IR 05000424/2015006: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 3: | Line 3: | ||
| issue date = 03/02/2016 | | issue date = 03/02/2016 | ||
| title = Annual Assessment Letter for Vogtle Electric Generating Plant Unit 1 and Unit 2 (Report 05000424/2015006 and 05000425/2015006) | | title = Annual Assessment Letter for Vogtle Electric Generating Plant Unit 1 and Unit 2 (Report 05000424/2015006 and 05000425/2015006) | ||
| author name = Franke M | | author name = Franke M | ||
| author affiliation = NRC/RGN-II/DRP | | author affiliation = NRC/RGN-II/DRP | ||
| addressee name = Taber B | | addressee name = Taber B | ||
| addressee affiliation = Southern Nuclear Operating Co, Inc | | addressee affiliation = Southern Nuclear Operating Co, Inc | ||
| docket = 05000424, 05000425 | | docket = 05000424, 05000425 | ||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:March 2, 2016 | ||
==SUBJECT:== | |||
ANNUAL ASSESSMENT LETTER FOR VOGTLE ELECTRIC GENERATING PLANT UNIT 1 AND UNIT 2 (REPORT 05000 424/20 15 00 6 AND 05000 4 25/20 15006) | |||
SUBJECT: ANNUAL ASSESSMENT LETTER FOR VOGTLE ELECTRIC GENERATING PLANT UNIT 1 AND UNIT 2 (REPORT 05000 424/20 15 00 6 AND 05000 4 25/20 15006) | |||
==Dear Mr. Taber:== | ==Dear Mr. Taber:== | ||
On February 9, 2016, the NRC completed its end | On February 9, 2016, the NRC completed its end-of-cycle performance review of Vogtle Electric Generating Plant, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 20 15 through December 31, 20 15. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. | ||
-of-cycle performance review of Vogtle Electric Generating Plant, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 20 15 through December 31, 20 15. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. | |||
The NRC determined the performance at Vogtle Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRC | The NRC determined the performance at Vogtle Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRC | ||
Line 36: | Line 33: | ||
Therefore, in accordance with the guidance in Inspection Manual Chapter 0305, "Operating Reactor Assessment Program," this White finding was only considered in assessing plant performance for a total of four quarters. As a result, the NRC determined the performance at Vogtle Unit s 1 and 2 to be in the Licensee Response Column of the ROP Action Matrix as of October 1, 2015. | Therefore, in accordance with the guidance in Inspection Manual Chapter 0305, "Operating Reactor Assessment Program," this White finding was only considered in assessing plant performance for a total of four quarters. As a result, the NRC determined the performance at Vogtle Unit s 1 and 2 to be in the Licensee Response Column of the ROP Action Matrix as of October 1, 2015. | ||
Therefore, the NRC plans to conduct ROP baseline inspections at your facility. In addition, we will conduct initial reactor operator licensing examinations and Inspection Procedure 37060, "10 CFR 50.69 Risk | Therefore, the NRC plans to conduct ROP baseline inspections at your facility. In addition, we will conduct initial reactor operator licensing examinations and Inspection Procedure 37060, "10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems, and Components Inspection | ||
-Informed Categorization and Treatment of Structures, Systems, and Components Inspection | |||
." The enclosed inspection plan lists the inspections scheduled through December 31 | ." The enclosed inspection plan lists the inspections scheduled through December 31 | ||
, 20 17. Routine inspections performed by resident inspectors are not included in the inspection plan. | , 20 17. Routine inspections performed by resident inspectors are not included in the inspection plan. | ||
The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid | The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. | ||
-cycle performance review. | |||
The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. | The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. | ||
This inspection plan does not include security related inspections which will be sent via separate, non | This inspection plan does not include security related inspections which will be sent via separate, non-publicly available correspondence. | ||
-publicly available correspondence. | |||
In response to the accident at Fukushima, the Commission issued Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond | In response to the accident at Fukushima, the Commission issued Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events." This Order requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. | ||
-Design-Basis External Events." This Order requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond | |||
-design-basis external event. | |||
Additionally, the Commission issued Order EA | Additionally, the Commission issued Order EA-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation." This Order requires licensees to have a reliable means of remotely monitoring wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. | ||
-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation." This Order requires licensees to have a reliable means of remotely monitoring wide | |||
-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond | |||
-design-basis external event. | |||
The NRC is conducting audits of licensee efforts towards compliance with these Orders. | The NRC is conducting audits of licensee efforts towards compliance with these Orders. | ||
Line 64: | Line 53: | ||
After the NRC staff receives the Final Compliance letter for the site, the Final Safety Evaluation will be issued. | After the NRC staff receives the Final Compliance letter for the site, the Final Safety Evaluation will be issued. | ||
Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing Temporary Instruction 191, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi | Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing Temporary Instruction 191, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans." | ||
-Unit Dose Assessment Plans." | |||
In accordance with 10 CFR 2.390 of the NRC | In accordance with 10 CFR 2.390 of the NRC | ||
's "Rules of Practice and Procedure | 's "Rules of Practice and Procedure | ||
," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading | ," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | ||
-rm/adams.html (the Public Electronic Reading Room). | |||
Please contact Mr. Shane Sandal at (404) 997-4513 with any questions you have regarding this letter. | Please contact Mr. Shane Sandal at (404) 997-4513 with any questions you have regarding this letter. | ||
Line 79: | Line 66: | ||
Docket Nos.: | Docket Nos.: | ||
0 5 000424, 0 5 00 0425 License Nos.: | 0 5 000424, 0 5 00 0425 License Nos.: | ||
NPF-68 and NPF | NPF-68 and NPF-81 Enclosure: | ||
-81 Enclosure: | |||
Vogtle Activity/Inspection Plan (03/01/2016 | Vogtle Activity/Inspection Plan (03/01/2016 | ||
- 12/31/2017) | - 12/31/2017) | ||
Line 91: | Line 77: | ||
ROP Reports ROP Assessment | ROP Reports ROP Assessment | ||
Page 1 of 2 03/02/2016 08:18:30 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteVogtleInspection / Activity Plan 03/01/2016 | Page 1 of 2 03/02/2016 08:18:30 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteVogtleInspection / Activity Plan 03/01/2016-12/31/2017 RP-RP OCCUPATIONAL INSPECTION WEEK 1 3 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 03/07/201603/11/2016 1, 2 IP Occupational ALARA Planning and Controls71124.02 03/07/201603/11/2016 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 03/07/201603/11/2016 1, 2 IP Occupational Dose Assessment71124.04 03/07/201603/11/2016 1, 2 IP Performance Indicator Verification71151 03/07/201603/11/2016 ISI-UNIT 2 IN-SERVICE INSPECTION 1 2 IP Inservice Inspection Activities - PWR7111108P 03/14/2016 03/18/2016 SGISI-UNIT 2 SG IN-SERVICE INSPECTION 1 2 IP Inservice Inspection Activities - PWR7111108P 03/21/2016 03/25/2016 RP-RP OCCUPATIONAL INSPECTION WEEK 2 1 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 03/21/2016 03/25/2016 1, 2 IP Occupational ALARA Planning and Controls71124.02 03/21/2016 03/25/2016 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 03/21/2016 03/25/2016 1, 2 IP Occupational Dose Assessment71124.04 03/21/2016 03/25/2016 1, 2 IP Performance Indicator Verification71151 03/21/2016 03/25/2016 EP-EP EXERCISE INSPECTION 8 1, 2 IP Exercise Evaluation7111401 05/09/2016 05/13/2016 1, 2 IP Emergency Action Level and Emergency Plan Changes7111404 05/09/2016 05/13/2016 1, 2 IP Performance Indicator Verification71151 05/09/2016 05/13/2016 PB2-5069-10CFR50.69 IMPLEMENTATION 5 1, 2 IP IP 37060, "10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems 37060 06/13/2016 06/17/2016 1, 2 IP IP 37060, "10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems 37060 06/27/2016 07/01/2016 CDBI-COMPONENT DESIGN BASES INSPECTION 7 1, 2 IP Component Design Bases Inspection7111121 09/12/2016 09/16/2016 1, 2 IP Component Design Bases Inspection7111121 10/03/2016 10/07/2016 1, 2 IP Component Design Bases Inspection7111121 10/17/2016 10/21/2016 1, 2 IP Component Design Bases Inspection7111121 10/31/201611/04/2016 RP-RP INSTRUMENTS 1 1, 2 IP Radiation Monitoring Instrumentation71124.0511/14/201611/18/2016 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 5 1, 2 IP Problem Identification and Resolution71152B 02/20/2017 02/24/2017 1, 2 IP Problem Identification and Resolution71152B 03/06/2017 03/10/2017 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures. | ||
-12/31/2017 RP-RP OCCUPATIONAL INSPECTION WEEK 1 3 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 03/07/201603/11/2016 1, 2 IP Occupational ALARA Planning and Controls71124.02 03/07/201603/11/2016 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 03/07/201603/11/2016 1, 2 IP Occupational Dose Assessment71124.04 03/07/201603/11/2016 1, 2 IP Performance Indicator Verification71151 03/07/201603/11/2016 ISI-UNIT 2 IN-SERVICE INSPECTION 1 2 IP Inservice Inspection Activities - PWR7111108P 03/14/2016 03/18/2016 SGISI-UNIT 2 SG IN-SERVICE INSPECTION 1 2 IP Inservice Inspection Activities - PWR7111108P 03/21/2016 03/25/2016 RP-RP OCCUPATIONAL INSPECTION WEEK 2 1 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 03/21/2016 03/25/2016 1, 2 IP Occupational ALARA Planning and Controls71124.02 03/21/2016 03/25/2016 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 03/21/2016 03/25/2016 1, 2 IP Occupational Dose Assessment71124.04 03/21/2016 03/25/2016 1, 2 IP Performance Indicator Verification71151 03/21/2016 03/25/2016 EP-EP EXERCISE INSPECTION 8 1, 2 IP Exercise Evaluation7111401 05/09/2016 05/13/2016 1, 2 IP Emergency Action Level and Emergency Plan Changes7111404 05/09/2016 05/13/2016 1, 2 IP Performance Indicator Verification71151 05/09/2016 05/13/2016 PB2-5069-10CFR50.69 IMPLEMENTATION 5 1, 2 IP IP 37060, "10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems 37060 06/13/2016 06/17/2016 1, 2 IP IP 37060, "10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems 37060 06/27/2016 07/01/2016 CDBI-COMPONENT DESIGN BASES INSPECTION 7 1, 2 IP Component Design Bases Inspection7111121 09/12/2016 09/16/2016 1, 2 IP Component Design Bases Inspection7111121 10/03/2016 10/07/2016 1, 2 IP Component Design Bases Inspection7111121 10/17/2016 10/21/2016 1, 2 IP Component Design Bases Inspection7111121 10/31/201611/04/2016 RP-RP INSTRUMENTS 1 1, 2 IP Radiation Monitoring Instrumentation71124.0511/14/201611/18/2016 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 5 1, 2 IP Problem Identification and Resolution71152B 02/20/2017 02/24/2017 1, 2 IP Problem Identification and Resolution71152B 03/06/2017 03/10/2017 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures. | |||
Page 2 of 2 03/02/2016 08:18:30 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteVogtleInspection / Activity Plan 03/01/2016 | Page 2 of 2 03/02/2016 08:18:30 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteVogtleInspection / Activity Plan 03/01/2016-12/31/2017OL EXAM-INITIAL LICENSE EXAM PREP 3 1 VOGTLE/UNIT 1 APRIL 2017 INITIAL EXAM AT POWER FACILITIES V23491 03/20/2017 03/24/2017 ISI-UNIT 1 IN-SERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 04/03/2017 04/07/2017 SGISI-UNIT 1 SG IN-SERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 04/10/2017 04/14/2017OL EXAM-INITIAL LICENSE EXAM 3 1 VOGTLE/UNIT 1 APRIL 2017 INITIAL EXAM AT POWER FACILITIES V23491 05/01/2017 05/19/2017 EP-EP PROGRAM INSPECTION 5 1, 2 IP A lert and Notification System Testing7111402 05/22/2017 05/26/2017 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 05/22/2017 05/26/2017 1, 2 IP Emergency Action Level and Emergency Plan Changes7111404 05/22/2017 05/26/2017 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 05/22/2017 05/26/2017 1, 2 IP Performance Indicator Verification71151 05/22/2017 05/26/2017 TFPI-TRIENNIEL FIRE PROTECTION INSPECTION 1 1, 2 IP Fire Protection [Triennial]7111105T 06/12/2017 06/16/2017 1, 2 IP Fire Protection [Triennial]7111105T 06/26/2017 06/30/2017 HS-TRIENNIAL HEAT SINK PERFORMANCE 1 1, 2 IP Heat Sink Performance7111107T 07/10/2017 07/14/2017OL RQ-REQUAL INSPECTION 2 1, 2 IP Licensed Operator Requalification Program7111111B 08/21/2017 08/25/2017 RP-RP PUBLIC INSPECTION 3 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 09/18/2017 09/22/2017 1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 09/18/2017 09/22/2017 1, 2 IP Radiological Environmental Monitoring Program71124.07 09/18/2017 09/22/2017 1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.08 09/18/2017 09/22/2017 1, 2 IP Performance Indicator Verification71151 09/18/2017 09/22/2017 ISI-UNIT 2 IN-SERVICE INSPECTION 1 2 IP Inservice Inspection Activities - PWR7111108P 09/25/2017 09/29/2017 SGISI-UNIT 2 SG IN-SERVICE INSPECTION 1 2 IP Inservice Inspection Activities - PWR7111108P 10/02/2017 10/06/2017 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures. | ||
-12/31/2017OL EXAM-INITIAL LICENSE EXAM PREP 3 1 VOGTLE/UNIT 1 APRIL 2017 INITIAL EXAM AT POWER FACILITIES V23491 03/20/2017 03/24/2017 ISI-UNIT 1 IN-SERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 04/03/2017 04/07/2017 SGISI-UNIT 1 SG IN-SERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 04/10/2017 04/14/2017OL EXAM-INITIAL LICENSE EXAM 3 1 VOGTLE/UNIT 1 APRIL 2017 INITIAL EXAM AT POWER FACILITIES V23491 05/01/2017 05/19/2017 EP-EP PROGRAM INSPECTION 5 1, 2 IP A lert and Notification System Testing7111402 05/22/2017 05/26/2017 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 05/22/2017 05/26/2017 1, 2 IP Emergency Action Level and Emergency Plan Changes7111404 05/22/2017 05/26/2017 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 05/22/2017 05/26/2017 1, 2 IP Performance Indicator Verification71151 05/22/2017 05/26/2017 TFPI-TRIENNIEL FIRE PROTECTION INSPECTION 1 1, 2 IP Fire Protection [Triennial]7111105T 06/12/2017 06/16/2017 1, 2 IP Fire Protection [Triennial]7111105T 06/26/2017 06/30/2017 HS-TRIENNIAL HEAT SINK PERFORMANCE 1 1, 2 IP Heat Sink Performance7111107T 07/10/2017 07/14/2017OL RQ-REQUAL INSPECTION 2 1, 2 IP Licensed Operator Requalification Program7111111B 08/21/2017 08/25/2017 RP-RP PUBLIC INSPECTION 3 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 09/18/2017 09/22/2017 1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 09/18/2017 09/22/2017 1, 2 IP Radiological Environmental Monitoring Program71124.07 09/18/2017 09/22/2017 1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.08 09/18/2017 09/22/2017 1, 2 IP Performance Indicator Verification71151 09/18/2017 09/22/2017 ISI-UNIT 2 IN-SERVICE INSPECTION 1 2 IP Inservice Inspection Activities - PWR7111108P 09/25/2017 09/29/2017 SGISI-UNIT 2 SG IN-SERVICE INSPECTION 1 2 IP Inservice Inspection Activities - PWR7111108P 10/02/2017 10/06/2017 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures. | |||
}} | }} |
Revision as of 07:49, 20 June 2019
ML16062A285 | |
Person / Time | |
---|---|
Site: | Vogtle |
Issue date: | 03/02/2016 |
From: | Mark Franke Division Reactor Projects II |
To: | Taber B Southern Nuclear Operating Co |
References | |
IR 2015006 | |
Download: ML16062A285 (6) | |
Text
March 2, 2016
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR VOGTLE ELECTRIC GENERATING PLANT UNIT 1 AND UNIT 2 (REPORT 05000 424/20 15 00 6 AND 05000 4 25/20 15006)
Dear Mr. Taber:
On February 9, 2016, the NRC completed its end-of-cycle performance review of Vogtle Electric Generating Plant, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 20 15 through December 31, 20 15. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined the performance at Vogtle Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRC
's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., Green). Through the first three quarters of the 2015 assessment cycle Vogtle Units 1 and 2 were in the Regulatory Response Column of the ROP Action Matrix based on a White finding that was the subject of Inspection Report 05000424/2014009.
After reviewing your performance in addressing the White finding, the NRC concluded that your actions met the objectives of Inspection Procedure 95001, "Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area."
Therefore, in accordance with the guidance in Inspection Manual Chapter 0305, "Operating Reactor Assessment Program," this White finding was only considered in assessing plant performance for a total of four quarters. As a result, the NRC determined the performance at Vogtle Unit s 1 and 2 to be in the Licensee Response Column of the ROP Action Matrix as of October 1, 2015.
Therefore, the NRC plans to conduct ROP baseline inspections at your facility. In addition, we will conduct initial reactor operator licensing examinations and Inspection Procedure 37060, "10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems, and Components Inspection
." The enclosed inspection plan lists the inspections scheduled through December 31
, 20 17. Routine inspections performed by resident inspectors are not included in the inspection plan.
The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review.
The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
This inspection plan does not include security related inspections which will be sent via separate, non-publicly available correspondence.
In response to the accident at Fukushima, the Commission issued Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events." This Order requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event.
Additionally, the Commission issued Order EA-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation." This Order requires licensees to have a reliable means of remotely monitoring wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event.
The NRC is conducting audits of licensee efforts towards compliance with these Orders.
The audit was completed for Vogtle Units 1 and 2, and the information gathered will aid staff in development of the Safety Evaluation for the site.
After the NRC staff receives the Final Compliance letter for the site, the Final Safety Evaluation will be issued.
Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing Temporary Instruction 191, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans."
In accordance with 10 CFR 2.390 of the NRC
's "Rules of Practice and Procedure
," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact Mr. Shane Sandal at (404) 997-4513 with any questions you have regarding this letter.
Sincerely,
/RA/ Mark Franke, Acting Director Division of Reactor Projects
Docket Nos.:
0 5 000424, 0 5 00 0425 License Nos.:
Vogtle Activity/Inspection Plan (03/01/2016
- 12/31/2017)
cc Distribution via ListServ
_________________________
SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP SIGNATURE KPK1 SRS5 MEF1 NAME K. Kirchbaum S. Sandal M. Franke DATE 2/24/2016 2/24/2016 2/24/2016 3/ /2016 3/ /2016 3/ /2016 3/ /2016 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO Letter to Brian from Mark E. Franke dated March 2, 2016 SUBJECT: ANNUAL ASSESSMENT LETTER FOR VOGTLE ELECTRIC GENERATING PLANT UNIT 1 AND UNIT 2 (REPORT 05000 424/20 15 00 6 AND 05000 425/20 15006) DISTRIBUTION:
D. Gamberoni, RII L. Gibson, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMVogtle Resource Institute of Nuclear Power Operations (INPO)
Page 1 of 2 03/02/2016 08:18:30 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteVogtleInspection / Activity Plan 03/01/2016-12/31/2017 RP-RP OCCUPATIONAL INSPECTION WEEK 1 3 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 03/07/201603/11/2016 1, 2 IP Occupational ALARA Planning and Controls71124.02 03/07/201603/11/2016 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 03/07/201603/11/2016 1, 2 IP Occupational Dose Assessment71124.04 03/07/201603/11/2016 1, 2 IP Performance Indicator Verification71151 03/07/201603/11/2016 ISI-UNIT 2 IN-SERVICE INSPECTION 1 2 IP Inservice Inspection Activities - PWR7111108P 03/14/2016 03/18/2016 SGISI-UNIT 2 SG IN-SERVICE INSPECTION 1 2 IP Inservice Inspection Activities - PWR7111108P 03/21/2016 03/25/2016 RP-RP OCCUPATIONAL INSPECTION WEEK 2 1 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 03/21/2016 03/25/2016 1, 2 IP Occupational ALARA Planning and Controls71124.02 03/21/2016 03/25/2016 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 03/21/2016 03/25/2016 1, 2 IP Occupational Dose Assessment71124.04 03/21/2016 03/25/2016 1, 2 IP Performance Indicator Verification71151 03/21/2016 03/25/2016 EP-EP EXERCISE INSPECTION 8 1, 2 IP Exercise Evaluation7111401 05/09/2016 05/13/2016 1, 2 IP Emergency Action Level and Emergency Plan Changes7111404 05/09/2016 05/13/2016 1, 2 IP Performance Indicator Verification71151 05/09/2016 05/13/2016 PB2-5069-10CFR50.69 IMPLEMENTATION 5 1, 2 IP IP 37060, "10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems 37060 06/13/2016 06/17/2016 1, 2 IP IP 37060, "10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems 37060 06/27/2016 07/01/2016 CDBI-COMPONENT DESIGN BASES INSPECTION 7 1, 2 IP Component Design Bases Inspection7111121 09/12/2016 09/16/2016 1, 2 IP Component Design Bases Inspection7111121 10/03/2016 10/07/2016 1, 2 IP Component Design Bases Inspection7111121 10/17/2016 10/21/2016 1, 2 IP Component Design Bases Inspection7111121 10/31/201611/04/2016 RP-RP INSTRUMENTS 1 1, 2 IP Radiation Monitoring Instrumentation71124.0511/14/201611/18/2016 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 5 1, 2 IP Problem Identification and Resolution71152B 02/20/2017 02/24/2017 1, 2 IP Problem Identification and Resolution71152B 03/06/2017 03/10/2017 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
Page 2 of 2 03/02/2016 08:18:30 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteVogtleInspection / Activity Plan 03/01/2016-12/31/2017OL EXAM-INITIAL LICENSE EXAM PREP 3 1 VOGTLE/UNIT 1 APRIL 2017 INITIAL EXAM AT POWER FACILITIES V23491 03/20/2017 03/24/2017 ISI-UNIT 1 IN-SERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 04/03/2017 04/07/2017 SGISI-UNIT 1 SG IN-SERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 04/10/2017 04/14/2017OL EXAM-INITIAL LICENSE EXAM 3 1 VOGTLE/UNIT 1 APRIL 2017 INITIAL EXAM AT POWER FACILITIES V23491 05/01/2017 05/19/2017 EP-EP PROGRAM INSPECTION 5 1, 2 IP A lert and Notification System Testing7111402 05/22/2017 05/26/2017 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 05/22/2017 05/26/2017 1, 2 IP Emergency Action Level and Emergency Plan Changes7111404 05/22/2017 05/26/2017 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 05/22/2017 05/26/2017 1, 2 IP Performance Indicator Verification71151 05/22/2017 05/26/2017 TFPI-TRIENNIEL FIRE PROTECTION INSPECTION 1 1, 2 IP Fire Protection [Triennial]7111105T 06/12/2017 06/16/2017 1, 2 IP Fire Protection [Triennial]7111105T 06/26/2017 06/30/2017 HS-TRIENNIAL HEAT SINK PERFORMANCE 1 1, 2 IP Heat Sink Performance7111107T 07/10/2017 07/14/2017OL RQ-REQUAL INSPECTION 2 1, 2 IP Licensed Operator Requalification Program7111111B 08/21/2017 08/25/2017 RP-RP PUBLIC INSPECTION 3 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 09/18/2017 09/22/2017 1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 09/18/2017 09/22/2017 1, 2 IP Radiological Environmental Monitoring Program71124.07 09/18/2017 09/22/2017 1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.08 09/18/2017 09/22/2017 1, 2 IP Performance Indicator Verification71151 09/18/2017 09/22/2017 ISI-UNIT 2 IN-SERVICE INSPECTION 1 2 IP Inservice Inspection Activities - PWR7111108P 09/25/2017 09/29/2017 SGISI-UNIT 2 SG IN-SERVICE INSPECTION 1 2 IP Inservice Inspection Activities - PWR7111108P 10/02/2017 10/06/2017 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.