|
---|
Category:Deficiency Report (per 10CFR50.55e and Part 21)
MONTHYEARML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24057A3382024-02-25025 February 2024 EN 56993 - Fairbanks Morse ML24088A1142024-02-25025 February 2024 Fairbanks Morse (Fm) Part 21 Report 23-02 Re Synchro-Start Mini-Gen Signal Generator ML24088A1102024-02-25025 February 2024 Fairbanks Morse (Fm) Part 21 Notification Report Number 23-01 Re Asco Stainless Steel Solenoid Valves ML24057A3372024-02-25025 February 2024 56992-EN 56992 - Fairbanks Morse Defense ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML22307A0602022-11-0303 November 2022 EN 56200 - Fairbanks Morse Re Basic Component Which Fails to Comply or Contains a Defect ML22301A1742022-10-28028 October 2022 Global Nuclear Fuel Americas, LLC (GNF) - Part 21 60-Day Interim Report Notification: GNF3 Raised Water Rod (SC-22-04 Rt) ML21322A0512021-10-27027 October 2021 Paragon Energy Solutions, LLC, P21-09282021, Rev. 0, Final Notification of a Deviation with Inverter Assembly (Model NLI-072034-CSI-K-5-A) ML20049A0752020-02-11011 February 2020 C&D Technologies, Inc. -10 CFR Part 21 Evaluation Regarding Container Failure in KCR-07 Batteries ML19253A0532019-08-29029 August 2019 Azz Nuclear - Report of Potential 1O CFR Part 21, Eaton Size 1 and 2 A200 Series Starters/Contactors ML19120A1062019-04-17017 April 2019 Interim Report of Potential 10 CFR Part 21, Eaton Size 1 and 2 A200 Series Starters/Contactors ML19080A0592019-03-0808 March 2019 Interim Report of Potential 10CFR Part 21, Eaton A200 Series Starters/Contactors ML19053A5002019-02-0101 February 2019 Sor, Inc. Part 21 Notification of Deviation Sor R-Series Housing with Terminal Block ML17194A8252017-07-11011 July 2017 Part 21 Report Re Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge Connections ML17179A3782017-06-0707 June 2017 TE Connectivity - Part 21 Transfer of Information TE-023 ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML17026A4142017-01-20020 January 2017 C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling ML17006A0112016-12-13013 December 2016 Part 21 Notification - Defective Safety-Related Relays Supplied by TE Connectivity ML16313A0622016-10-18018 October 2016 C&D Technologies, Inc. - 10 CFR Part 21 Evaluation Regarding Terminal Welding Failure in 3DCU-9 Batteries ML16209A0502016-07-13013 July 2016 Part 21 - Furmanite Nuclear Grade Leak Seal Material FSC-N-1B ML16188A3742016-06-30030 June 2016 Part 21 - Inadequate Swaging and Adherence of Silicone O-Ring and Silicone PAD Soft Seat Main Disc and Pilot Disc Assemblies ML15288A1992015-10-0909 October 2015 Part 21 Interim Report - Potential Defect on P/N 535-601 Moore Industries Milliamp Modules ML15223B2642015-08-0606 August 2015 Part 21 Report - Notification of Deviation Regarding Hk Circuit Breaker Pivot Pin ML15211A4962015-07-24024 July 2015 Part 21 - Actuator Shaft Did Not Meet Dimensional Requirements ML15103A2442015-04-0606 April 2015 Part 21 Report - Deviation of Hk Circuit Breaker Close Latch Spring ML15022A6502015-01-20020 January 2015 Letter from Steven R. Eisenberg USNRC 10CFR Part 21 Notification ML14259A3892014-09-0808 September 2014 Part 21 - Failure to Meet Specified Irradiation During Testing of Coated Test Panels ML14204A7072014-07-23023 July 2014 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Unseating of Valve Spring on SSPV ML14210A0102014-07-23023 July 2014 Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot Valve ML14204A7082014-07-23023 July 2014 Enclosure 2, Description of Closure Evaluation, Non-Proprietary Information - Class I (Public) ML14134A0792014-05-0808 May 2014 Part 21 - Potential Defect in NUS-710DU Trip Unit to Produce a Valid Trip Output Signal ML14139A2592014-05-0808 May 2014 10 CFR Part 21 Report Notification, NUS710DU Trip Units ML14303A5262014-03-28028 March 2014 Interim Part 21 Report - Misaligned Separators in LCR-25 Standby Batteries ML13340A3822013-12-0505 December 2013 Part 21 Reportable Condition Notification: Failure of Relay Logic Card Modules in 2 Out of 4 Voters ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13127A0122013-05-0303 May 2013 Notification of Potential Interim Part 21 Report of Defect in a Relief Valve Bellows ML13106A0622013-04-15015 April 2013 Part 21 Notification Due to Pump Defect ML13077A3342013-03-15015 March 2013 Part 21 Report - Initial Notification for Flowserve Model 28KXL Pump Impeller Defect ML13064A0122013-02-25025 February 2013 Notification of Potential Part 21 Report Re Wedge Pin Failure of an Anchor/Darling Double-Disc Gate Valve ML13044A0752013-02-0808 February 2013 Part 21 - Completed Evaluation for Potential Error in Main Steam Line High Flow Calculational Methodology ML13042A0962013-02-0808 February 2013 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Error in Main Steam Line High Flow Calculational Methodology ML12348A1362012-12-13013 December 2012 Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers ML12352A1232012-12-13013 December 2012 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12347A3082012-12-12012 December 2012 Part 21 60-Day Interim Report Notification: Error in Main Steam Line High Flow Calculational Methodology ML12283A2462012-09-28028 September 2012 Part 21 - Fairbanks Morse Opposed Piston EDG Oil Pump Leak ML12319A0122012-09-27027 September 2012 Error in Main Steam Line High Flow Calculational Methodology ML12258A3992012-09-10010 September 2012 Potential Part 21 Issue Related to Tyco Timing Relay ML12163A1302012-06-0606 June 2012 Part 21 Report - Failure of CRD Collet Retainer Tube/Outer Tube Weld 2024-09-06
[Table view] |
Text
03/15/2013 U.S. NuclearRegulatory Commission OperationsCenter Event Report V Page I Power Reactor Event# 48824 Site: LIMERICK Notification Date/ Time: 03/15/2013 17:23 (EDT)
Unit: 1 2 Region: 1 State : PA Event Date I Time: 02/21/2013 10:12 (EDT)
Reactor Type: [1] GE-4,[2] GE-4 Last Modification: 03/15/2013 Containment Type: MARK II MARK II NRC Notified by: MARK ARNOSKY Notifications: GLENN DENTEL R1DO HQ Ops Officer: DONG HWA PARK PART 21 RX GROUP EMAIL Emergency Class: NON EMERGENCY 10 CFR Section:
21.21 (d)(3)(i) DEFECTS AND NONCOMPLIANCE Unit Scram Code RX Crit nit Power Initial RX Mode Curr Power Current RX Mode 1 N Yes 100 Power Operation 1100 Power Operation 2 N Yes 100 Power Operation 100 Power Operation PART 21 REPORT - INITIAL NOTIFICATION FOR FLOWSERVE MODEL 28KXL PUMP IMPELLER DEFECT "This Part 21 initial notification addresses a pump impeller defect that resulted in a post maintenance test (PMT) failure. The OC RHR Service Water Pump was being replaced due to degraded performance which caused an In-Service Test (IST) failure. The replacement pump impeller received from the supplier had not been machined to the purchase order specifications. The IST of the new pump could not be completed since the required test conditions could not be established. The pump was later replaced and the IST was completed successfully. The pump was declared operable on March 2, 2013.
"This Part 21 Initial Notification is being submitted pursuant to the requirements of 10CFR21.21 (d)(3)(i)."
The licensee has notified the NRC Resident Inspector.
I4?Y~
NRC FORM 361 U.S. NUCLEAR REGULATORY COMMISSION OPERATIONS CENTER REACTOR PLANT EVENT NOTIFICATION WORKSHEET EN 48824 NRC OPERATION TELEPHONE NUMBER: PRIMARY - 301-816-5100 or 800-532-3469*. BACKUPS - list) 301-951-0550 or 800-449-3694".
l2nd) 301-415-0550 and 3rd 301-415-0553 *l"oensees who maintain their own ETS are ovided these telephone numbers.
NOTIFICATION TIME FACILITY OR ORGANIZATION UNIT NAME OF CALLER CALL BACK 0 1723 EDT4884 Limerick 1& 2 Mark Amosky (jfO 718-2125 EVENT TIME &ZONE EVENT DATE POWER/MOOE BEFORE POWER/MODE AFTER 1012 02/21/2013 100%/1 100%/i EVENT CLASSIFICATIONS 1-Hr. Non-Emersency 10 CFR 50.72(b I 6] (vXA) Sate S/ Capabdsy AINA A.I,NB O GENERAL EMERGENCY GEN/AAEC 0 TS Deviation ADEV Q~(vXB) RHR Capabiliy D SITE AREA EMERGENCY SIT/AAEC 4-Hr. Non-Emergency 10 CFR 80.72(bX2) 01 (vXC) Con'oI of Red Release AJNC 0i ALERT ALE/AAEC 040() TS Reduied 5/0 ASIIU [DI (vXD) Aacadent Mitigation AINO 0 UNSA EVENT UNU/AAEC [3 (iv)(A) ECCS Disctiwgs to RCS -ACCS C](xii) Offsite Medical AIMED O 50.72 NON-EMERGENCY (see next columns) C] (ovxS) RPS Actustion (scrami)0 (xii) Loss CormhA~smTtVeaJp ACOM
_b PHYSICAL-SECURITY (73.71) 0OO (mx) Oftie Notificatin APRE 0-0ay Optional 10 CFR 50.73(a)(1) o
..MATERIAL'EXPOSURE ..
FITNESS FOR DUTY
'??
HFIT Q 8.-Hr. Non-Emergency 10 CFR S0.72(b(3) O Invalid Specified System Actuatron AINV (6XA) Degrlede Condition ADEG Other Unspecified Requirement (Identify)
OiOTHER UNSPECIFIED REQMT. (see last column) Q (u)XB) Unanalyzed Condition AUNA 10CFR21,21(d)(3)(i) NONR
] INFORMATION ONLY NINF ivA pecifd System Actuatio AESF 1 NONR DESCRIPTION Include, Systems affected, actusbons and 9mir Initiating signals, causes, effect of event on plant, actions taken or planned. etc. (COntnue on bac*)
Part 21 Initial Notification for Flowserve Model 28KXL Pump Impeller Defect This Part 21 initial notification addresses a pump impeller defect that resulted in a post maintenance test (PMT) failure. The OC RHR Service Water Pump was being replaced due to degraded performance which caused an In-Service Test (IST) failure.
The replacement pump impeller received from the supplier had not been machined to the purchase order specifications. The IST of the new pump could not be completed since the required test conditions could not be established. The pump was later replaced and the IST was completed successfully. The pump was declared operable on March 2, 2013.
This Part 21 Initial Notification is being submitted pursuant to the requirements of 10CFR21.21 (d)(3)(i).
NOTIFICATIONS YES NO WILL BE ANYTHING UNUSUAL OR NO NRC RESIDENT_ . NOT UNDERSTOOD?
STATE(s) . .. L] .. DID ALL SYSTEMS 2] YES El NO (Explain above)
LOCAL, - . . . ] FUNCTION AS REQUIRED?
OTHER GOV AGENCIES MEDIAIP'RESS RELEASE 0
... c
. .. . 0.
21 Q
o Q MODE OF
.. .............. OPEWTION 1UNTILCCRRECTED 100%
ESTIMATED RESARDATE (MM0 E 1 T N/A N/AYES ADDITIONAL INFO ON BACK
[~ NO NRC FORM 361 (12,2000)
PAGE 1 OF 2