07-13013 July 2016 Part 21 - Furmanite Nuclear Grade Leak Seal Material FSC-N-1B ML16188A3742016-06-30030 June 2016 Part 21 - Inadequate Swaging and Adherence of Silicone O-Ring and Silicone PAD Soft Seat Main Disc and Pilot Disc Assemblies ML15288A1992015-10-0909 October 2015 Part 21 Interim Report - Potential Defect on P/N 535-601 Moore Industries Milliamp Modules ML15223B2642015-08-0606 August 2015 Part 21 Report - Notification of Deviation Regarding Hk Circuit Breaker Pivot Pin ML15211A4962015-07-24024 July 2015 Part 21 - Actuator Shaft Did Not Meet Dimensional Requirements ML15103A2442015-04-0606 April 2015 Part 21 Report - Deviation of Hk Circuit Breaker Close Latch Spring ML15022A6502015-01-20020 January 2015 Letter from Steven R. Eisenberg USNRC 10CFR Part 21 Notification ML14259A3892014-09-0808 September 2014 Part 21 - Failure to Meet Specified Irradiation During Testing of Coated Test Panels ML14204A7072014-07-23023 July 2014 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Unseating of Valve Spring on SSPV ML14210A0102014-07-23023 July 2014 Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot Valve ML14204A7082014-07-23023 July 2014 Enclosure 2, Description of Closure Evaluation, Non-Proprietary Information - Class I (Public) ML14134A0792014-05-0808 May 2014 Part 21 - Potential Defect in NUS-710DU Trip Unit to Produce a Valid Trip Output Signal ML14139A2592014-05-0808 May 2014 10 CFR Part 21 Report Notification, NUS710DU Trip Units ML14303A5262014-03-28028 March 2014 Interim Part 21 Report - Misaligned Separators in LCR-25 Standby Batteries ML13340A3822013-12-0505 December 2013 Part 21 Reportable Condition Notification: Failure of Relay Logic Card Modules in 2 Out of 4 Voters ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13127A0122013-05-0303 May 2013 Notification of Potential Interim Part 21 Report of Defect in a Relief Valve Bellows ML13106A0622013-04-15015 April 2013 Part 21 Notification Due to Pump Defect ML13077A3342013-03-15015 March 2013 Part 21 Report - Initial Notification for Flowserve Model 28KXL Pump Impeller Defect ML13064A0122013-02-25025 February 2013 Notification of Potential Part 21 Report Re Wedge Pin Failure of an Anchor/Darling Double-Disc Gate Valve ML13044A0752013-02-0808 February 2013 Part 21 - Completed Evaluation for Potential Error in Main Steam Line High Flow Calculational Methodology ML13042A0962013-02-0808 February 2013 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Error in Main Steam Line High Flow Calculational Methodology ML12348A1362012-12-13013 December 2012 Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers ML12352A1232012-12-13013 December 2012 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12347A3082012-12-12012 December 2012 Part 21 60-Day Interim Report Notification: Error in Main Steam Line High Flow Calculational Methodology ML12283A2462012-09-28028 September 2012 Part 21 - Fairbanks Morse Opposed Piston EDG Oil Pump Leak ML12319A0122012-09-27027 September 2012 Error in Main Steam Line High Flow Calculational Methodology ML12258A3992012-09-10010 September 2012 Potential Part 21 Issue Related to Tyco Timing Relay ML12163A1302012-06-0606 June 2012 Part 21 Report - Failure of CRD Collet Retainer Tube/Outer Tube Weld 2024-09-06
[Table view] Category:Deficiency Correspondence (per 10CFR50.55e and Part 21)
MONTHYEARML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML20049A0752020-02-11011 February 2020 C&D Technologies, Inc. -10 CFR Part 21 Evaluation Regarding Container Failure in KCR-07 Batteries ML19080A0592019-03-0808 March 2019 Interim Report of Potential 10CFR Part 21, Eaton A200 Series Starters/Contactors ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML16313A0622016-10-18018 October 2016 C&D Technologies, Inc. - 10 CFR Part 21 Evaluation Regarding Terminal Welding Failure in 3DCU-9 Batteries ML15243A1742015-08-25025 August 2015 Part 21 Furmanite Nuclear Grade Leak Seal Material FSC-N-1B ML14259A3892014-09-0808 September 2014 Part 21 - Failure to Meet Specified Irradiation During Testing of Coated Test Panels ML14204A7072014-07-23023 July 2014 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Unseating of Valve Spring on SSPV ML14210A0102014-07-23023 July 2014 Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot Valve ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13106A0622013-04-15015 April 2013 Part 21 Notification Due to Pump Defect ML13094A1772013-03-18018 March 2013 Notice to the U.S. Nuclear Regulatory Commission of a Possible Deviation or Defect in Nuclear Qualified High Efficiency Particulate Air Filters Manufactured by Aaf ML13044A0752013-02-0808 February 2013 Part 21 - Completed Evaluation for Potential Error in Main Steam Line High Flow Calculational Methodology ML12347A3082012-12-12012 December 2012 Part 21 60-Day Interim Report Notification: Error in Main Steam Line High Flow Calculational Methodology ML12283A2462012-09-28028 September 2012 Part 21 - Fairbanks Morse Opposed Piston EDG Oil Pump Leak ML12319A0122012-09-27027 September 2012 Error in Main Steam Line High Flow Calculational Methodology ML12258A3992012-09-10010 September 2012 Potential Part 21 Issue Related to Tyco Timing Relay ML12158A4472012-06-0606 June 2012 Part 21 60-Day Interim Report Notification - Closufailure of CRD Collet Retainer Tube/Outer Tube Weld ML12094A3712012-04-0202 April 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML1127000672011-09-26026 September 2011 GE-Hitachi Part 21 Reportable Condition Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance ML1025202192010-09-0303 September 2010 Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer Guidance ML1018907392010-07-0101 July 2010 Part 21 Report Concerning Failure of Turbine Overspeed Reset Control Valve Diaphragm ML0923900432009-08-25025 August 2009 Notification of Potential Part 21 Report Due to Radiation Monitor Defect ML0232901622002-11-18018 November 2002 Final Report, Stability Option III: Possible Successive Confirmation Count Resets - Not Reportable 2024-08-23
[Table view] |
Text
10CFR21.21 April 15, 2013
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk
Washington, DC 20555-0001
Limerick Generating Station, Units 1 and 2 Facility Operating Licens e Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353
Subject:
Part 21 Notification Due To Pump Defect
This 10 CFR Part 21 30-day written report no tification is due to receipt of a pump assembly with incorrectly sized impellers.
The impellers of the replacement pump assembly were not machined to the purchase order specifications.
On Thursday, February 21, 2013, the post maintenance test was performed following replacement of the 0C RHR Service Water pump. Hydraulic performance
of the new pump was approx imately 16% (40 feet) greater than the design specification and resulted in motor current exceeding the motor full load rating by approximately 6.5% at the system design flow rate.
The initial notification to the NRC Operat ions Center (Event Number 48824) was completed on March 15, 2013. This repor t is being submitted pursuant to the requirements of 10CFR21.21(d)(3)(ii).
There are no regulatory commitments contained in this letter.
If you have any questions, please contact Robert B. Dickinson at (610) 718-3400.
Respectfully, Original signed by
Thomas J. Dougherty
Vice President - Lime rick Generating Station Exelon Generation Company, LLC
cc: Administrator Region I, USNRC USNRC Senior Resident Inspector, LGS
- Thirty-Day Part 21 Repor t In Accordance With 10 CFR 21.21(d)(3)(ii)
Thirty-Day Part 21 Report In Accordance Attachment 1 With 10CFR21.21(d)(3)(ii) Page 1 of 3 (i) Name and address of the individual or individuals informing the Commission.
Thomas J. Dougherty Vice President - Lime rick Generating Station 3146 Sanatoga Road Pottstown, PA. 19464
(ii) Identification of the fac ility, the activity, or the bas ic component supplied for such facility or such activity within the United St ates which fails to comply or contains a defect.
Limerick Generating Station, Units 1 and 2 Facility Operating Licens e Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353
Basic component Cont aining Defect:
Flowserve Corporation Pump Model Number 28KXL - 2 STG Replacement RHRSW pump assembly (minus discharge head).
(iii) Identification of the fi rm constructing the facility or supplying the basic component which fails to comply or contains a defect.
Purchase Order Location Flowserve Corporation Pump Parts Regional Services
Scranton, PA
Manufacturing Facility Location
Flowserve Corporation
Vernon, CA
(iv) Nature of the defect or failure to co mply and the safety hazar d which is created or could be created by such defect or failure to comply.
Nature of the defect:
Replacement RHRSW pump assembly was furnished with incorrectly sized
impellers. Following the failed post inst allation test for the replacement pump, the pump manufacturer, Flowserve, c onfirmed that the replacement pump had been furnished with impellers at full diam eter (20-11/16 inches) versus the required trim diameter (19-1/16 inches). This deviation to the RHRSW pump purchase specification is defined as the basic component defect.
Thirty-Day Part 21 Report In Accordance Attachment 1 With 10CFR21.21(d)(3)(ii) Page 2 of 3 Safety Hazard:
Ability of RHRSW loop to mitigate a design basis accident could be compromised by the replacement RHRSW pump, if installed.
(v) The date on which the information of such defect or failure to comply was obtained.
The defective pump assembly was receiv ed from Flowserve in December 2012. The post maintenance test that reveal ed the defect occurred on February 21, 2013.
(vi) In the case of a basic component which contains a defect or fails to comply, the number and location of these components in use at, supplied for, being supplied for, or may be supplied for, manufactured, or being m anufactured for one or more facilities or activities subject to the regulations in this part.
At the time of discovery, in addition to the tested r eplacement pump, there were two additional replacement RHRSW pump assemblies that were confirmed to be defective (incorrect size impellers). One of the additional pumps was removed from storage in a Virginia warehouse, reworked by Flowserve to eliminate the defect and supplied to Limerick on Februar y 28, 2013. The other additional pump had not yet been shipped from Flowse rve's Vernon, CA facility.
(vii) The corrective action which has been, is being, or will be taken; the name of the individual or organization responsible for t he action; and the length of time that has been or will be taken to complete the action.
Following discovery of the defective pump assembly during post maintenance testing on February 21, 2013, the defecti ve pump assembly was removed and returned to the manufacturer. One of the two additional pump assemblies bearing the same defect was reworked by the manufacturer to install correctly sized impellers and was furnished to Limerick to support the site's Technical Specification Limiting Condition for Operation completion ti me. The 0C RHRSW pump was returned to operable status on March 2, 2013.
The supplier entered this event into their internal corrective action system and
determined root causes and resolutions wit h detailed actions that are focused on precluding recurrence of this condition. Additional Quality Control checks will be added by the supplier and additional purchase order technical requirements will be added by Limerick for future pump orders in order to prevent reoccurrence.
Thirty-Day Part 21 Report In Accordance Attachment 1 With 10CFR21.21(d)(3)(ii) Page 3 of 3 (viii) Any advice related to the defect or failure to comply about the facility, activity, or basic component that has been, is being, or will be given to purchasers or licensees.
None (ix) In the case of an early site permit, the entities to whom an early site permit was transferred.
This event does not involve an early site permit.