ML12181A372: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit #Contentions Addressed by ExhibitExhibit NameExhibit Submission DateRIVR00001AllRiverkeeper Hearing Exhibit List ("RIV Exhibit List")Dec. 22, 2011RIV000002RK-TC-2Riverkeeper Initial Statement of Position Regarding Contention RK-TC Flow Accelerated Corrosion ("RK-TC-2 SOP")Dec. 22, 2011RIV000003RK-TC-2Pre-Filed Testimony of Joram Hopenfeld in Support of RK-TC-2 ("Hopenfeld Testimony RK-TC-2")Dec. 22, 2011RIV000004RK-TC-2; RK-TC-1B; RK-TC-5Curriculum Vitae of Joram Hopenfeld ("Hopenfeld CV")Dec. 22, 2011RIV000005RK-TC-2Report of Joram Hopenfeld in Support of RK-TC-2 ("Hopenfeld RK-TC-2 Report")Dec. 22, 2011RIV000006RK-TC-2NRC Information Notice No 86-106, "Feed Water Line Break," December 16, 1986 ("NRC IN 86-106")Dec. 22, 2011RIV000007RK-TC-2NRC Bulletin 87-01, "Thinning Pipe Walls in Nuclear Plants," July 9, 1987  
{{#Wiki_filter:Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit #Contentions Addressed by ExhibitExhibit NameExhibit Submission DateRIVR00001AllRiverkeeper Hearing Exhibit List ("RIV Exhibit List")Dec. 22, 2011RIV000002RK-TC-2Riverkeeper Initial Statement of Position Regarding Contention RK-TC Flow Accelerated Corrosion ("RK-TC-2 SOP")Dec. 22, 2011RIV000003RK-TC-2Pre-Filed Testimony of Joram Hopenfeld in Support of RK-TC-2 ("Hopenfeld Testimony RK-TC-2")Dec. 22, 2011RIV000004RK-TC-2; RK-TC-1B; RK-TC-5Curriculum Vitae of Joram Hopenfeld ("Hopenfeld CV")Dec. 22, 2011RIV000005RK-TC-2Report of Joram Hopenfeld in Support of RK-TC-2 ("Hopenfeld RK-TC-2 Report")Dec. 22, 2011RIV000006RK-TC-2NRC Information Notice No 86-106, "Feed Water Line Break," December 16, 1986 ("NRC IN 86-106")Dec. 22, 2011RIV000007RK-TC-2NRC Bulletin 87-01, "Thinning Pipe Walls in Nuclear Plants," July 9, 1987
("NRC Bulletin 87-01")Dec. 22, 2011RIV000008RK-TC-2NRC Information Notice 1991-019, "Steam Generator Feed Water Distribution Piping Damage," March 12, 1991 ("NRC IN 1991-019")Dec. 22, 2011RIV000009RK-TC-2Monitoring Report 5-93-0042, Steam Generator Feedring Nozzle Through Wall Erosion, June 15, 1993 ("NRC MR 5-93-0042")Dec. 22, 2011RIV000010RK-TC-2NRC Information Notice 1997-084, "Rupture of Extraction Steam Piping," December 11, 1997 ("NRC IN 1997-084")Dec. 22, 2011 2Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3), Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit #Contentions Addressed by ExhibitExhibit NameExhibit Submission DateRIV000011RK-TC-2NRC Information Notice 2006-008, "Secondary Piping Rupture at Mihama Power Station in Japan," March 16, 2006 ("NRC IN 2006-008")Dec. 22, 2011RIV000012RK-TC-2EPRI, Recommendations for an Effective Flow-Accelerated Corrosion Program, NSAC-202L-R3 ("EPRI NSAC-202L-R3")Dec. 22, 2011RIV000013RK-TC-2Safety Evaluation by the Office of Nuclear Reactor Regulations Related to Amendment No. 229 to Facility Operating License No. DPR-28 Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc.  
("NRC Bulletin 87-01")Dec. 22, 2011RIV000008RK-TC-2NRC Information Notice 1991-019, "Steam Generator Feed Water Distribution Piping Damage," March 12, 1991 ("NRC IN 1991-019")Dec. 22, 2011RIV000009RK-TC-2Monitoring Report 5-93-0042, Steam Generator Feedring Nozzle Through Wall Erosion, June 15, 1993 ("NRC MR 5-93-0042")Dec. 22, 2011RIV000010RK-TC-2NRC Information Notice 1997-084, "Rupture of Extraction Steam Piping," December 11, 1997 ("NRC IN 1997-084")Dec. 22, 2011 2Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3), Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit #Contentions Addressed by ExhibitExhibit NameExhibit Submission DateRIV000011RK-TC-2NRC Information Notice 2006-008, "Secondary Piping Rupture at Mihama Power Station in Japan," March 16, 2006 ("NRC IN 2006-008")Dec. 22, 2011RIV000012RK-TC-2EPRI, Recommendations for an Effective Flow-Accelerated Corrosion Program, NSAC-202L-R3 ("EPRI NSAC-202L-R3")Dec. 22, 2011RIV000013RK-TC-2Safety Evaluation by the Office of Nuclear Reactor Regulations Related to Amendment No. 229 to Facility Operating License No. DPR-28 Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc.
(Vermont Power Station, Docket No. 50-571), at § 2.8.7.1, p. 190, ADAMS Accession No. ML060050028 ("VY Safety Eval")Dec. 22, 2011RIV000014RK-TC-2Aging Management Program Evaluation Report - Non-Class 1 Mechanical, IP-RPT-06-LRD07, Revision 5, March 18, 2009 ("AMP Eval Report Rev 5")Dec. 22, 2011RIV000015RK-TC-2EN-DC-315, Revision 3, Flow Accelerated Corrosion Program (March 1, 2010) ("Entergy FAC Program")Dec. 22, 2011RIV00016ARK-TC-2Graphs excerpted from CHECWORKS Reports ("CHECWORKS Wear Graphs Part 1")Dec. 22, 2011RIV00016BRK-TC-2Graphs excerpted from CHECWORKS Reports ("CHECWORKS Wear Graphs Part 2")Dec. 22, 2011 3Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3), Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit #Contentions Addressed by ExhibitExhibit NameExhibit Submission DateRIV000017RK-TC-2V.K. Chexal, W.H. Layman, & J.S. Horowitz, Tackling the Single-Phase Erosion Corrosion Issue, To Be Presented at the American Power Conference April 18-20, 1988, Chicago Illinois (EPRI) ("Chexal APC")Dec. 22, 2011RIV000018RK-TC-2CHECWORKS TM Steam/Feedwater Application, Guidelines for Plant Modeling and Evaluation of Component Inspection Data, 1009599, Final Report, September 2004, IPECPROP00000271, at p.6-7 (IPECPROP00000334) ("CHECWORKS Proprietary Report 1009599")Dec. 22, 2011RIV000019RK-TC-2Rudolf H. Hausler, Flow Assisted Corrosion (FAC) and Flow Induced Localized Corrosion: Comparison and Discussion, at 1, 8 (RHH Rebuttal, June 2, 2008, Vermont Yankee License Renewal Proceeding, 06-849-03-LR  
(Vermont Power Station, Docket No. 50-571), at § 2.8.7.1, p. 190, ADAMS Accession No. ML060050028 ("VY Safety Eval")Dec. 22, 2011RIV000014RK-TC-2Aging Management Program Evaluation Report - Non-Class 1 Mechanical, IP-RPT-06-LRD07, Revision 5, March 18, 2009 ("AMP Eval Report Rev 5")Dec. 22, 2011RIV000015RK-TC-2EN-DC-315, Revision 3, Flow Accelerated Corrosion Program (March 1, 2010) ("Entergy FAC Program")Dec. 22, 2011RIV00016ARK-TC-2Graphs excerpted from CHECWORKS Reports ("CHECWORKS Wear Graphs Part 1")Dec. 22, 2011RIV00016BRK-TC-2Graphs excerpted from CHECWORKS Reports ("CHECWORKS Wear Graphs Part 2")Dec. 22, 2011 3Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3), Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit #Contentions Addressed by ExhibitExhibit NameExhibit Submission DateRIV000017RK-TC-2V.K. Chexal, W.H. Layman, & J.S. Horowitz, Tackling the Single-Phase Erosion Corrosion Issue, To Be Presented at the American Power Conference April 18-20, 1988, Chicago Illinois (EPRI) ("Chexal APC")Dec. 22, 2011RIV000018RK-TC-2CHECWORKS TM Steam/Feedwater Application, Guidelines for Plant Modeling and Evaluation of Component Inspection Data, 1009599, Final Report, September 2004, IPECPROP00000271, at p.6-7 (IPECPROP00000334) ("CHECWORKS Proprietary Report 1009599")Dec. 22, 2011RIV000019RK-TC-2Rudolf H. Hausler, Flow Assisted Corrosion (FAC) and Flow Induced Localized Corrosion: Comparison and Discussion, at 1, 8 (RHH Rebuttal, June 2, 2008, Vermont Yankee License Renewal Proceeding, 06-849-03-LR
("Hausler VY Testimony")Dec. 22, 2011RIV000020RK-TC-2CSI, Technologies, Inc., Indian Point Unit 3 CHECWORKS SFA Model, Calculation No. 0705.100-01, Revision 2, August 2, 2011, at p.26 (excerpt re:
("Hausler VY Testimony")Dec. 22, 2011RIV000020RK-TC-2CSI, Technologies, Inc., Indian Point Unit 3 CHECWORKS SFA Model, Calculation No. 0705.100-01, Revision 2, August 2, 2011, at p.26 (excerpt re:
LCF) ("IP3 CHECWORKS SFA Model Aug 2011")Dec. 22, 2011RIV000021RK-TC-2CSI, Technologies, Inc., Indian Point Unit 3 CHECWORKS SFA Model, Calculation No. 0705.100-01, Revision 2, August 2, 2011, Appendix K -
LCF) ("IP3 CHECWORKS SFA Model Aug 2011")Dec. 22, 2011RIV000021RK-TC-2CSI, Technologies, Inc., Indian Point Unit 3 CHECWORKS SFA Model, Calculation No. 0705.100-01, Revision 2, August 2, 2011, Appendix K -

Revision as of 22:07, 29 April 2019

Riverkeeper Pre-Filed Evidentiary Hearing Exhibit RIVR40001-Revised Exhibit List (RKTC1B, 2 Rebuttal)
ML12181A372
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 06/29/2012
From:
Riverkeeper
To:
Atomic Safety and Licensing Board Panel
SECY RAS
Shared Package
ML12181A367 List:
References
RAS 22866, 50-247-LR, 50-286-LR, ASLBP 07-858-03-LR-BD01
Download: ML12181A372 (15)


Text

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit #Contentions Addressed by ExhibitExhibit NameExhibit Submission DateRIVR00001AllRiverkeeper Hearing Exhibit List ("RIV Exhibit List")Dec. 22, 2011RIV000002RK-TC-2Riverkeeper Initial Statement of Position Regarding Contention RK-TC Flow Accelerated Corrosion ("RK-TC-2 SOP")Dec. 22, 2011RIV000003RK-TC-2Pre-Filed Testimony of Joram Hopenfeld in Support of RK-TC-2 ("Hopenfeld Testimony RK-TC-2")Dec. 22, 2011RIV000004RK-TC-2; RK-TC-1B; RK-TC-5Curriculum Vitae of Joram Hopenfeld ("Hopenfeld CV")Dec. 22, 2011RIV000005RK-TC-2Report of Joram Hopenfeld in Support of RK-TC-2 ("Hopenfeld RK-TC-2 Report")Dec. 22, 2011RIV000006RK-TC-2NRC Information Notice No 86-106, "Feed Water Line Break," December 16, 1986 ("NRC IN 86-106")Dec. 22, 2011RIV000007RK-TC-2NRC Bulletin 87-01, "Thinning Pipe Walls in Nuclear Plants," July 9, 1987

("NRC Bulletin 87-01")Dec. 22, 2011RIV000008RK-TC-2NRC Information Notice 1991-019, "Steam Generator Feed Water Distribution Piping Damage," March 12, 1991 ("NRC IN 1991-019")Dec. 22, 2011RIV000009RK-TC-2Monitoring Report 5-93-0042, Steam Generator Feedring Nozzle Through Wall Erosion, June 15, 1993 ("NRC MR 5-93-0042")Dec. 22, 2011RIV000010RK-TC-2NRC Information Notice 1997-084, "Rupture of Extraction Steam Piping," December 11, 1997 ("NRC IN 1997-084")Dec. 22, 2011 2Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3), Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit #Contentions Addressed by ExhibitExhibit NameExhibit Submission DateRIV000011RK-TC-2NRC Information Notice 2006-008, "Secondary Piping Rupture at Mihama Power Station in Japan," March 16, 2006 ("NRC IN 2006-008")Dec. 22, 2011RIV000012RK-TC-2EPRI, Recommendations for an Effective Flow-Accelerated Corrosion Program, NSAC-202L-R3 ("EPRI NSAC-202L-R3")Dec. 22, 2011RIV000013RK-TC-2Safety Evaluation by the Office of Nuclear Reactor Regulations Related to Amendment No. 229 to Facility Operating License No. DPR-28 Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc.

(Vermont Power Station, Docket No. 50-571), at § 2.8.7.1, p. 190, ADAMS Accession No. ML060050028 ("VY Safety Eval")Dec. 22, 2011RIV000014RK-TC-2Aging Management Program Evaluation Report - Non-Class 1 Mechanical, IP-RPT-06-LRD07, Revision 5, March 18, 2009 ("AMP Eval Report Rev 5")Dec. 22, 2011RIV000015RK-TC-2EN-DC-315, Revision 3, Flow Accelerated Corrosion Program (March 1, 2010) ("Entergy FAC Program")Dec. 22, 2011RIV00016ARK-TC-2Graphs excerpted from CHECWORKS Reports ("CHECWORKS Wear Graphs Part 1")Dec. 22, 2011RIV00016BRK-TC-2Graphs excerpted from CHECWORKS Reports ("CHECWORKS Wear Graphs Part 2")Dec. 22, 2011 3Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3), Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit #Contentions Addressed by ExhibitExhibit NameExhibit Submission DateRIV000017RK-TC-2V.K. Chexal, W.H. Layman, & J.S. Horowitz, Tackling the Single-Phase Erosion Corrosion Issue, To Be Presented at the American Power Conference April 18-20, 1988, Chicago Illinois (EPRI) ("Chexal APC")Dec. 22, 2011RIV000018RK-TC-2CHECWORKS TM Steam/Feedwater Application, Guidelines for Plant Modeling and Evaluation of Component Inspection Data, 1009599, Final Report, September 2004, IPECPROP00000271, at p.6-7 (IPECPROP00000334) ("CHECWORKS Proprietary Report 1009599")Dec. 22, 2011RIV000019RK-TC-2Rudolf H. Hausler, Flow Assisted Corrosion (FAC) and Flow Induced Localized Corrosion: Comparison and Discussion, at 1, 8 (RHH Rebuttal, June 2, 2008, Vermont Yankee License Renewal Proceeding, 06-849-03-LR

("Hausler VY Testimony")Dec. 22, 2011RIV000020RK-TC-2CSI, Technologies, Inc., Indian Point Unit 3 CHECWORKS SFA Model, Calculation No. 0705.100-01, Revision 2, August 2, 2011, at p.26 (excerpt re:

LCF) ("IP3 CHECWORKS SFA Model Aug 2011")Dec. 22, 2011RIV000021RK-TC-2CSI, Technologies, Inc., Indian Point Unit 3 CHECWORKS SFA Model, Calculation No. 0705.100-01, Revision 2, August 2, 2011, Appendix K -

Components with Negative Time to Tcrit, IPEC00238096 ("CHECWORKS SFA Model Aug 2011 App K")Dec. 22, 2011 4Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3), Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit #Contentions Addressed by ExhibitExhibit NameExhibit Submission DateRIV000022RK-TC-2Statement by Dr. F. Peter Ford, transcript of January 26, 2005 meeting of the ACRS Subcommittee on Thermal Hydraulics (January 26, 2005), at 198, ADAMS Accession No. ML050400613 ("2005 ACRS Transcript")Dec. 22, 2011RIV000023RK-TC-2NUREG/CR-6936, PNNL 16186,Probabilities of Failure and Uncertainty Estimate Information for Passive Components - a Literature Review (May 2007) ("NUREG/CR-6936")Dec. 22, 2011RIV000024RK-TC-2Entergy Engineering Report, Operating Experience Review Report, IP-RPT LRD05, Rev. 3 (2008), IPEC00186046 ("Entergy Op Ex Rev Report")Dec. 22, 2011RIV000025RK-TC-2Daily DER Report, DER-01-01522, April 25, 2001, IPEC00020501 ("DER Report")Dec. 22, 2011RIV000026RK-TC-2Entergy Operations, Inc, Condition Report List, IPEC00185743 ("Condition Report List 1")Dec. 22, 2011RIV000027RK-TC-2Entergy Operations, Inc., Condition Report List, IPEC00092551 ("Condition Report List 2")Dec. 22, 2011RIV000028RK-TC-2Entergy Condition Report CR-IP2-2001-10525, IPEC00092616 ("Entergy CR-IP2-2001-10525")Dec. 22, 2011RIV000029RK-TC-2Entergy Condition Report CR-IP3-2006-02270, IPEC00025699 ("Entergy CR-IP3-2006-02270")Dec. 22, 2011 5Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3), Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit #Contentions Addressed by ExhibitExhibit NameExhibit Submission DateRIV000030RK-TC-2Transcript of Meeting of Advisory Committee on Reactor Safeguards (Sept. 10, 2009), ADAMS Accession No. ML092670114, at 90-96 ("ACRS Mtg Transcript Sept 2009")Dec. 22, 2011RIV000031RK-TC-2Lynn R. Sykes, John G. Armbruster, Won-Young Kim, & Leonardo Seeber, Observations and Tectonic Setting of Historic and Instrumentally Located Earthquakes in the Greater New York City-Philadelphia Area, Bulletin of the Seismological Society of America, Vol. 98, No. 4, pp. 1696-1719, August 2008 ("Sykes Study")Dec. 22, 2011RIV000032RK-TC-2Generic Issue 199 (GI-199), Implications of Updated Probabilistic Seismic Hazard Estimates in Central and Eastern United States on Existing Plants Safety/Risk Assessment, August 2010, at Appendix D ("Seismic Sore-Damage Frequencies) ("NRC GI-199")Dec. 22, 2011RIV000033RK-TC-2Bill Dedman, What are the odds? US nuke plants ranked by quake risk, March 17, 2011 ("Dedman Article")Dec. 22, 2011RIV000034RK-TC-1BDr.Hopenfeld Pre-filed Testimony Dec. 22, 2011RIV000035RK-TC-1B; RK-TC-5Dr. Hopenfeld ReportDec. 22, 2011RIV000036RK-TC-1B; RK-TC-5Westinghouse "EnvFat User's Manual Version 1" IPECPROP00056785Dec. 22, 2011RIV000037RK-TC-1B; RK-TC-5Official Transcript, ACRS Subcommittee, 12/6/2006Dec. 22, 2011RIV000038RK-TC-1B; RK-TC-5NRC IN 2011-04Dec. 22, 2011RIV000039RK-TC-1B; RK-TC-5Entergy Nuclear Vt. Yankee, Affidavit of Kenneth C. Chang, 5/12/08Dec. 22, 2011 6Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3), Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit #Contentions Addressed by ExhibitExhibit NameExhibit Submission DateRIV000040RK-TC-1B; RK-TC-5Taylor, EPRI R & D Status Report, Jan/Feb 1983Dec. 22, 2011RIV000041RK-TC-1B; RK-TC-5Entergy, Table of Environmental Correction Actions for Metal Fatigue, 11/6/07Dec. 22, 2011RIV000042RK-TC-1B; RK-TC-5DC Cook Charging Nozzle LR Fatigue Evaluations, IPECPROP00061294Dec. 22, 2011RIV000043RK-TC-1B; RK-TC-5Diablo Canyon Unit 1 Insurge/Outsurge Eval, IPECPROP00061179Dec. 22, 2011RIV000044RK-TC-1B; RK-TC-5NRC Bulletin 88-08Dec. 22, 2011RIV000045RK-TC-1B; RK-TC-5NRC Bulletin 88-08 Supp. 1Dec. 22, 2011RIV000046RK-TC-1B; RK-TC-5NRC Bulletin 88-08 Supp. 2Dec. 22, 2011RIV000047RK-TC-1B; RK-TC-5NRC IN 97-46Dec. 22, 2011RIV000048RK-TC-1B; RK-TC-5Final Report of the NESC-Thermal Fatigue Project, EUR22763Dec. 22, 2011RIV000049RK-TC-1B; RK-TC-5Entergy Indian Point U3, FAC, 3RF13 Outage, 2005Dec. 22, 2011RIV000050RK-TC-1B; RK-TC-5Westinghouse, WCAP-14950, IPECPROP00059247Dec. 22, 2011RIV000051RK-TC-1B; RK-TC-5Kwang Chu Kim, Journal of Mechanical Science/Technology, 2008Dec. 22, 2011RIV000052A-DRK-TC-1B; RK-TC-5Combustion Engineering, Inc., CENC-1110Dec. 22, 2011RIV000053RK-TC-1B; RK-TC-5Combustion Engineering, Inc., CENC-1122Dec. 22, 2011RIV000054RK-TC-1B; RK-TC-5 letter from P. Bessette to D. Brancato, 10/18/11Dec. 22, 2011RIV000055RK-TC-1B; RK-TC-5Westinghouse CN-PAFM-09-64, IPECPROP00058077Dec. 22, 2011RIV000056RK-TC-1B; RK-TC-5Systems Standard Design Criteria, IPECPROP00059698Dec. 22, 2011 7Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3), Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit #Contentions Addressed by ExhibitExhibit NameExhibit Submission DateRIV000057RK-TC-1B; RK-TC-5RAI Indian Point U2 and U3 LRA, 2/10/11Dec. 22, 2011RIV000058RK-TC-1B; RK-TC-5Response to RAI, Indian Point U2 and U3, 3/28/11Dec. 22, 2011RIV000059RK-EC-3/CW-EC-1Riverkeeper and Clearwater Initial Statement of Position Regarding Consolidated Contention RK-EC-3/CW-EC-1 (Spent Fuel Pool Leaks) ("RK-EC-3-CW-EC-1 SOP")Dec. 22, 2011RIV000060RK-EC-3/CW-EC-1Testimony of Arnold Gundersen on Consolidated Contention RK-EC-3/CW-EC Spent Fuel Pool Leaks ("Gundersen Testimony")Dec. 22, 2011RIV000061RK-EC-3/CW-EC-1Testimony of Gillian Stewart on Consolidated Contention RK-EC-3/CW-EC Spent Fuel Pool Leaks ("Stewart Testimony")Dec. 22, 2011RIV000062RK-EC-3/CW-EC-1Curriculum Vitae of Arnold Gundersen ("Gundersen CV")Dec. 22, 2011RIV000063RK-EC-3/CW-EC-1Curriculum Vitae of Gillian Stewart ("Stewart CV")Dec. 22, 2011RIV000064RK-EC-3/CW-EC-1NUREG-1437, Revision 1, Generic Environmental Impact Statement for License Renewal of Nuclear Plants (July 2009) Draft Report for Comment ("GEIS Update")Dec. 22, 2011RIV000065RK-EC-3/CW-EC-1U.S. EPA, Radionuclides in Drinking Water: A Small Entity Compliance Guide (February 2002)Dec. 22, 2011RIV000066RK-EC-3/CW-EC-1GZA, GeoEnvironmental, Inc., Hydrogeologic Site Investigation Report, Indian Point Energy Center, January 7, 2008, IPEC00195418Dec. 22, 2011 8Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3), Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit #Contentions Addressed by ExhibitExhibit NameExhibit Submission DateRIV000067RK-EC-3/CW-EC-1Indian Point Nuclear Generating Units 1 & 2 - NRC Inspection Report Nos. 05000003/2007010 and 05000247/2007010, EA-08-088, May 13, 2008Dec. 22, 2011RIV000068RK-EC-3/CW-EC-1Entergy, Groundwater Investigation Executive Summary, Indian Point Energy Center, Buchanan, NY (January 2008)Dec. 22, 2011RIV000069RK-EC-3/CW-EC-1Indian Point Nuclear Generating Unit 2 - NRC Special Inspection Report No. 05000247/2005011, March 16, 2006Dec. 22, 2011RIV000070RK-EC-3/CW-EC-1Indian Point Energy Center Status Report (Sept. 6, 2007)Dec. 22, 2011RIV000071RK-EC-3/CW-EC-1In the Matter of Entergy Nuclear Indian Point 2, LLC, and Entergy Nuclear Indian Point 3, LLC, and Entergy Nuclear Operations Inc's Joint Application for CWA § 401 Water Quality Certification, Prefiled Testimony of Matthew J.

Barvenik, Issue for Adjudication No. 3 - Radiological Materials (July 22, 2011)Dec. 22, 2011RIV000072RK-EC-3/CW-EC-1E-mail from Michael Rutkoske to Steven Verrochi (Entergy), Re: SFP Exams -

What's Next? (Nov. 19, 2005), IPEC00065830Dec. 22, 2011RIV000073RK-EC-3/CW-EC-1Entergy, U2 SFP Leak Monitoring Wells and Underground Piping (3/31/06),

IPEC00063518Dec. 22, 2011RIV000074RK-EC-3/CW-EC-1Entergy, Problem Development Sheet - Groundwater, IPEC00207416Dec. 22, 2011 9Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3), Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit #Contentions Addressed by ExhibitExhibit NameExhibit Submission DateRIV000075RK-EC-3/CW-EC-1E-mail from Ronald Sachatello to Donald Mayer (Entergy), Joseph Adler (TLG), Gary Hinrichs (Entergy), Re: IS THE POOL LEAK OFF COLLECTION BOX EFFECTIVE?, IPEC00063351Dec. 22, 2011RIV000076RK-EC-3/CW-EC-1GZA, GeoEnvironmental, Inc. Final IPEC Quarterly Long-Term Groundwater Monitoring Report, Quarter Two 2010 (Report No. 10) (February 15, 2011),

IPEC00227561Dec. 22, 2011RIV000077RK-EC-3/CW-EC-1Entergy Chart of Leak Locations, I PEC00059360Dec. 22, 2011RIV000078RK-EC-3/CW-EC-1IPEC Site Management Manual, IP-SMM, CY-110, Rev. 1, 8.6 RGWMP Quarterly Integrated Review Checklist (Quarter 1, 2009), IPEC00225217Dec. 22, 2011RIV000079RK-EC-3/CW-EC-1Annie Correal, Indian Pt. Broken Pipe Spurs Safety Worries, THE NEW YORK TIMES (March 1, 2009)Dec. 22, 2011RIV000080RK-EC-3/CW-EC-1IPEC Site Management Manual, IP-SMM, CY-110, Rev. 3, 8.6 RGWMP Quarterly Integrated Review Checklist (Quarter 1, 2010), IPEC00225219Dec. 22, 2011RIV000081RK-EC-3/CW-EC-1IPEC Site Management Manual, IP-SMM, CY-110, Rev. 1, 8.6 RGWMP Quarterly Integrated Review Checklist (Quarter 2, 2010), IPEC00225223Dec. 22, 2011RIV000082RK-EC-3/CW-EC-1Entergy, Nuclear Management Manual, EN-MA-125, Rev. 4, Attachment 9.1, Initial Investigation, Troubleshooting Plan for H-3 Investigation, Storm Drain System A, March/April 2009, IPEC00194517Dec. 22, 2011 10Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3), Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit #Contentions Addressed by ExhibitExhibit NameExhibit Submission DateRIV000083RK-EC-3/CW-EC-1IPEC Site Management Manual, IP-SMM, CY-110, Rev. 3, 8.6 RGWMP Quarterly Integrated Review Checklist (Quarter 4, 2010), IPEC00233519Dec. 22, 2011RIV000084RK-EC-3/CW-EC-1IPEC Site Management Manual, IP-SMM, CY-110, Rev. 4, 10.7 RGWMP Quarterly Integrated Review Checklist (Quarter 1, 2011), IPEC00233515Dec. 22, 2011RIV000085RK-EC-3/CW-EC-1Indian Point Nuclear Generating Unit 3 - NRC Integrated Inspection Report 05000286/2011004 (November 7, 2011)Dec. 22, 2011RIV000086RK-EC-3/CW-EC-1Entergy correspondence, e-mails regarding approach to groundwater contamination, IPEC00067228, IPEC00065510, IPEC00130549, IPEC00062936Dec. 22, 2011RIV000087RK-EC-3/CW-EC-1Potential Sources of Tritium at IPEC & Inspection Method, IPEC00065506Dec. 22, 2011RIV000088RK-EC-3/CW-EC-1Supplemental Report of the Public Oversight Panel Regarding the Comprehensive Reliability Assessment of the Vermont Yankee Nuclear Power Plant, July 20, 2010Dec. 22, 2011RIV000089RK-EC-3/CW-EC-1GAO Report to Congressional Requesters, Nuclear Regulatory Commission, Oversight of Underground Piping Systems Commensurate with Risk, but Proactive Measures Could Help Address Future Leaks, GAO-11-563 (June

2011)Dec. 22, 2011 11Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3), Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit #Contentions Addressed by ExhibitExhibit NameExhibit Submission DateRIV000090RK-EC-3/CW-EC-1Entergy Groundwater Well Data, Quarter 2, 2011, IPEC00225100Dec. 22, 2011RIV000091RK-EC-3/CW-EC-1Liquid Radioactive Release Lessons Learned Task Force Final Report, U.S. NRC (September 1, 2006)Dec. 22, 2011RIV000092RK-EC-3/CW-EC-1Coastal Fish & Wildlife Habitat Rating Form, Haverstraw BayDec. 22, 2011RIV000093RK-EC-3/CW-EC-1National Research Council, Health Risks from Exposure to Low Levels of Ionizing Radiation: BEIR VII - Phase 2 (2006)Dec. 22, 2011RIV000094RK-EC-3/CW-EC-1Entergy E-mail from David Winslow (GZA) to Donald Mayer (Entergy), G. Hinrichs (Entergy), Re: Remedial Report (May 19, 2006), IPEC00064221Dec. 22, 2011RIV000095RK-EC-3/CW-EC-1Groundwater Investigation '06 Quarter 4 Activities and Results, IPEC00063899Dec. 22, 2011RIV000096RK-EC-3/CW-EC-1Entergy E-mail from Kathleen McMullin (Entergy) to various, Re: IPEC Status Report for Dec. 21Dec. 22, 2011RIV000097RK-EC-3/CW-EC-1Entergy Document, "Unit 1 Status for ENC Presentation notes," "Groundwater Status," IPEC00062939Dec. 22, 2011RIV000098RK-EC-3/CW-EC-1Letter from Kathryn Sutton (Counsel for Entergy) to Deborah Brancato (Riverkeeper), Re: Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3), Docket Nos. 50-247-LR and 50-286-LR (June 24, 2011)Dec. 22, 2011 12Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3), Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit #Contentions Addressed by ExhibitExhibit NameExhibit Submission DateRIV000099RK-EC-3/CW-EC-1In the Matter of Entergy Nuclear Indian Point 2, LLC, and Entergy Nuclear Indian Point 3, LLC, and Entergy Nuclear Operations Inc's Joint Application for CWA § 401 Water Quality Certification, Combined Prefiled Rebuttal Testimony of Thomas C. Esselman, Ph.D., Matthew J. Barvenik, and Owen Hoffman, Ph.D., Radiological - Issue for Adjudication No. 3 (October 4, 2011)Dec. 22, 2011RIV000100RK-EC-3/CW-EC-1E-mail From Dara Gray (Entergy) to J. Noggle (NRC) (Jan. 24, 2007), Re:

Historical Sr Data (Exhibit RIV000100)Dec. 22, 2011RIV000101RK-EC-3/CW-EC-1Haverstraw Water Supply Project DEIS, Draft EIS Chapter 2Dec. 22, 2011RIV000102RK-TC-5Pre-Filed Testimony of Joram Hopenfeld in Support of RK-TC-5June 19, 2012RIV000103RK-TC-5; RK-TC-1BHopenfeld, Small Sodium-to-Gas Leak Behavior in Relation to LMFBR Leak Detection System Design (International Conference on Liquid Metal Technology, May 3-6, 1976)June 19, 2012RIV000104RK-TC-5; RK-TC-1BMemorandum from S. Collins (NRR) to W. Travers (EDO), Re: Steam Generator Action Plan Revision to Address Differing Professional Opinion on Steam Generator Tube Integrity (WITS ITEM 200100026), May 11, 2011June 19, 2012 13Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3), Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit #Contentions Addressed by ExhibitExhibit NameExhibit Submission DateRIV000105RK-TC-5; RK-TC-1BNUREG-1740, Voltage-Based Alternative Repair Criteria, A Report to the Advisory Committee on Reactor Safeguards by the Ad Hoc Subcommittee on a Differing Professional Opinion (March/Feb. 2001)June 19, 2012RIV000106RK-TC-5; RK-TC-1BAssociated Press, Nuke inspectors focus on 'unusual' wear on tubes, Fox News.com, February 3, 2012June 19, 2012RIV000107RK-TC-2Riverkeeper Revised Statement of Position Regarding Contention RK-TC-2 (Flow Accelerated Corrosion)June 29, 2012RIV000108RK-TC-2Prefiled Rebuttal Testimony of Dr. Joram Hopenfeld Regarding Riverkeeper Contention TC Flow Accelerated CorrosionJune 29, 2012RIV000109RK-TC-2Official Transcript of Proceedings, Nuclear Regulatory Commission, Entergy Nuclear Vermont Yankee, 50-271-LR; ASLBP No. 06-849-03-LR, Newfane, Vermont, pages 1451-1741 (July 24, 2008), at 1477 (excerpt)June 29, 2012RIV000110RK-TC-2Stéphane Trevin & Marie-Pierre Moutrille, Optimization of EDF's NPPs Maintenance due to Flow Accelerated Corrosion and BRT-CICEROTM Improvement by NDT Results Analysis (18th World Conference on Nondestructive Testing, 16-20 April 2012, Durban, South Africa)June 29, 2012 14Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit #Contentions Addressed by ExhibitExhibit NameExhibit Submission DateRIV000111RK-TC-2Hopenfeld, Demonstration of Flawed Presentation of CHECWORKS Data June 29, 2012RIV000112RK-TC-2Graphs from CHECWORKS Reports (Excerpts)June 29, 2012RIV000113RK-TC-2In the Matter of Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc. (Vermont Yankee Nuclear Power Station), Docket No. 50-271 -LR, ASLBP No. 06-849-03-LR, Testimony of Jeffrey S. Horowitz and James C. Fitzpatrick on NEC Contention 4 - Flow-Accelerated Corrosion (May 12, 2008), at 12-13 (excerpt)June 29, 2012RIV000114RK-TC-1BPrefiled Rebuttal Testimony of Dr. Joram Hopenfeld Regarding Contention NYS-26B/TC-1B - Metal FatigueJune 29, 2012RIV000115RK-TC-1BNRC Bulletin No. 88-11: Pressurizer Surge Line Thermal Stratification (December 20, 1988) June 29, 2012RIV000116RK-TC-1BAudit of NRC's License Renewal Program, OIG-07-A-15, September 6, 2007June 29, 2012RIV000117RK-TC-1BMakoto Higuchi, Takao Nakamura, & Yasuaki Sugie, Development of an Environmental Fatigue Evaluation Method for Nuclear Power Plants in JSME Code* , J. of Environment and Engineering Vol. 6, No. 2, 2011June 29, 2012 15Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit #Contentions Addressed by ExhibitExhibit NameExhibit Submission DateRIV000118RK-TC-1BG. T. Yahr and R. C. Gwaltney (Oak Ridge National Laboratory), Ao K. Richardson and W. L. Server (EG&G Idaho, Inc), Case Study of the Propagation of a Small Flaw Under PWR Loading Conditions and Comparison with the ASME Code Design Life, Comparison of the ASME Code Section III and XI , CONF-860722-12, TI86 005150June 29, 2012RIV000119RK-TC-1BInternational Atomic Energy Agency, Applicability of the leak before break concept, Report of the IAEA Extrabudgetary Programme on the Safety of WWER-440 Model 230 Nuclear Power Plants, Status report on a generic safety issue, IAEA-TECDOC-710, ISSN 1011-4289 (June 1993)June 29, 2012