|
|
Line 3: |
Line 3: |
| | issue date = 06/26/2013 | | | issue date = 06/26/2013 |
| | title = Units I and 2, McGuire, Unit 1 and 2, Oconee, Unit 1, 2 and 3, Independent Spent Fuel Storage Installation (Isfsi), Physical Security Plan, Revision 20 | | | title = Units I and 2, McGuire, Unit 1 and 2, Oconee, Unit 1, 2 and 3, Independent Spent Fuel Storage Installation (Isfsi), Physical Security Plan, Revision 20 |
| | author name = Annacone M J | | | author name = Annacone M |
| | author affiliation = Duke Energy Carolinas, LLC | | | author affiliation = Duke Energy Carolinas, LLC |
| | addressee name = | | | addressee name = |
Line 32: |
Line 32: |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
| ML12293A 182)(3) NRC letter to Duke Energy Carolinas, LLC dated January 16, 2013, Catawba Nuclear Station Units 1 and 2 Request for Additional Information Regarding Revision 18 to Physical Security Plan, (Accession Nos.: Letter: ML13010A551
| | ML12293A182)(3) NRC letter to Duke Energy Carolinas, LLC dated January 16, 2013, Catawba Nuclear Station Units 1 and 2 Request for Additional Information Regarding Revision 18 to Physical Security Plan, (Accession Nos.: Letter: ML13010A551 |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
|
| |
|
| ML 1 2293A063)(4) Duke Energy Carolinas, LLC letter to NRC dated April 10, 2013, Response to Request for Additional Information for Duke Energy-Catawba, McGuire and Oconee Site Physical Security Plan SAFEGUARDS INFORMATION When separated, this page is decontrolled.
| | ML12293A063)(4) Duke Energy Carolinas, LLC letter to NRC dated April 10, 2013, Response to Request for Additional Information for Duke Energy-Catawba, McGuire and Oconee Site Physical Security Plan SAFEGUARDS INFORMATION When separated, this page is decontrolled. |
| !ýc0( | | !ýc0( |
| SAFEGUARDS INFORMATION When separated, this page is decontrolled. | | SAFEGUARDS INFORMATION When separated, this page is decontrolled. |
Units I and 2, McGuire, Unit 1 and 2, Oconee, Unit 1, 2 and 3, Independent Spent Fuel Storage Installation (Isfsi), Physical Security Plan, Revision 20ML13183A069 |
Person / Time |
---|
Site: |
Oconee, Mcguire, Catawba, McGuire ![Duke Energy icon.png](/w/images/7/75/Duke_Energy_icon.png) |
---|
Issue date: |
06/26/2013 |
---|
From: |
Annacone M Duke Energy Carolinas |
---|
To: |
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation |
---|
References |
---|
Download: ML13183A069 (3) |
|
|
---|
Category:Letter
MONTHYEARIR 05000413/20230042024-02-0202 February 2024 Integrated Inspection Report 05000413-2023004 and 05000414-2023004 ML23304A1422024-02-0101 February 2024 Issuance of Environmental Scoping Summary Report Associated with the U.S. Nuclear Regulatory Commission Staffs Review of the Oconee Nuclear Station, Units 1, 2, & 3, Subsequent License Renewal Application IR 05000369/20230042024-01-31031 January 2024 Integrated Inspection Report 05000369/2023004 and 05000370/2023004 ML24005A2512024-01-26026 January 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24019A1392024-01-25025 January 2024 TSTF 505 and 50.69 Audit Summary ML24019A2002024-01-24024 January 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24005A2492024-01-24024 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) IR 05000269/20243012024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000269/2024301, 05000270/2024301, and 05000287/2024301 ML23331A7982023-12-14014 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report (01R32) IR 05000369/20234022023-12-14014 December 2023 Material Control and Accounting Program Inspection Report 05000369/2023402 and 05000370/2023402 ML23262A9672023-12-13013 December 2023 Alternative to Use RR-22-0174, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section XI, Division 1 ML23317A2272023-11-17017 November 2023 William B. McGuire Nuclear Station, Units 1 and 2 - Transmittal of Dam Inspection Report - Non-Proprietary ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000269/20230032023-11-14014 November 2023 Integrated Inspection Report 05000269/2023003, 05000270/2023003, and 05000287/2023003; and IR 07200040/2023001; and Exercise of Enforcement Discretion IR 05000369/20230032023-10-24024 October 2023 Integrated Inspection Report 05000369/2023003 and 05000370/2023003; and Inspection Report 07200038/2023001 IR 05000369/20240102023-10-13013 October 2023 Notification of McGuire Nuclear Station Comprehensive Engineering Team Inspection U.S. Nuclear Regulatory Commission Inspection Report 05000369, 370/2024010 IR 05000369/20230102023-10-13013 October 2023 Age Related Degradation Inspection Report 05000369/2023010 and 05000370/2023010 IR 05000413/20230102023-10-11011 October 2023 NRC Inspection Report 05000413/2023010 and 05000414/2023010 ML23219A1402023-10-10010 October 2023 Audit Report Proposed Alternative to Use ASME Code Case N-752, Risk Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems XI, Division 1 ML23269A1102023-10-0606 October 2023 Letter to Steven Snider-Revised Schedule for the Environmental Review of the Oconee Nuclear Station, Unit 1, 2, and 3, Subsequent License Renewal Application ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds IR 05000369/20233012023-09-20020 September 2023 William B. McGuire Nuclear Station - NRC Examination Report 05000369/2023301 and 05000370/2023301 ML23230A0652023-08-31031 August 2023 William B. McGuire Nuclear Station, Units 1 and 2 - Relief Request Use of Later Edition of ASME Code ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000269/20230052023-08-25025 August 2023 Updated Inspection Plan for Oconee Nuclear Station Units 1, 2 and 3 (Report 05000269/2023005, 05000270/2023005, and 05000287/2023005) IR 05000269/20230112023-08-25025 August 2023 Comprehensive Engineering Team Inspection Report 05000269/2023011 and 05000270/2023011 and 05000287/2023011 IR 05000413/20230052023-08-25025 August 2023 Updated Inspection Plan for Catawba Nuclear Station Units 1 and 2 (Report 05000413/2023005 and 05000414/2023005) IR 05000369/20230052023-08-25025 August 2023 Updated Inspection Plan for McGuire Nuclear Station Units 1 and 2 (Report 05000369/2023005 and 05000370/2023005) ML23233A1692023-08-17017 August 2023 EN 56683 - Curtiss Wright, Interim Notification Report for PotentialPurt2l IR 05000369/20230022023-07-28028 July 2023 Integrated Inspection Report 05000369/2023002 and 05000370/2023002 IR 05000269/20230022023-07-28028 July 2023 Integrated Inspection Report 05000269/2023002, 05000270/2023002 and 05000287/2023002 ML23208A0972023-07-27027 July 2023 Subsequent License Renewal List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected IR 05000413/20230022023-07-25025 July 2023 Integrated Inspection Report 05000413/2023002 and 05000414/2023002 IR 05000369/20234202023-07-24024 July 2023 Security Baseline Inspection Report 050003692023420 and 050003702023420 ML23206A0092023-07-24024 July 2023 William B. McGuire Nuclear Station Operator Licensing Written Examination Approval 05000369/2023301 and 05000370/2023301 IR 05000269/20230102023-07-19019 July 2023 Biennial Problem Identification and Resolution Inspection Report 05000269/2023010 and 05000270/2023010 and 05000287/2023010 and Notice of Violation ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23178A0682023-07-0303 July 2023 Audit Plan Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 & 3 Systems Section XI, Division 1 ML23159A2712023-06-20020 June 2023 William B. McGuire Nuclear Station, Unit 1 - Relief Request Impractical Reactor System Welds ML23237A2672023-06-13013 June 2023 June 13, 2002 - Meeting Announcement - McGuire and Catawba Nuclear Stations 50-369, 50-370 and 50-413, 50-414 ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined ML23132A2392023-06-0101 June 2023 Summary of the April 2023 Remote Environmental Audit Related to the Review of the Subsequent License Renewal Application ML23144A0192023-05-25025 May 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report (O3R31) IR 05000269/20230012023-05-12012 May 2023 Integrated Inspection Report 05000269/2023001 and 05000270/2023001 and 05000287/2023001 IR 05000413/20230012023-05-0505 May 2023 Integrated Inspection Report 05000413/2023001 and 05000414/2023001 ML23121A0552023-05-0303 May 2023 Acknowledgement of Withdrawal Request to Revise TS 5.5.2 Containment Leakage Rate Testing Program ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML23115A2122023-05-0101 May 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report IR 05000369/20230012023-05-0101 May 2023 Integrated Inspection Report 05000369/2023001 and 05000370/2023001 IR 05000413/20230112023-04-25025 April 2023 Focused Engineering Inspection Report 05000413/2023011 and 05000414/2023011 2024-02-02
[Table view] |
Text
DUKE ENERGY.SAFEGUARDS INFORMATION When separated, this page is decontrolled.
Michael J. Annacone 526 South Church Street Charlotte, NC 28202 Mailing Address: Mail Code EC07H / P.O. Box 1006 Charlotte, NC 28201-1006 Office: 980-373-2544 Fax: 704-382-6056 June 26, 2013 10 CFR 50.4 10 CFR 50.54(p)10 CFR 72.44(e)10 CFR 72.186(b)U. S. Nuclear Regulatory Commission Attention:
Document Control Desk Washington, D. C. 20555-001 Catawba Nuclear Station, Units I and 2 Docket Numbers 50-413 and 50-414/Renewed License Numbers NPF-35 and NPF-52 McGuire Nuclear Station, Unit 1 and 2 Docket Numbers 50-369, and 50-370/Renewed License Numbers NPF-9 and NPF-17 Oconee Nuclear Station, Unit 1, 2 and 3 Docket Numbers 50-269, 50-270, and 50-287/Renewed License Numbers DPR-38, DPR-47, and DPR-55 Oconee Nuclear Station Independent Spent Fuel Storage Installation (ISFSI)Docket Number 72-04/License Number SNM-2503
Subject:
Duke Energy Carolinas, LLC; Duke Energy Physical Security Plan, Revision 20
References:
(1) NRC letter to Duke Energy Carolinas, LLC dated November 7,2012, Oconee Nuclear Station Units 1, 2 and 3 Request for Additional Information Regarding Revision 18 to Physical Security Plan, (Accession Nos.: Letter: ML12307A369
Enclosure:
ML12296A007)
(2) NRC letter to Duke Energy Carolinas, LLC dated January 16, 2013, McGuire Nuclear Station Units 1 and 2 Request for Additional Information Regarding Revision 18 to Physical Security Plan, (Accession Nos.: Letter: ML13010A552
Enclosure:
ML12293A182)(3) NRC letter to Duke Energy Carolinas, LLC dated January 16, 2013, Catawba Nuclear Station Units 1 and 2 Request for Additional Information Regarding Revision 18 to Physical Security Plan, (Accession Nos.: Letter: ML13010A551
Enclosure:
ML12293A063)(4) Duke Energy Carolinas, LLC letter to NRC dated April 10, 2013, Response to Request for Additional Information for Duke Energy-Catawba, McGuire and Oconee Site Physical Security Plan SAFEGUARDS INFORMATION When separated, this page is decontrolled.
!ýc0(
SAFEGUARDS INFORMATION When separated, this page is decontrolled.
United States Nuclear Regulatory Commission June 26, 2013 Page 2 In accordance with 10 CFR 50.54(p)(2), 10 CFR 72.44(e), and 10 CFR 72.186(b), this letter, from Duke Energy Carolinas, LLC, provides notification that the Duke Energy -Catawba, McGuire and Oconee Site Physical Security Plan, has been revised. Revision 20 of the plan will be effective on July 1, 2013.The plan revision incorporates changes being made as identified in Duke Energy letter to NRC dated April 10, 2013,
Attachment:
Duke Energy Carolinas, LLC.Response to NSIR Review -TAC 091660 10 CFR 50.54(p)(2)
Changes to Security Plan, Revision 18 [Reference (4)]. This plan also reflects changes to contingency weapons type implemented for contingency response at the McGuire site and changes to active vehicle barrier type implemented at the Oconee site.An evaluation of the plan revision in accordance with 10 CFR 50.54(p)(2), 10 CFR 72.44(e), and 10 CFR 72.186(b) has determined that the changes incorporated do not decrease the safeguards effectiveness of the physical protection program and performance objectives of security organization and the plan continues to meet the requirements of 10 CFR 73.51 and 10 CFR 73.55, as applicable.
This letter includes two attachments which contain Safeguards Information as defined in 10 CFR 73.2. Enclosure 1 contains a Summary Description of Changes. Attachment 2 contains a copy of the changes to applicable sections of the Duke Energy -Catawba, McGuire and Oconee Site Physical Security Plan, Revision 20.No new regulatory commitments have been made in this letter.If you have questions regarding this submittal, please contact Tim Wadsworth, Senior Technical Specialist, at (704) 382-5836.Sincerely, Michael J. Annacone, Vice President
-Organizational Effectiveness
&Regulatory Affairs
Attachment:
- 1. Summary Description of Changes [SAFEGUARDS INFORMATION]
- 2. Duke Energy -Catawba, McGuire and Oconee Site Physical Security Plan, Revision 20.[SAFEGUARDS INFORMATION]
United States Nuclear Regulatory Commission SAFEGUARDS INFORMATION When separated, this page is decontrolled.
SAFEGUARDS INFORMATION When separated, this page is decontrolled.
June 26, 2013 Page 3 xc: (w/ attachment)
V. M. McCree, Regional Administrator U.S. Nuclear Regulatory Commission
-Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 xc: (wlo attachment)
J. S. Kim, Project Manager (CNS & MNS)U.S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop 8 C2 Rockville, MD 20852-2738 J. Boska, Project Manager (ONS)U.S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop 8 G9A Rockville, MD 20852-2738 E. L. Crowe NRC Senior Resident Inspector Oconee Nuclear Station J. Zeiler NRC Senior Resident Inspector McGuire Nuclear Station G. A. Hutto NRC Senior Resident Inspector Catawba Nuclear Station United States Nuclear Regulatory Commission SAFEGUARDS INFORMATION When separated, this page is decontrolled.