ML18054B332: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 24: Line 24:
* PDR ADOCK 05000255 * ' P: PNU ADMINISTRATIVE CONTROLS 6.5.1.4 6.5.1.5 6.5.1.6 MEETING FREQUENCY The PRC shall meet at least once per calendar month with special meetings as required.
* PDR ADOCK 05000255 * ' P: PNU ADMINISTRATIVE CONTROLS 6.5.1.4 6.5.1.5 6.5.1.6 MEETING FREQUENCY The PRC shall meet at least once per calendar month with special meetings as required.
QUORUM A quorum of the PRC shall consist of the Chairman and four members (including alternates).
QUORUM A quorum of the PRC shall consist of the Chairman and four members (including alternates).
RESPONSIBILITIES The PRC shall be responsible for nuclear safety review of: a. All procedures and programs specified by Specification 6.8 and changes thereto, and any other procedures or changes thereto as determined by the Plant General Manager to affect nuclear safety; all proposed tests or experiments that affect nuclear safety; all proposed changes or modifications to plant systems or equipment that affect nuclear safety; and the Site Emergency Plan. b. All proposed changes to Operating License and Technical Specifications.  
RESPONSIBILITIES The PRC shall be responsible for nuclear safety review of: a. All procedures and programs specified by Specification 6.8 and changes thereto, and any other procedures or changes thereto as determined by the Plant General Manager to affect nuclear safety; all proposed tests or experiments that affect nuclear safety; all proposed changes or modifications to plant systems or equipment that affect nuclear safety; and the Site Emergency Plan. b. All proposed changes to Operating License and Technical Specifications.
: c. Results of investigations of all violations of the Technical Specifications. (A report shall be prepared covering evaluation and recommendations to prevent recurrence and be forwarded to the Vice President  
: c. Results of investigations of all violations of the Technical Specifications. (A report shall be prepared covering evaluation and recommendations to prevent recurrence and be forwarded to the Vice President  
-NOD and Nuclear Safety Service Department (NSSD).) d. Plant operations to detect potential safety hazards. e. Reports of special reviews and investigations as requested by the Plant General Manager or NSSD. f. All reportable events as defined in Section 1.4. g. All items identified under 6.5.3.4 as significant to nuclear safety. h. Monthly reports from Plant Safety and Licensing.  
-NOD and Nuclear Safety Service Department (NSSD).) d. Plant operations to detect potential safety hazards. e. Reports of special reviews and investigations as requested by the Plant General Manager or NSSD. f. All reportable events as defined in Section 1.4. g. All items identified under 6.5.3.4 as significant to nuclear safety. h. Monthly reports from Plant Safety and Licensing.
: i. All exceptions taken to Specification 3.0.4 to assure they are not an unreviewed question nor do they create a safety hazard. PRC review of the above items may be performed by routing, subject to the requirements of Specification 6.5.1.7. PRC may delegate review of item a. to Plant Safety and Licensing as described in Specification 6.5.3 6-5a Amendment No.
: i. All exceptions taken to Specification 3.0.4 to assure they are not an unreviewed question nor do they create a safety hazard. PRC review of the above items may be performed by routing, subject to the requirements of Specification 6.5.1.7. PRC may delegate review of item a. to Plant Safety and Licensing as described in Specification 6.5.3 6-5a Amendment No.
117, TSP1289-0001-NL04 I I I TSP1289-0001-NL04 ATTACHMENT 2 Consumers Power Company Palisades Plant Docket 50-255 MARKED UP TECHNICAL SPECIFICATION PAGE December 18, 1989 1 Page *   
117, TSP1289-0001-NL04 I I I TSP1289-0001-NL04 ATTACHMENT 2 Consumers Power Company Palisades Plant Docket 50-255 MARKED UP TECHNICAL SPECIFICATION PAGE December 18, 1989 1 Page *   
Line 33: Line 33:
*QUORUM A quorum of the PRC shall consist of the Chairman:
*QUORUM A quorum of the PRC shall consist of the Chairman:
and four members (including alternates).
and four members (including alternates).
RESPONSIBILITIES The. PRC shall be responsible for nuclear safety review of: . . a. All procedures and programs specified by Specification 6.8 and changes thereto, and any other procedures .or changes thereto as determined by the Plant General Manager to affect nuclear safety; all proposed tests or experiments that affect nuclear safety; all proposed changes or modifications to plant systems or equipment that affect nuclear safety; and the.Site Emergency Plan. b. All'proposed changes to Operating License and Technical Specif !cations.*  
RESPONSIBILITIES The. PRC shall be responsible for nuclear safety review of: . . a. All procedures and programs specified by Specification 6.8 and changes thereto, and any other procedures .or changes thereto as determined by the Plant General Manager to affect nuclear safety; all proposed tests or experiments that affect nuclear safety; all proposed changes or modifications to plant systems or equipment that affect nuclear safety; and the.Site Emergency Plan. b. All'proposed changes to Operating License and Technical Specif !cations.*
: c. Results of investigations of all violations of the Technical Specifications.  
: c. Results of investigations of all violations of the Technical Specifications.  
* (A report sha.11 be prepared covering evaluation and recommendations to *prevent recurrence and be forwarded to the Vice President  
* (A report sha.11 be prepared covering evaluation and recommendations to *prevent recurrence and be forwarded to the Vice President  

Revision as of 21:46, 25 April 2019

Proposed Tech Spec Page 6-5a,changing Tech Spec 6.5.1.6, Responsibilities.
ML18054B332
Person / Time
Site: Palisades Entergy icon.png
Issue date: 12/18/1989
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML18054B326 List:
References
NUDOCS 9001020105
Download: ML18054B332 (4)


Text

'-**

ATTACHMENT 1 Consumers Power Company Palisades Plant Docket 50-255 PROPOSED TECHNICAL SPECIFICATION PAGE CHANGE December 18, 1989 1 Page .

____ ( 9001020105 891218

  • PDR ADOCK 05000255 * ' P: PNU ADMINISTRATIVE CONTROLS 6.5.1.4 6.5.1.5 6.5.1.6 MEETING FREQUENCY The PRC shall meet at least once per calendar month with special meetings as required.

QUORUM A quorum of the PRC shall consist of the Chairman and four members (including alternates).

RESPONSIBILITIES The PRC shall be responsible for nuclear safety review of: a. All procedures and programs specified by Specification 6.8 and changes thereto, and any other procedures or changes thereto as determined by the Plant General Manager to affect nuclear safety; all proposed tests or experiments that affect nuclear safety; all proposed changes or modifications to plant systems or equipment that affect nuclear safety; and the Site Emergency Plan. b. All proposed changes to Operating License and Technical Specifications.

c. Results of investigations of all violations of the Technical Specifications. (A report shall be prepared covering evaluation and recommendations to prevent recurrence and be forwarded to the Vice President

-NOD and Nuclear Safety Service Department (NSSD).) d. Plant operations to detect potential safety hazards. e. Reports of special reviews and investigations as requested by the Plant General Manager or NSSD. f. All reportable events as defined in Section 1.4. g. All items identified under 6.5.3.4 as significant to nuclear safety. h. Monthly reports from Plant Safety and Licensing.

i. All exceptions taken to Specification 3.0.4 to assure they are not an unreviewed question nor do they create a safety hazard. PRC review of the above items may be performed by routing, subject to the requirements of Specification 6.5.1.7. PRC may delegate review of item a. to Plant Safety and Licensing as described in Specification 6.5.3 6-5a Amendment No.

117, TSP1289-0001-NL04 I I I TSP1289-0001-NL04 ATTACHMENT 2 Consumers Power Company Palisades Plant Docket 50-255 MARKED UP TECHNICAL SPECIFICATION PAGE December 18, 1989 1 Page *

. -ADMINISTRATIVE CONTRO,

  • 6.5.l.4 6.5.l.5 6.5.l.6 MEETING. FREQUENCY The* PRC shall meet at least once per calendar month with special. meetings as required.
  • QUORUM A quorum of the PRC shall consist of the Chairman:

and four members (including alternates).

RESPONSIBILITIES The. PRC shall be responsible for nuclear safety review of: . . a. All procedures and programs specified by Specification 6.8 and changes thereto, and any other procedures .or changes thereto as determined by the Plant General Manager to affect nuclear safety; all proposed tests or experiments that affect nuclear safety; all proposed changes or modifications to plant systems or equipment that affect nuclear safety; and the.Site Emergency Plan. b. All'proposed changes to Operating License and Technical Specif !cations.*

c. Results of investigations of all violations of the Technical Specifications.
  • (A report sha.11 be prepared covering evaluation and recommendations to *prevent recurrence and be forwarded to the Vice President

-NOD and Nuclear Safety Service Department (NSSD).) d. Plant operations to detect potential safety hazards. e. Reports of special reviews and investigations as requested by the Plant General Manager or NSSD. f. All reportable events as defined in Section 1.4. g. All items identified under Specification as significant to nuclear safety. h. Monthly reports from Plant Safety and Licensing.

PRC review of the items may be performed by routing,.*

subject to the requirements of Specification PRC may delegate review of item a. to Plant Safety and Licensing as described in Specification 6.5.3 t"IO I' 1. A II exc.ep-\.1ofl5

+o o.re. fie.\

Q; ":>U.(dy

!.-Ct.fd.

--*k-** ___;_* ------------*

6..:.5a Alnendment No. t0S, /f/;. TSP0189-0001-NL04