| issue date = 07/21/1980
| issue date = 07/21/1980
| title = Final Deficiency Mcar 1-58,per 10CFR50.55(e) & Part 21,re GE Equipment Lacking Proper Slope.Caused by Unclear Design Drawings & Const Failures.All Affected Drawings Will Be Revised & Unit 1 as-builts Completed by 801230
| title = Final Deficiency Mcar 1-58,per 10CFR50.55(e) & Part 21,re GE Equipment Lacking Proper Slope.Caused by Unclear Design Drawings & Const Failures.All Affected Drawings Will Be Revised & Unit 1 as-builts Completed by 801230
| author name = CURTIS N W
| author name = Curtis N
| author affiliation = PENNSYLVANIA POWER & LIGHT CO.
| author affiliation = PENNSYLVANIA POWER & LIGHT CO.
| addressee name =  
| addressee name =  

Revision as of 02:53, 18 June 2019

Final Deficiency Mcar 1-58,per 10CFR50.55(e) & Part 21,re GE Equipment Lacking Proper Slope.Caused by Unclear Design Drawings & Const Failures.All Affected Drawings Will Be Revised & Unit 1 as-builts Completed by 801230
ML18030A134
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 07/21/1980
From: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
To:
References
100450, 100508, MCAR-1-58, PLA-512, NUDOCS 8007280215
Download: ML18030A134 (5)


Text

t/t HEGULATO INFORMATION DISTRIBUTION

~TEH (RIDS)l ii ACCESSION NSR:8007280215 DOC.DATE: 80/07/2l NOTARIZED:

NO DOCKET FACIL:.Susquehanna Steam Electric Stationi Unit 1~Pennsylva 05000387 0"388 usquehanna Steam Electric Stationg Unit 28 Pennsylva 05000388 AjJ H,i AUTHOR AFFILIATION C+T ISF N~iv~Pennsylvania Power 8 Light Co~HEC IP~NIAHE RECIPIENT AFFILIATION

SUBJECT:

Final Oef equipment drawings revised DISTRIBUTION CODE: TITLE: iciency SCAR 1-58 per 10CFR50.55(e) 8 Part 21FGE lacking proper slope, Caused by unclear design const failures.All affected drawings will be Unit 1 as builts completed by 801230.801'4S COPIES RECEIVED:LTR ENCL SIZE: Construction Oeticiency Reoort (IOCFR50.552>

t'BOOTES:Send IIlE 3 copies FSAR 4 all amends'end ILE 3 copies FSAR 8 all amends'5000387 05000388 ACT ION: RE C I P I E'l T ID CODE/NAl~E A/0 LICENSNG 21 RUSHBRGOKFI>

~20 STARKeR~14 COPIES LTTR EIXCL 1 1 1 1 1 REC IP IENT ID CODE/NA!4E YOUNGBLOODpB 15 SERV ICE 8 iH~20 COPIES LT l'R Ei4CL 1 1 1 1 IilTER."uAL; AO/RC I/IE O/OIR HU!l FAC S EOO 8 STAFF 07 F IELO COOR/IE13 LIC QUAL BR NRC PDR 02 C-.~EV BR HfG F II.E 01~fXADFO~E V 11 AEOD DIRE HUH FAC SFY E4UIP QUAL BR 16 ICE 05<PA 08 OELD 23 QA BR 10 RUTHERFORD'I

~IE 1 1 1 1 1 1 2 1 1 1 1 1 1 1 1 EXTERNAL: ACRS NSIC 2 q/04 ie 1 1 LPOR 03 g~g9 59 TOTAL NU~BER OF COPIES REQUIRED: LTTR~ENCL C" TWO NORTH NINTH STREET, ALLENTOWN>

PA.18101 PHONEr (215)821~5'151 NORMAN W.CURTIS Vice President-Engineering 8 Construction.Nuclear 821-5381 July 21, 1980 Mr.Boyce H.Griez Dizector, Region I U.S.Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 SUSQUEHANNA STEAM ELECTRIC STATION FINAL REPORT OF A DEFICIENCY ON IMPROPER SLOPING OF GENERAL ELECTRIC PIPING AND TUBING ERs 100450/100508

'ILE 840-4/900-10 PLA-512'ear Mr.Grier: This letter serves to confirm information provided by telephone to NRC Inspector Mr.J.Durr by Mr.A.R.Sabol of PP&L on June 17, 1980.During that conversation, Mr.Duzr was advised that the subject condition was under evaluation for reportability under the provision of 10CFR50.55(e).

The deficiency involves small piping and tubing installations to General Electric equipment.

The instrumentation piping and tubing affected does not meet specification requirements for the minimum slope required to insure proper system operation.

A final report concerning the condition, along with an analysis of the safety implications and corrective action, is included as an attachment pursuant to PP&L's obligations under the provisions of 10CFR50.55(e).

Since the details of this report provide information relevant to the reporting requirements of 10CFR21, this correspondence is considered to also dischazge any formal responsibility PP&L may have for reporting in compliance thereto.We trust the Commission will find the information provided by this letter to be satisfactory.

Very truly yours,~~.W.Curtis Vice President-Engineering

&Construction-Nuclear Attachment FLW:mcb PENNSYLVANIA POWER 8 LIGHT COMPANY Mr.Boyce H.Grier July 21, 1980 cc: Mr.Victor Stello (15)Director-Office of Inspection

&Enforcement U.S.Nuclear Regulatory Commission Washington, D.C.20555 Mr.G.McDonald, Director Office of Management Information

&Program Control U.S.Nuclear Regulatory Commission Washington, D.C.20555 Mr.Robert M.Gallo U.S.Nuclear Regulatory Commission P.0.Box 52 Shickshinny, Pennsylvania 18655 MCAR 1-58 FINAL REPORT~Sub ecc The installed piping and tubing to GE equipment is lacking proper slope.Descri tion of Potential Problem General Electric Piping and Tubing, Process Instrumentation Specification 22A4019, Paragraph 4.2.2.1.2, states: "Where slopes are indicated in the installation arrangement schematics or elsewhere, a minimum slope of 1/2" per foot shall be provided." Contrary to the stated requirement, Bechtel Nonconformance Report 5807 lists 41 small pipe installations to General Electric equipment that do not meet the minimum 1/2" per foot slope requirement.

Cause Three conditions may have contributed to the installation error.They are: 1.Pro)ect engineering did not specify the required slope (i e.l/2" per foot min)on some of the design drawings.2.Construction failed to incorporate specified slope requirements on some of the field prepared fabrication isometric drawings.3.Construction failed in some cases to install the small pipe to the slope specified on the Field fabrication isometric drawings.Anal sis of Safet Implications Project Engineering has determined if the deficiency were to have gone uncorrected it could have adversely affected the safe operation of the plant, and it is therefore deemed reportable under 10CFR 50.55(e).This deficiency could produce an error in essential instrumentation in excess of design limits.Inaccurate instrument readings and delayed trips could result.on lines which have differential instruments which function on low differential pressures.

This would be the result of air entrapment in the lines caused by improper slope.However, lines with devices which operate on high differential pressure would not be as sensitive toslope variations and would not adversely affect the safe operation of the plant.Corrective Action Field quality control has documented on Nonconformance Reports 5807 and 6055 all lines that do not meet the requirements of the GE specification (i.e., 1/2" per foot minimum slope).Pra5ect engineering has reviewed the problem with General Electric engineering and revised acceptance criteria have been developed for"installed" piping for the various categories of instrumentation involved.Engineering Memo for Construction 4992, dated June 16, 1980 forwarded this criteria to the field.Attachment Page 1 of 2 Those lines which have not yet been installed or lines which require rework shall be installed with a slope of 1/2" per foot.Field construction is reworking identified lines which do not meet the revised acceptance criteria.The Unit I as-built drawings will include the actual slope of installed lines.Pro]ect engineering will revise Unit II SKMs to include a note that the pipe and or tubing shall be installed to have a minimum slope of 1/2" per foot (ref.GE Spec.22A4019)and Unit II P&IDs to include the GE Spec.as a reference.

Field engineering will revise the Unit II fabrication Isometrics to reflect the above requirements.

Pro ected Com letion of Corrective Action All affected drawings are projected to be revised and Unit I as-builts are projected to be completed by December 30, 1980.In the interim, field construc-tion was notified by Engineering Memo for Construction 5062 to take steps to insure that the subject pipe and tubing are installed in accordance with GE Specification 22A4019.Any exceptions'are to be documented by a Nonconformance Report.Attachment Page 2 of 2