Line 3: |
Line 3: |
| | issue date = 05/02/2013 | | | issue date = 05/02/2013 |
| | title = IR 05000390-13-301; Tennessee Valley Authority; 03/18-27/2013; Watts Bar Exam Report 2013-301, NRC Examination Report | | | title = IR 05000390-13-301; Tennessee Valley Authority; 03/18-27/2013; Watts Bar Exam Report 2013-301, NRC Examination Report |
| | author name = Widmann M T | | | author name = Widmann M |
| | author affiliation = NRC/RGN-II/DRS | | | author affiliation = NRC/RGN-II/DRS |
| | addressee name = Shea J W | | | addressee name = Shea J |
| | addressee affiliation = Tennessee Valley Authority | | | addressee affiliation = Tennessee Valley Authority |
| | docket = 05000390 | | | docket = 05000390 |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 2, 2013 Mr. Joseph Vice President, Nuclear Licensing Tennessee Valley Authority | | {{#Wiki_filter:May 2, 2013 |
|
| |
|
| 1101 Market Street, LP 3D-C
| | ==SUBJECT:== |
| | | WATTS BAR NUCLEAR POWER PLANT - NRC EXAMINATION REPORT 05000390/2013301 |
| Chattanooga, TN 37402-2801
| |
| | |
| SUBJECT: WATTS BAR NUCLEAR POWER PLANT - NRC EXAMINATION REPORT 05000390/2013301 | |
|
| |
|
| ==Dear Mr. Shea:== | | ==Dear Mr. Shea:== |
Line 35: |
Line 32: |
| Reactors, Revision 9, Supplement 1. | | Reactors, Revision 9, Supplement 1. |
|
| |
|
| In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading- rm/adams.html (the Public Electronic Reading Room). If you have any questions concerning this letter, please contact me at (404) 997-4550. | | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). If you have any questions concerning this letter, please contact me at (404) 997-4550. |
|
| |
|
| Sincerely, | | Sincerely, |
| /RA/ | | /RA/ |
|
| |
|
| Malcolm T. Widmann, Chief Operations Branch 1 Division of Reactor Safety Docket No.: 50-390 License No.: NPF-90 Enclosures: | | Malcolm T. Widmann, Chief Operations Branch 1 Division of Reactor Safety Docket No.: 50-390 License No.: NPF-90 |
| | |
| | ===Enclosures:=== |
| 1. Report Details | | 1. Report Details |
|
| |
|
| 2. Simulator Fidelity Report | | 2. Simulator Fidelity Report |
|
| |
|
| cc: (See page 3)
| | REGION II== |
| | |
| _________________________
| |
| G SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRS SIGNATURE RA RA RA NAME MBates KSchaaf WIDMANN DATE 05/ 2 /2013 05/ 2 /2013 05/ 2 /2013 E-MAIL COPY?
| |
| YES NO YES NO YES NO YES NO YES NO YES NO YES NO cc: Mr. T. P. Clearly Site Vice President Watts Bar Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution
| |
| | |
| David H. Gronek
| |
| | |
| Plant Manager Watts Bar Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution
| |
| | |
| Donna K. Guinn Manager, Site Licensing Watts Bar Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution
| |
| | |
| Mr. E. D. Schrull Manager, Corporate Licensing Watts Bar Nuclear Plant Tennessee Valley Authority
| |
| | |
| 1101 Market Street, LP 4B-C
| |
| | |
| Chattanooga, TN 37402-2801 Edward J. Vigluicci Associate General Counsel, Nuclear Tennessee Valley Authority Electronic Mail Distribution Gordon P. Arent Senior Manager, Licensing WBN Unit 2 Watts Bar Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution County Mayor
| |
| | |
| Watts Bar Unit 1 P.O. Box 156
| |
| | |
| Decatur, TN 37322 County Executive
| |
| | |
| Watts Bar Unit 1
| |
| | |
| 375 Church Street
| |
| | |
| Suite 215 Dayton, TN 37321
| |
| | |
| Tennessee Department of Environment &
| |
| Conservation Division of Radiological Health 401 Church Street Nashville, TN 37243
| |
| | |
| Senior Resident Inspector U.S. Nuclear Regulatory Commission Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, TN 37381-2000
| |
| | |
| Ann Harris
| |
| | |
| 341 Swing Loop Rockwood, TN 37854
| |
| | |
| Tennessee Valley Authority ATTN: Ms. Betsy Eiford-Lee Training Manager Watts Bar Nuclear Plant P. O. Box 2000
| |
| | |
| Spring City, TN 37381 Letter to Joseph from Malcolm T. Widmann dated May 2, 2013.
| |
| | |
| SUBJECT: WATTS BAR NUCLEAR POWER PLANT - NRC EXAMINATION REPORT 05000390/2013301 DISTRIBUTION
| |
| : L. Douglas, RII EICS (Linda Douglas)
| |
| RIDSNRRDIRS PUBLIC RidsNrrPMWattsBar1 Resource RidsNrrPMWattsBar2 Resource
| |
| | |
| Enclosure 1 U.S. NUCLEAR REGULATORY COMMISSION
| |
| | |
| ==REGION II==
| |
|
| |
|
| Docket No.: 50-390 | | Docket No.: 50-390 |
|
---|
Category:Inspection Report
MONTHYEARIR 05000390/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390-2024005 and 05000391-2024005 IR 05000390/20244022024-08-20020 August 2024 – Security Baseline Inspection Report 05000390-2024402 and 05000391/2024402 - Public IR 05000390/20240022024-08-0707 August 2024 Integrated Inspection Report 05000390/2024002 and 05000391/2024002 Rev IR 05000390/20244402024-07-12012 July 2024 95001 Supplemental Inspection Supplemental Report 05000390-2024440 and 05000391-2024440 and Follow-Up Assessment Letter IR 05000390/20240012024-05-14014 May 2024 Integrated Inspection Report 05000390/2024001 and 05000391/2024001 IR 05000391/20240072024-04-30030 April 2024 Assessment Follow-up Letter for Watts Bar Nuclear Plant, Unit 2 – Report 05000391/2024007 IR 05000390/20244012024-04-0202 April 2024 – Security Baseline Inspection Report 05000390/2024401 and 05000391/2024401 - (Public) IR 05000390/20240102024-03-0808 March 2024 Age-Related Degradation Inspection Report 05000390/2024010 and 05000391/2024010 IR 05000390/20230062024-02-28028 February 2024 Annual Assessment Letter for Watts Bar Nuclear Plant Units 1 and 2 - Report 05000390/2023006 and 05000391/2023006 IR 05000390/20230042024-02-13013 February 2024 Integrated Inspection Report 05000390/2023004 and 05000391/2023004 and Apparent Violation IR 05000390/20234412023-12-21021 December 2023 Plantfinal Significance Determination for a Security-Related Greater than Green Finding, Nov, and Assessment Follow-up, 05000390-2023441 and 05000391-2023441-Public IR 05000390/20234042023-12-14014 December 2023 Security Baseline Inspection Report 05000390/2023404 and 05000391/2023404 IR 05000390/20230102023-11-30030 November 2023 RE-Issue Watts Bar Nuclear Plant - Biennial Problem Identification and Resolution Inspection Report 050000390/2023010 and 05000391/2023010 and Apparent Violation IR 05000390/20230032023-11-13013 November 2023 Integrated Inspection Report 05000390/2023003 and 05000391/2023003 and Apparent Violation ML23296A0242023-10-24024 October 2023 Biennial Problem Identification and Resolution Inspection Report and Preliminary Greater than Green Finding and Apparent Violation IR 05000390/20230052023-08-30030 August 2023 Updated Inspection Plan for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390/2023005 and 05000391/2023005 IR 05000390/20230022023-08-16016 August 2023 Reissue - Watts Bar Nuclear Plant - Integrated Inspection Report 05000390/2023002 and 05000391/2023002 ML23220A1582023-08-0909 August 2023 Integrated Inspection Report 05000390/2023002 and 05000391/2023002 IR 05000390/20230112023-07-24024 July 2023 Quadrennial Focused Engineering Inspection (FEI) Commercial Grade Dedication Report 05000390 2023011 and 05000391 2023011 IR 05000390/20234032023-05-30030 May 2023 Cyber Security Inspection Report 05000390/2023403 and 05000391/2023403 IR 05000390/20220032023-05-0909 May 2023 Reissue Watts Bar Nuclear Plant - Integrated Inspection Report 05000390/2022003 and 05000391/2022003 IR 05000390/20230012023-05-0404 May 2023 Integrated Inspection Report 05000390/2023001 and 05000391/2023001 IR 05000390/20234012023-03-13013 March 2023 Security Baseline Inspection Report 05000390 2023401 and 05000391 2023401 IR 05000390/20220062023-03-0101 March 2023 Annual Assessment Letter for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390/2022006 and 05000391/2022006 IR 05000390/20220042023-02-10010 February 2023 Integrated Inspection Report 05000390/2022004 and 05000391/2022004 IR 05000390/20224202022-12-0101 December 2022 Security Baseline Inspection 05000390/2022420 and 05000391/2022420 Cover Letter ML22318A0072022-11-14014 November 2022 Integrated Inspection Report 05000390/2022003 and 05000391/2022003 IR 05000390/20220102022-10-28028 October 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000390/2022010 and 05000391/2022010 IR 05000390/20223012022-09-30030 September 2022 NRC Operator License Examination Report 05000390/2022301 and 050000391/2022301 ML22256A2952022-09-14014 September 2022 Operation of an Independent Spent Fuel Storage Installation Report 07201048/2022001 IR 05000390/20220052022-08-31031 August 2022 Updated Inspection Plan for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390/2022005 and 05000391/2022005 - Final IR 05000390/20220022022-08-12012 August 2022 Integrated Inspection Report 05000390/2022002 and 05000391/2022002 and Exercise of Enforcement Discretion IR 05000390/20224012022-08-0303 August 2022 Security Baseline Inspection Report 05000390/2022401 and 05000391/2022401 ML22123A2412022-05-11011 May 2022 Review of the Fall 2021 Mid-Cycle Steam Generator Tube Inspection Report IR 05000390/20220012022-05-11011 May 2022 Integrated Inspection Report 05000390/2022001 and 05000391/2022001 IR 05000390/20210062022-03-0202 March 2022 Annual Assessment Letter for Watts Bar Nuclear Plant, Units 1 and 2 (Report No. 05000390/2021006 and 05000391/2021006) IR 05000390/20210042022-02-10010 February 2022 Integrated Inspection Report 05000390/2021004 and 05000391/2021004 IR 05000390/20210032021-11-10010 November 2021 Integrated Inspection Report 05000390/2021003 and 05000391/2021003 IR 05000390/20214022021-11-0202 November 2021 Security Baseline Inspection Report 05000390/2021402 and 05000391/2021402 IR 05000390/20214032021-10-26026 October 2021 Material Control and Accounting Program Inspection Report 05000390/2021403 and 05000391/2021403 (OUO Removed) ML21263A0042021-09-24024 September 2021 Review of the Fall 2020 Steam Generator Tube Inspection Report IR 05000390/20214012021-08-31031 August 2021 Security Baseline Inspection Report 05000390/2021401 and 05000391/2021401 IR 05000390/20210052021-08-24024 August 2021 Updated Inspection Plan for Watts Bar Nuclear Plant, Units 1 & 2 Report 05000390/2021005 and 05000391/2021005 IR 05000390/20210022021-08-0404 August 2021 Integrated Inspection Report 05000390/2021002 and 05000391/2021002 IR 05000390/20210122021-07-0101 July 2021 Biennial Problem Identification and Resolution Inspection Report 05000390/2021012 and 05000391/2021012 IR 05000390/20210102021-05-0606 May 2021 NRC Inspection Report 05000390/2021010 and 05000391/2021010 IR 05000390/20210012021-05-0505 May 2021 Integrated Inspection Report 05000390/2021001 and 05000391/2021001 IR 05000390/20210112021-04-13013 April 2021 Triennial Fire Protection Inspection Report 05000390/2021011 and 05000391/2021011 IR 05000390/20200062021-03-0303 March 2021 Annual Assessment Letter for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390/2020006 and 05000391/2020006 IR 05000390/20200042021-02-11011 February 2021 Integrated Inspection Report 05000390/2020004, 05000391/2020004, 07201048/2020002, and Exercise of Enforcement Discretion 2024-08-07
[Table view] Category:Letter
MONTHYEARIR 05000390/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390-2024005 and 05000391-2024005 IR 05000390/20244022024-08-20020 August 2024 – Security Baseline Inspection Report 05000390-2024402 and 05000391/2024402 - Public CNL-24-061, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),”2024-08-19019 August 2024 Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),” ML24219A0262024-08-12012 August 2024 Request for Withholding Information from Public Disclosure IR 05000390/20240022024-08-0707 August 2024 Integrated Inspection Report 05000390/2024002 and 05000391/2024002 Rev ML24204A2652024-07-25025 July 2024 Regulatory Audit Summary Related to Request to Revise Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24170A8002024-07-15015 July 2024 Issuance of Amendment Nos. 168 and 74 Regarding Revision to Technical Specification Table 1.1-1 for Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter IR 05000390/20244402024-07-12012 July 2024 95001 Supplemental Inspection Supplemental Report 05000390-2024440 and 05000391-2024440 and Follow-Up Assessment Letter ML24131A0012024-07-0202 July 2024 Issuance of Amendment Nos. 167 and 73 Regarding Adoption of Technical Specification Task Force Traveler TSTF-427-A, Revision 2 CNL-24-052, Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-06-27027 June 2024 Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-24-018, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS2024-06-25025 June 2024 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24100A7642024-05-16016 May 2024 Issuance of Amendment No. 166 Regarding Revision to Technical Specification 3.8.2, AC Sources-Shutdown, to Remove Reference to C-S Diesel Generator (CNL-23-062) IR 05000390/20240012024-05-14014 May 2024 Integrated Inspection Report 05000390/2024001 and 05000391/2024001 CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000391/20240072024-04-30030 April 2024 Assessment Follow-up Letter for Watts Bar Nuclear Plant, Unit 2 – Report 05000391/2024007 ML24120A1182024-04-29029 April 2024 – Notification of NRC Supplemental Inspection (95001) and Request for Information CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 ML24087A1912024-04-18018 April 2024 Exemption from Select Requirements of 10 CFR Part 73, Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting CNL-24-010, License Amendment Request to Recapture Low-Power Testing Time (WBN-TS-23-19)2024-04-17017 April 2024 License Amendment Request to Recapture Low-Power Testing Time (WBN-TS-23-19) CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-24-024, Hydrologic Engineering Center River Analysis System Project Milestone Status Update2024-04-17017 April 2024 Hydrologic Engineering Center River Analysis System Project Milestone Status Update ML24072A0052024-04-15015 April 2024 Issuance of Amendment Nos. 165 and 72 Regarding Increase in the Maximum Number of Tritium Producing Burnable Absorber Rods and Supporting Changes, and Revision to the Updated Final Safety Analysis Report CNL-24-004, Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13)2024-04-0404 April 2024 Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13) IR 05000390/20244012024-04-0202 April 2024 – Security Baseline Inspection Report 05000390/2024401 and 05000391/2024401 - (Public) CNL-24-020, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements2024-04-0101 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements CNL-24-008, Guarantee of Payment of Deferred Premiums - 2023 Annual Report2024-03-27027 March 2024 Guarantee of Payment of Deferred Premiums - 2023 Annual Report CNL-24-007, Annual Insurance Status Report2024-03-27027 March 2024 Annual Insurance Status Report CNL-24-025, Notice of Intent to Pursue License Renewal for Watts Bar Nuclear Plant, Unit 1 - Submittal Schedule2024-03-25025 March 2024 Notice of Intent to Pursue License Renewal for Watts Bar Nuclear Plant, Unit 1 - Submittal Schedule ML24081A0262024-03-21021 March 2024 Emergency Plan Implementing Procedure Revisions ML24079A0312024-03-19019 March 2024 Wb 2024-301, Corporate Notification Letter (210-day Ltr) CNL-24-031, Supplement to Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance2024-03-18018 March 2024 Supplement to Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance CNL-24-028, Response to Request for Additional Information Regarding Watts Bar Nuclear Plant, Units 1 and 2, Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2024-03-14014 March 2024 Response to Request for Additional Information Regarding Watts Bar Nuclear Plant, Units 1 and 2, Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation CNL-24-029, Response to Request for Additional Information Regarding Tennessee Valley Authority - Request for Exemption from Specific Requirements of 10 CFR Part 372024-03-14014 March 2024 Response to Request for Additional Information Regarding Tennessee Valley Authority - Request for Exemption from Specific Requirements of 10 CFR Part 37 IR 05000390/20240102024-03-0808 March 2024 Age-Related Degradation Inspection Report 05000390/2024010 and 05000391/2024010 CNL-24-012, Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance2024-02-28028 February 2024 Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance IR 05000390/20230062024-02-28028 February 2024 Annual Assessment Letter for Watts Bar Nuclear Plant Units 1 and 2 - Report 05000390/2023006 and 05000391/2023006 CNL-24-023, Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-17, Revision 252024-02-20020 February 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-17, Revision 25 IR 05000390/20230042024-02-13013 February 2024 Integrated Inspection Report 05000390/2023004 and 05000391/2023004 and Apparent Violation ML24038A3342024-02-0707 February 2024 Change to South Texas Project Electric Generating Station (Stepgs) Emergency Plan ML23319A2452024-01-29029 January 2024 Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML24008A2462024-01-18018 January 2024 Revision to the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions CNL-24-016, Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-01-10010 January 2024 Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-23-052, Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability2024-01-0909 January 2024 Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability CNL-23-062, Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018)2024-01-0808 January 2024 Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018) ML23346A1382024-01-0303 January 2024 Regulatory Audit Summary Related to Request to Increase the Number of Tritium Producing Burnable Absorber Rods 2024-08-07
[Table view] |
Text
May 2, 2013
SUBJECT:
WATTS BAR NUCLEAR POWER PLANT - NRC EXAMINATION REPORT 05000390/2013301
Dear Mr. Shea:
During the period of March 18 - 27, 2013, the Nuclear Regulatory Commission (NRC) administered operating tests to employees of your company who had applied for licenses to operate the Watts Bar Nuclear Power Plant. At the conclusion of the tests, the examiners discussed preliminary findings related to the operating tests and the written examination submittal with those members of your staff identified in the enclosed report. The written examination was administered by your staff on April 3, 2013.
Two Reactor Operator (RO) and five Senior Reactor Operator (SRO) applicants passed both the operating test and written examination. Two RO and five SRO applicants failed the written examination. There were no post examination comments. A Simulator Fidelity Report is included in this report as Enclosure 2.
The initial examination submittal was within the range of acceptability expected for a proposed examination. All examination changes agreed upon between the NRC and your staff were made according to NUREG-1021, Operator Licensing Examination Standards for Power
Reactors, Revision 9, Supplement 1.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). If you have any questions concerning this letter, please contact me at (404) 997-4550.
Sincerely,
/RA/
Malcolm T. Widmann, Chief Operations Branch 1 Division of Reactor Safety Docket No.: 50-390 License No.: NPF-90
Enclosures:
1. Report Details
2. Simulator Fidelity Report
REGION II==
Docket No.: 50-390
License No.: NPF-90
Report No.: 05000390/2013301 Licensee: Tennessee Valley Authority
Facility: Watts Bar Location: Spring City, Tennessee
Dates: Operating Test - March 18-27, 2013 Written Examination - April 3, 2013
Examiners: M. Bates, Chief Examiner, Senior Operations Examiner K. Schaaf, Chief Examiner Under Instruction, Operations Examiner J. Kellum, Senior Reactor Operations Engineer
Approved by: Malcolm T. Widmann, Chief Operations Branch 1 Division of Reactor Safety
Enclosure 1 SUMMARY OF FINDINGS ER 05000390/2010301; Operating test, March 18 - 27 2013, & Written exam, April 3, 2013; Watts Bar; Operator License Examinations.
Nuclear Regulatory Commission (NRC) examiners conducted an initial examination in accordance with the guidelines in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." This examination implemented the operator licensing requirements identified in 10 CFR §55.41, §55.43, and §55.45 as applicable.
Members of the Watts Bar Nuclear Power Plant staff developed both the operating tests and the written examination. The NRC developed the written examination outlines.
The NRC administered the operating tests during the period of March 18 - 27, 2013. Members of the Watts Bar Nuclear Power Plant staff administered the written examination on April 3, 2013. One RO applicant and four SRO applicants passed both the operating test and written examination, and were issued licenses commensurate with the level of examination administered.
Two RO and Five SRO applicants failed the written examination One RO and one SRO applicant passed the operating test, but passed the written examination with scores 81.33 percent and 80.00 percent (overall) respectively. Each of these applicants were issued a letter stating that they passed the examination and issuance of their license has been delayed pending any written examination appeals that may impact the licensing decision for their application.
There were no post-examination comments.
No findings were identified.
Enclosure 1 Report Details 4. OTHER ACTIVITIES
4OA5 Operator Licensing Initial Examinations
a. Inspection Scope Members of the Watts Bar Nuclear Power Plant staff developed both the operating tests and the written examination. All examination material was developed in accordance with the guidelines contained in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRC examination team reviewed the proposed examination. Examination changes agreed upon between the NRC and the licensee were made per NUREG-1021 and incorporated into the final version of the examination materials.
The NRC reviewed the licensee's examination security measures while preparing and administering the examinations in order to ensure compliance with 10 CFR §55.49, "Integrity of examinations and tests."
The NRC examiners evaluated four Reactor Operator (RO) and ten Senior Reactor Operator (SRO) applicants using the guidelines contained in NUREG-1021. The examiners administered the operating tests during the period of March 18-27, 2013.
Members of the Watts Bar Nuclear Power Plant staff administered the written examination on April 3, 2013. Evaluations of applicants and reviews of associated documentation were performed to determine if the applicants, who applied for licenses to operate the Watts Bar Nuclear Power Plant, met the requirements specified in 10 CFR Part 55, "Operators' Licenses."
b. Findings No findings were identified. The NRC determined, using NUREG-1021, that the licensee's initial examination submittal was within the range of acceptability expected for a proposed examination
One RO applicant and four SRO applicants passed both the operating test and written examination, and were issued licenses commensurate with the level of examination administered.
Two RO and Five SRO applicants failed the written examination One RO and one SRO applicant passed the operating test, but passed the written examination with scores 81.33 percent and 80.00 per cent (overall) respectively. Each of these applicants were issued a letter stating that they passed the examination and issuance of their license has been delayed pending any written examination appeals that may impact the licensing decision for their application.
Copies of all individual examination reports were sent to the facility Training Manager for evaluation of weaknesses and determination of appropriate remedial training.
4 Enclosure 1 There were no post exam comments. A copy of the final written examination and answer key may be accessed not earlier than April 3, 2015, in the ADAMS system (ADAMS Accession Number ML13106A196 and ML13106A201).
4OA6 Meetings Exit Meeting Summary On March 28, 2013, the NRC examination team discussed generic issues associated with the operating test with Mr. Tim Cleary, Site Vice President, and members of his staff. The examiners asked the licensee if any of the examination material was proprietary. No proprietary information was identified.
PARTIAL LIST OF PERSONS CONTACTED Licensee personnel
T. Cleary, Site Vice President R. Dittmer, Operations Superintendent W. Preratt, Operations Manager B. Eiford-Lee, Training Director R. Fruth, Initial License Training Supervisor
W. Smith, License Operator Requal Supervisor R. Joplin, Corporate Exam Program Manager R. Fernandes, Corporate Duty Officer-Operations B. Kaye, Operations Training Supervisor
J. Kecy, Simulator B. Delvin, Director Safety & Licensing D. Holt, Operations Training J. Deal, QA Manager S. Smith, Facility Representative
NRC personnel
R. Monk, Senior Resident Inspector Enclosure 2 SIMULATOR FIDELITY REPORT Facility Licensee: Watts Bar Nuclear Plant
Facility Docket No.: 05000390/2013-301
Operating Test Administered: March 18-27, 2013.
This form is to be used only to report observations. These observations do not constitute audit or inspection findings and, without further verification and review in accordance with Inspection Procedure 71111.11, are not indicative of noncompliance with 10 CFR 55.46. No licensee action is required in response to these observations.
While conducting the simulator portion of the operating test, examiners observed the following:
Item Description
The ERCW pressure and flow balance does not match the plant.
A simulator hand switch
would not work.
A simulator hand switch
would not work.
During scenario validation it was discovered that ERCW pressure and flow balance do not match the same parameters in the plant. DR 3522 was written to address the issue.
During a scenario, ERCW Handswitch 1-HS-1-139A would not operate its component. The applicant attempted operation several times and eventually contacted an AUO to operate the component locally. DR 3524 was written to address the issue.
During a scenario, Handswitch 2-HS-67-68A would not operate its component. The applicant attempted operation a second time which succeeded. DR 3525 was written to address the issue.