ML17266A368: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 11/06/1980
| issue date = 11/06/1980
| title = LER 80-057/03L-0:on 801008,3-inch Rip Noted in Fire Hose & Equivalent Capacity Hose Not Routed to Unprotected Area within 1-h.Caused by Procedural Deficiency.Procedure Modified
| title = LER 80-057/03L-0:on 801008,3-inch Rip Noted in Fire Hose & Equivalent Capacity Hose Not Routed to Unprotected Area within 1-h.Caused by Procedural Deficiency.Procedure Modified
| author name = PACE P L
| author name = Pace P
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  

Revision as of 01:46, 19 June 2019

LER 80-057/03L-0:on 801008,3-inch Rip Noted in Fire Hose & Equivalent Capacity Hose Not Routed to Unprotected Area within 1-h.Caused by Procedural Deficiency.Procedure Modified
ML17266A368
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 11/06/1980
From: Pace P
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML17209A397 List:
References
LER-80-057-03L, LER-80-57-3L, NUDOCS 8012020557
Download: ML17266A368 (2)


Text

NRC PORAS 266 P 77)LICENSEE EVENT REPORT U.S.NUCLEAR RECUI.ATORY CohIMISS3ON

~O l CON'T~O 0 2"'"""*': LJ I rl L 5 I SlL l 1 Q2 0 LICENScc Cooc I~I Ql 4 Ol'01010 101 01-0 0 3 41 l l 111 i~IQZ (PL ASB PRINT OR TYPE AL3.RKQUIRKO INFORhlATIONI Q..I.iCSNSr.TYPS JJ 5~<<*6C,, LICS>'4SK NI>IASE>1;".:;Z.S I>>I Zi.I'~6161'60 6 I QQCRETNVM9cA 53 SS EVE'IT OATS lc I5 R SPQAT QATc 30 VENT OKSCRIPTIQN

'NO PRCBABLCONScQUcNCSS QIO Durin the routine 31 da'surveillance of fire hose.stations in accordance I~O4~OS with T.S.4.7.11.2.a, a 3 inch ri was noted in one of the fire hoses.An equivalent capacity fire hose was not routed to the unprotected area within one hour in accordance with T.S.3.7.11.2.a.

This incident had no effect on plant performance.

This is the first LER of this type.n I 60 Cause for not in>lementin the action re uired in T.S.3.7.11.2.a was a 9 SYSTESI CAUSE CA VSE~C OAIP.VA LV E CQCE'QQE SUSCQDE COMPONENT C<<QE SUSCQOS SVS QQK QII~0'lz~XQIZ X X I XI X X I X QI LXJQIZ 1~X Q 9 10 I I l2 Ia IS ScQVENTI*t.

OC UARENCE REPCAT A EV ZS ION 6 LER,RO EVENT YEAR RcPORT.I Q.COOS TYPE VQ, QIZ>6>3>6~OI0~~05 7~W~03~L[-J 1 01 2I 22 22 24 IS 28 SI 32 ACTION PVTVAK EPPZCT SHUT<<<<QIVN AT.ACI>ME>IT N)RQa PRIMC CQVP CQMPCNENT TAZCEN AC'XIQN C.'IPLANT AIKTNQQ.>IQVAS Q2 SI>SuzTTZQ 4CRII SUS.SVPSLIER VAZIUPA<<~VREA 6L6SLJS LCS LCS~L<procedure deficiency.

The procedure did not s ecif the actions re uired on findin a dama procedure (>f-0018).

has been incor orated into the 4 3 9 PACILI~P S.AXVS".~POWER QTNER Sl ATUS Q s H Ka 1 010 9 NA I I 12 LCSS QP CA OAMAOS TQ PACILITY Q42.YPc QEJ<<AIPTIQN

~ZQ42 10 PVALICITY.~EQ QES<<AIPT:Crl

~4~Z 44 9 10 3 NA 2 O NAMIB OP PREPARER P.L.Pace Q~IQ ACTIVITY CONTENT AELZASEQ QP RELEASE AMQVNTQP ACTIVITY QSS 330 LIS L'JSI I 3 9:0 44 PERSONNEL EXPCX<<>lr 5 NUcISEP~YSE QESCAIPTIQN Q<<S EDD La~0'o QL~JQS NA I 3 I I I2 IS rERSQNIZEL INJVAZES NVXISEA QESCAIP TIQNQAI~010 0 Ga NA QO QP OISCQVKAY MQS'S 45 QISCQVZAY QESCAIPTIQN QS2 31 da surveillance LOCATION QI'ELKASE Q26 NA NRC USE ONLY PNQ~K 3 5)552-3801 30 50 30 8 012089 597