|
---|
Category:Letter
MONTHYEARML24295A1202024-10-21021 October 2024 Relief Request ANO2-RR-24-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 71 ML24185A2602024-10-0404 October 2024 Issuance of Amendment No. 335 to Revise Typographical Errors in Technical Specifications IR 05000368/20253012024-09-0909 September 2024 Notification of NRC Initial Operator Licensing Examination 05000368/2025301 ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification IR 05000313/20240112024-09-0505 September 2024 Comprehensive Engineering Team Inspection Report 05000313/2024011 and 05000368/2024011 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000313/20240052024-08-21021 August 2024 Updated Inspection Plan for Arkansas Nuclear One – Units 1 and 2 (Report 05000313/2024005, 05000368/2024005) ML24198A0722024-08-21021 August 2024 Correction to Issuance of Amendment No. 333 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 IR 05000313/20240022024-08-0606 August 2024 Integrated Inspection Report 05000313/2024002 and 05000368/2024002 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification 05000313/LER-2024-001, Source Range Nuclear Instrument Failure Resulting in Condition Prohibited by Technical Specifications2024-07-0101 July 2024 Source Range Nuclear Instrument Failure Resulting in Condition Prohibited by Technical Specifications ML24101A1792024-06-25025 June 2024 Issuance of Amendment No. 333 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24143A0632024-05-22022 May 2024 Notification of Inspection (NRC Inspection Report 05000368/2024003) and Request for Information IR 05000313/20240012024-05-0808 May 2024 Integrated Inspection Report 05000313/2024001 and 05000368/2024001 ML24128A2472024-05-0808 May 2024 Project Manager Assignment ML24017A2982024-04-18018 April 2024 Summary of Regulatory Audit Regarding the License Amendment Request to Revise Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b ML24107A0282024-04-17017 April 2024 Notification of Comprehensive Engineering Team Inspection (05000313/2024011 and 05000368/2024011) and Request for Information ML24086A5412024-04-10010 April 2024 Authorization of Request for Alternative ANO1-ISI-037 Regarding Extension of Reactor Vessel Inservice Inspection Interval IR 05000313/20244022024-04-0808 April 2024 Security Baseline Inspection Report 05000313/2024402 and 05000368/2024402 (Full Report) IR 05000313/20244042024-04-0808 April 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection (05000313/2024404 and 05000368/2024404) ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML24031A6442024-03-14014 March 2024 Issuance of Amendment No. 282 to Modify Technical Specification 3.3.1, Reactor Pressure System (RPS) Instrumentation, Turbine Trip Function on Low Control Oil Pressure ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24102A1342024-03-12012 March 2024 AN1-2024-03 Post Exam Submittal IR 05000313/20230062024-02-28028 February 2024 Annual Assessment Letter for Arkansas Nuclear One- Units 1 and 2 Report 05000313/2023006 and 05000368/2023006 IR 05000313/20230042024-02-0808 February 2024 Integrated Inspection Report 05000313/2023004 and 05000368/2023004 and Independent Spent Fuel Storage Installation Inspection Report 07200013/2023002 ML24012A0502024-02-0202 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0054 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23326A0392024-01-24024 January 2024 Issuance of Amendment No. 281 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24017A1582024-01-17017 January 2024 Submittal of Emergency Plan Revision 50 IR 05000313/20234202024-01-10010 January 2024 Security Baseline Inspection Report 05000313/2023420 and 05000368/2023420 IR 05000313/20234022024-01-0202 January 2024 Security Baseline Inspection Report 05000313/2023402 and 05000368/2023402 ML23354A0022023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment IR 05000313/20234052023-12-12012 December 2023 – Security Baseline Inspection Report 05000313/2023405 and 05000368/2023405 ML23341A0832023-12-11011 December 2023 – Material Control and Accounting Program Inspection Report 05000313/368/2023404- Cover Letter ML23305A0922023-12-0707 December 2023 – Summary of Regulatory Audit Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23275A2072023-11-28028 November 2023 Issuance of Amendment No. 280 Removal of Technical Specification Condition Allowing Two Reactor Coolant Pump Operation ML23325A1412023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000313/20230032023-11-21021 November 2023 Revised - ANO Revised Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/ 2023001 ML23324A0172023-11-16016 November 2023 Submittal of Amendment 31 to Safety Analysis Report ML23313A0962023-11-13013 November 2023 Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/2023001 ML23243B0452023-11-13013 November 2023 Request for Withholding Information from Public Disclosure ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV 2024-09-09
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24185A2602024-10-0404 October 2024 Issuance of Amendment No. 335 to Revise Typographical Errors in Technical Specifications ML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 ML24101A1792024-06-25025 June 2024 Issuance of Amendment No. 333 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24031A6442024-03-14014 March 2024 Issuance of Amendment No. 282 to Modify Technical Specification 3.3.1, Reactor Pressure System (RPS) Instrumentation, Turbine Trip Function on Low Control Oil Pressure ML23326A0392024-01-24024 January 2024 Issuance of Amendment No. 281 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23275A2072023-11-28028 November 2023 Issuance of Amendment No. 280 Removal of Technical Specification Condition Allowing Two Reactor Coolant Pump Operation ML23020A9362023-01-27027 January 2023 Audit Plan to Support Review of License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation ML22263A1912022-12-0909 December 2022 Issuance of Amendment No. 278 Revision to Technical Specifications 3.4.12 and 3.4.13 Based on Revised Dose Calculations (EPID L-2021-LLA-0181) - Non-Proprietary ML22291A2392022-10-28028 October 2022 Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed Nshcd, and Opportunity for a Hearing and Order Imposing Procedures for Document Access to SUNSI (EPID L-2021-LLA-0181) Letter ML22165A2442022-07-19019 July 2022 Issuance of Amendment No. 331 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML22138A4312022-06-23023 June 2022 Issuance of Amendment No. 277 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML22104A2222022-05-12012 May 2022 Issuance of Amendments Revise Technical Specifications to Adopt TSTF 554 ML22083A1242022-04-28028 April 2022 Arkansas, Units 1 and 2; Grand Gulf Nuclear Station; River Bend Station; and Waterford Steam Electric Station - Issuance of Amendments Revise Technical Specifications to Adopt TSTF-541, Revision 2 ML22039A2822022-03-15015 March 2022 Issuance of Amendment Nos. 274 and 328 One-Time Change to Support Proactive Upgrade of the Emergency Cooling Pond Supply Piping ML21225A0552021-12-17017 December 2021 Issuance of Amendment No. 327 Addition of Technical Specification Limiting Condition for Operation 3.0.6 and Adoption of Safety Function Determination Program ML21341B2262021-12-13013 December 2021 Acceptance of Requested Licensing Action License Amendment Request to Revise Technical Specifications 3.4.12 and 3.4.13 Based on Revised Dose Calculations ML21313A0082021-12-0808 December 2021 Issuance of Amendments to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML21320A2122021-11-17017 November 2021 Supplemental Information Needed for Acceptance of Requested Licensing Action License Amendment Request Concerning Revised Dose Calculations ML21281A2542021-10-15015 October 2021 Audit Meeting Agenda & Audit Questions for LAR to Adopt 10 CFR 50.69,Risk-Informed Categorization and Treatment of Structures, System, and Components for Nuclear Power Reactors (EPIDs L-2021-LLA-0105, L-2021-LLA-0106 ML21208A4492021-09-20020 September 2021 Issuance of Amendment No. 325 Revise Loss of Voltage Relay Allowable Values and Number of Degraded Voltage Channels ML21088A4332021-04-14014 April 2021 Issuance of Amendment No. 324 Adoption of Technical Specification Task Force Traveler, TSTF-569, Revision 2, Revise Response Time Testing Definition ML21027A4282021-03-23023 March 2021 Issuance of Amendment No. 272 Replacement of Reactor Building Spray Sodium Hydroxide Additive with a Passive Reactor Building Sump Buffering Agent ML21040A5132021-03-10010 March 2021 Issuance of Amendment No. 271 Revision to Loss of Voltage Relay Allowable Values ML20351A1532021-02-0808 February 2021 Issuance of Amendment No. 323 Technical Specification Deletions, Additions, and Relocations NUREG-1432, Issuance of Amendment No. 322 Technical Specification Changes Related to Revised Fuel Handling Accident Analysis and Adoption of Technical Specification Improvements Consistent with NUREG-14322020-10-30030 October 2020 Issuance of Amendment No. 322 Technical Specification Changes Related to Revised Fuel Handling Accident Analysis and Adoption of Technical Specification Improvements Consistent with NUREG-1432 ML20135H1412020-06-30030 June 2020 Issuance of Amendment Nos. 269 and 321 Request to Incorporate the Tornado Missile Risk Evaluator Into the Licensing Basis ML20160A1472020-06-30030 June 2020 Issuance of Amendment No. 270 to Adopt TSTF 563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML20087L8032020-04-0808 April 2020 Issuance of Amendment No. 320 to Revise Control Element Assembly Drop Times ML19231A2972020-01-29029 January 2020 Issuance of Amendment No. 318 Addition of Technical Specification Actions to Address Inoperability of the Containment Building Sump ML19269B6722019-10-22022 October 2019 Issuance of Amendment Nos. 267 and 317 to Extend Implementation Dates for Amendment Nos. 263 and 314, Revision to Emergency Action Level Scheme ML19220A9382019-09-27027 September 2019 Issuance of Amendment No. 266 Adoption of Technical Specifications Task Force Traveler TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML19098A9552019-05-22022 May 2019 Issuance of Amendment No. 264 Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-425, Revision 3 ML19127A2992019-05-15015 May 2019 Correction to Amendment No. 315 Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-425, Revision 3 ML19063B9482019-04-23023 April 2019 Issuance of Amendment No. 315 Adoption of Technical Specification Task Force Traveler TSTF-425, Revision 3 ML18337A2472019-01-17017 January 2019 Issuance of Amendment Nos. 263 and 314 Revision to Emergency Action Level Scheme ML18317A3822018-12-19019 December 2018 Issuance of Amendment No. 313, Revise Technical Specification 3.3.3.6, Post-Accident Instrumentation ML18306A5132018-11-30030 November 2018 Issuance of Conforming Amendment Nos. 262, 312 and 215 Transfers of Renewed Facility Operating Licenses ML18298A0122018-11-27027 November 2018 Issuance of Amendment No. 311 Updating the Reactor Coolant System Pressure Temperature Limits ML18260A3392018-10-24024 October 2018 Issuance of Amendment No. 261 Revision to Technical Specification Bases Related to Emergency Feedwater Turbine-Driven Pump Steam Supply Valves ML18115A2822018-06-19019 June 2018 Issuance of Amendment No. 260 Technical Specification Changes Pursuant to Technical Specifications Task Force (TSTF) Traveler TSTF-412 Revision 3 (CAC No. MG0009; EPID L-2017-LLA-0267) ML18134A2532018-06-19019 June 2018 Issuance of Amendment No. 310 Technical Specification Changes to Provide Actions for Emergency Feedwater Pump Inoperability Consistent with NUREG-1432, Revision 4 (CAC No. MG0016; EPID L-2017-LLA-0268) ML18033A1752018-02-26026 February 2018 Issuance of Amendment No. 259 to Adopt TSTF-427, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability (CAC No. MG0132; EPID L-2017-LLA-0301) ML18051A5892018-02-26026 February 2018 Issuance of Amendment No. 309 to Adopt TSTF-427, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability (CAC No. MG0131; EPID L-2017-LLA-0302) ML18011A0642018-01-18018 January 2018 Issuance of Amendment No. 308 to Exclude Exercise of Control Element Assembly 4 with Respect to Surveillance Requirement 4.1.3.1.2 for the Remainder of Cycle 26 (Exigent Circumstances) ML17235A5192017-10-10010 October 2017 Issuance of Amendment No. 258 Revision of Steam Generator Technical Specifications to Reflect Adoption of TSTF-510 (CAC MF9653; EPID L-2017-LLA-0221) ML17251A2112017-10-10010 October 2017 Issuance of Amendment No. 307 Revision of Steam Generator Technical Specifications to Reflect Adoption of Technical Specifications Task Force Traveler TSTF-510 (CAC MF9654; EPID L-2017-LLA-0222) ML17096A2352017-05-12012 May 2017 Issuance of Amendment No. 306 Request to Revise the National Fire Protection Association (NFPA) Standard 805 Modifications ML16215A3712017-03-29029 March 2017 Issuance of Amendment No. 305 to Adopt Technical Specifications Task Force Traveler TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing... ML16165A4232017-03-10010 March 2017 Issuance of Amendment No. 257 Adoption of Technical Specifications Task Force Traveler TSTF-545, Revision 3, 2024-08-13
[Table view] Category:Safety Evaluation
MONTHYEARML24185A2602024-10-0404 October 2024 Issuance of Amendment No. 335 to Revise Typographical Errors in Technical Specifications ML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 ML24101A1792024-06-25025 June 2024 Issuance of Amendment No. 333 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24086A5412024-04-10010 April 2024 Authorization of Request for Alternative ANO1-ISI-037 Regarding Extension of Reactor Vessel Inservice Inspection Interval ML24031A6442024-03-14014 March 2024 Issuance of Amendment No. 282 to Modify Technical Specification 3.3.1, Reactor Pressure System (RPS) Instrumentation, Turbine Trip Function on Low Control Oil Pressure ML23326A0392024-01-24024 January 2024 Issuance of Amendment No. 281 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23275A2072023-11-28028 November 2023 Issuance of Amendment No. 280 Removal of Technical Specification Condition Allowing Two Reactor Coolant Pump Operation ML23142A2022023-06-29029 June 2023 Issuance of Amendment Nos. 279 and 332 Emergency Plan Staffing Requirements ML23166B0902023-06-21021 June 2023 Request for Relief ANO1 ISI 036 Regarding Volumetric Examination Requirements ML23142A1062023-05-24024 May 2023 Authorization and Safety Evaluation for Alternative Request No. ANO1-ISI-035 ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML22342B1602023-01-10010 January 2023 Requests for Relief ANO2-ISI-023, -024, -025, -026, -027, and -028 to Permit Reduction of Inspection Area Due to Interference (EPIDs L-2022-LLR-0022,-0023, -0024, -0025, -0026, and -0027) ML22263A1912022-12-0909 December 2022 Issuance of Amendment No. 278 Revision to Technical Specifications 3.4.12 and 3.4.13 Based on Revised Dose Calculations (EPID L-2021-LLA-0181) - Non-Proprietary ML22236A5452022-08-26026 August 2022 Correction to Issuance of Amendment No. 331 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML22138A4312022-06-23023 June 2022 Issuance of Amendment No. 277 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML22104A2222022-05-12012 May 2022 Issuance of Amendments Revise Technical Specifications to Adopt TSTF 554 ML22083A1242022-04-28028 April 2022 Arkansas, Units 1 and 2; Grand Gulf Nuclear Station; River Bend Station; and Waterford Steam Electric Station - Issuance of Amendments Revise Technical Specifications to Adopt TSTF-541, Revision 2 ML22039A2822022-03-15015 March 2022 Issuance of Amendment Nos. 274 and 328 One-Time Change to Support Proactive Upgrade of the Emergency Cooling Pond Supply Piping ML22007A3172022-01-18018 January 2022 1, River Bend Station 1, and Waterford Steam Electric Station 3 - Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI ML21225A0552021-12-17017 December 2021 Issuance of Amendment No. 327 Addition of Technical Specification Limiting Condition for Operation 3.0.6 and Adoption of Safety Function Determination Program ML21341B2262021-12-13013 December 2021 Acceptance of Requested Licensing Action License Amendment Request to Revise Technical Specifications 3.4.12 and 3.4.13 Based on Revised Dose Calculations ML21313A0082021-12-0808 December 2021 Issuance of Amendments to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML21208A4492021-09-20020 September 2021 Issuance of Amendment No. 325 Revise Loss of Voltage Relay Allowable Values and Number of Degraded Voltage Channels ML21132A2792021-05-19019 May 2021 Request for Approval of Change to the Entergy Quality Assurance Program Manual ML21088A4332021-04-14014 April 2021 Issuance of Amendment No. 324 Adoption of Technical Specification Task Force Traveler, TSTF-569, Revision 2, Revise Response Time Testing Definition ML21027A4282021-03-23023 March 2021 Issuance of Amendment No. 272 Replacement of Reactor Building Spray Sodium Hydroxide Additive with a Passive Reactor Building Sump Buffering Agent ML21040A5132021-03-10010 March 2021 Issuance of Amendment No. 271 Revision to Loss of Voltage Relay Allowable Values ML20351A1532021-02-0808 February 2021 Issuance of Amendment No. 323 Technical Specification Deletions, Additions, and Relocations ML20288A8242020-11-16016 November 2020 Regulatory Audit Summary Concerning License Amendment Request to Replace the Reactor Building Spray Sodium Hydroxide Additive with a Passive Reactor Building Sump Buffering Agent NUREG-1432, Issuance of Amendment No. 322 Technical Specification Changes Related to Revised Fuel Handling Accident Analysis and Adoption of Technical Specification Improvements Consistent with NUREG-14322020-10-30030 October 2020 Issuance of Amendment No. 322 Technical Specification Changes Related to Revised Fuel Handling Accident Analysis and Adoption of Technical Specification Improvements Consistent with NUREG-1432 ML20226A2722020-08-18018 August 2020 Request to Use a Provision of a Later Edition of the ASME BPV Code, Section XI ML20160A1472020-06-30030 June 2020 Issuance of Amendment No. 270 to Adopt TSTF 563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML20135H1412020-06-30030 June 2020 Issuance of Amendment Nos. 269 and 321 Request to Incorporate the Tornado Missile Risk Evaluator Into the Licensing Basis ML20121A1932020-05-0606 May 2020 Alternative Requests for the Fifth 10 Year Interval Inservice Testing of Low Pressure Safety Injection Pumps and Service Water Valves ML20107J3172020-04-23023 April 2020 Relief Request ANO1-ISI-033 Related to ASME Code Case N-729-4 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles ML20087L8032020-04-0808 April 2020 Issuance of Amendment No. 320 to Revise Control Element Assembly Drop Times ML20083J9682020-03-26026 March 2020 Approval of Request for Alternative ANO 2-PT-002 End-of-Internal System Leakage Test for Extended Reactor Coolant Pressure Boundary Piping ML19231A2972020-01-29029 January 2020 Issuance of Amendment No. 318 Addition of Technical Specification Actions to Address Inoperability of the Containment Building Sump ML19220A9382019-09-27027 September 2019 Issuance of Amendment No. 266 Adoption of Technical Specifications Task Force Traveler TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML19254A6032019-09-19019 September 2019 Units 2 and 3; Palisades Nuclear Plant; River Bend; and Waterford Steam Electric Station, Unit 3 - Relief Request No. EN-19-RR-1, Use of ASME Code Case N-831-1 ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML19184A5542019-07-15015 July 2019 Request for Relief ANO1-ISI-032 from the ASME Code Section XI Visual Examination Requirements for the Fourth 10-Year Inservice Inspection Interval ML19156A4002019-06-11011 June 2019 Request for Alternative ANO2-ISI-021 to Permit Continued Application of the 2007 Edition Through the 2008 Addenda of ASME Code ML19098A9552019-05-22022 May 2019 Issuance of Amendment No. 264 Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-425, Revision 3 ML19063B9482019-04-23023 April 2019 Issuance of Amendment No. 315 Adoption of Technical Specification Task Force Traveler TSTF-425, Revision 3 ML18337A2472019-01-17017 January 2019 Issuance of Amendment Nos. 263 and 314 Revision to Emergency Action Level Scheme ML18346A3142019-01-0707 January 2019 Relief Nos. ANO1-ISI-027, -028, -029, -030, and -031 from ASME Code, Section XI, Examination Requirements for Fourth 10-Year Inservice Inspection Interval (EPID L-2018-LLR-0063, -0064, -0065, -0066, -0067) ML18317A3822018-12-19019 December 2018 Issuance of Amendment No. 313, Revise Technical Specification 3.3.3.6, Post-Accident Instrumentation ML18298A0122018-11-27027 November 2018 Issuance of Amendment No. 311 Updating the Reactor Coolant System Pressure Temperature Limits ML18260A3392018-10-24024 October 2018 Issuance of Amendment No. 261 Revision to Technical Specification Bases Related to Emergency Feedwater Turbine-Driven Pump Steam Supply Valves 2024-08-13
[Table view] Category:Technical Specifications
MONTHYEARML24198A0722024-08-21021 August 2024 Correction to Issuance of Amendment No. 333 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24031A6442024-03-14014 March 2024 Issuance of Amendment No. 282 to Modify Technical Specification 3.3.1, Reactor Pressure System (RPS) Instrumentation, Turbine Trip Function on Low Control Oil Pressure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting 0CAN042301, Radioactive Effluent Release Report for 20222023-04-14014 April 2023 Radioactive Effluent Release Report for 2022 ML22104A2222022-05-12012 May 2022 Issuance of Amendments Revise Technical Specifications to Adopt TSTF 554 ML21279A2312021-10-0606 October 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item Improvement ML21208A4492021-09-20020 September 2021 Issuance of Amendment No. 325 Revise Loss of Voltage Relay Allowable Values and Number of Degraded Voltage Channels ML21088A4332021-04-14014 April 2021 Issuance of Amendment No. 324 Adoption of Technical Specification Task Force Traveler, TSTF-569, Revision 2, Revise Response Time Testing Definition ML21027A4282021-03-23023 March 2021 Issuance of Amendment No. 272 Replacement of Reactor Building Spray Sodium Hydroxide Additive with a Passive Reactor Building Sump Buffering Agent 1CAN022102, Supplement Related to License Amendment Request to Replace the Reactor Hydroxide Additive with a Passive Reactor Building Sump Buffering Agent Sodium Tetraborate2021-02-22022 February 2021 Supplement Related to License Amendment Request to Replace the Reactor Hydroxide Additive with a Passive Reactor Building Sump Buffering Agent Sodium Tetraborate ML20160A1472020-06-30030 June 2020 Issuance of Amendment No. 270 to Adopt TSTF 563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML20135H1412020-06-30030 June 2020 Issuance of Amendment Nos. 269 and 321 Request to Incorporate the Tornado Missile Risk Evaluator Into the Licensing Basis ML19232A3792019-09-19019 September 2019 Correction to Issuance of Amendment No. 264 Adoption of Technical Specifications Task Force Traveler TSTF-425, Revision 3 ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML17251A2112017-10-10010 October 2017 Issuance of Amendment No. 307 Revision of Steam Generator Technical Specifications to Reflect Adoption of Technical Specifications Task Force Traveler TSTF-510 (CAC MF9654; EPID L-2017-LLA-0222) ML16165A4232017-03-10010 March 2017 Issuance of Amendment No. 257 Adoption of Technical Specifications Task Force Traveler TSTF-545, Revision 3, ML16027A1092016-02-24024 February 2016 Issuance of Amendment Nos. 255 and 303 Cyber Security Plan Implementation Schedule (CAC Nos. MF6258 and MF6259) ML15096A3812015-04-29029 April 2015 Issuance of Amendment No. 302, Revise Technical Specification Surveillance Requirement 4.1.3.1.2 Note to Eliminate Movement of Control Element Assembly 18 for Remainder of Operating Cycle 24 ML15068A3192015-03-31031 March 2015 Issuance of Amendment No. 301, Request to Adopt Technical Specification Task Force (TSTF)-422, Revision 2, Change in Technical Specifications End States (CE NPSD-1186) ML15023A1472015-03-0303 March 2015 Issuance of Amendment No. 253, Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-431, Revision 3, Change in Technical Specifications End States (BAW-2441) ML14356A2272015-02-18018 February 2015 Issuance of Amendment No. 300, Request to Adopt National Fire Protection Association Standard NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants ML15014A0712015-02-0303 February 2015 Issuance of Amendment No. 252, Request to Revise Technical Specification 5.5.16, Reactor Building Leakage Rate Testing Program, to Extend Type a Test Frequency to 15 Years ML14350B2852015-01-22022 January 2015 Issuance of Amendment No. 299, Revise Technical Specification 6.5.16, Containment Leakage Rate Testing Program, for Requirements for Containment Building Emergency Escape Air Lock Doors ML14254A1332014-11-24024 November 2014 Issuance of Amendment No. 250, Adoption of Technical Specifications Task Force (TSTF)-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360 1CAN111401, Arkansas Nuclear One, Unit 1, License Amendment Request Update the Reactor Coolant System Pressure and Temperature and the Low Temperature Overpressure Protection System Limits2014-11-21021 November 2014 Arkansas Nuclear One, Unit 1, License Amendment Request Update the Reactor Coolant System Pressure and Temperature and the Low Temperature Overpressure Protection System Limits 1CAN111401, License Amendment Request Update the Reactor Coolant System Pressure and Temperature and the Low Temperature Overpressure Protection System Limits2014-11-21021 November 2014 License Amendment Request Update the Reactor Coolant System Pressure and Temperature and the Low Temperature Overpressure Protection System Limits 1CAN101407, Clarifications to Response to Request for Additional Information Associated with Technical Specification Change to Extend the Type a Test Frequency to 15 Years2014-10-28028 October 2014 Clarifications to Response to Request for Additional Information Associated with Technical Specification Change to Extend the Type a Test Frequency to 15 Years 1CAN031401, License Amendment Request - Revised Pages Extend the Type a Test Frequency to 15 Years2014-03-11011 March 2014 License Amendment Request - Revised Pages Extend the Type a Test Frequency to 15 Years 1CAN121302, License Amendment Request Technical Specification Change to Extend the Type a Test Frequency to 15 Years2013-12-20020 December 2013 License Amendment Request Technical Specification Change to Extend the Type a Test Frequency to 15 Years 1CAN081302, Response to Request for Additional Information, Adoption of Technical Specification Task Force (TSTF)-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360.2013-08-28028 August 2013 Response to Request for Additional Information, Adoption of Technical Specification Task Force (TSTF)-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360. 2CAN061302, License Amendment Request - Supplemental Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-4712013-06-18018 June 2013 License Amendment Request - Supplemental Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-471 1CAN061301, License Amendment Request, Revision to Technical Specification 2.1.1.1 Reactor Core Safety Limits2013-06-11011 June 2013 License Amendment Request, Revision to Technical Specification 2.1.1.1 Reactor Core Safety Limits 2CAN011301, License Amendment Request - Adoption of Technical Specification Task Force (TSTF)-500, Revision 2 DC Electrical Rewrite - Update to TSTF-3602013-01-28028 January 2013 License Amendment Request - Adoption of Technical Specification Task Force (TSTF)-500, Revision 2 DC Electrical Rewrite - Update to TSTF-360 1CAN011304, License Amendment Request - Adoption of Technical Specification Task Force (TSTF)-500, Revision 2 DC Electrical Rewrite - Update to TSTF-360.2013-01-28028 January 2013 License Amendment Request - Adoption of Technical Specification Task Force (TSTF)-500, Revision 2 DC Electrical Rewrite - Update to TSTF-360. CNRO-2012-00009, Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications2012-11-20020 November 2012 Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications 1CAN061201, License Amendment Request Technical Specification Change Associated with Main Feedwater Valves2012-06-19019 June 2012 License Amendment Request Technical Specification Change Associated with Main Feedwater Valves 1CAN081001, License Amendment Request, Technical Specification Change Associated with Main Feedwater Isolation Valves2010-08-24024 August 2010 License Amendment Request, Technical Specification Change Associated with Main Feedwater Isolation Valves 2CAN051001, Response to Request for Additional Information Associated with Core Operating Limits Report References2010-05-17017 May 2010 Response to Request for Additional Information Associated with Core Operating Limits Report References 1CAN021004, Response to Request for Additional Information, Application for Technical Specification Improvement to Adopt TSTF-490, Revision 0, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec.2010-02-28028 February 2010 Response to Request for Additional Information, Application for Technical Specification Improvement to Adopt TSTF-490, Revision 0, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec. ML0931305282009-12-23023 December 2009 License Amendment No. 241, Modified Technical Specification 3.4.9, Pressurizer, to Delete Low Pressurizer Level Limit ML0930601322009-12-23023 December 2009 License Amendment No. 240, Revised Administrative Changes to Technical Specification 5.5.8, Inservice Testing Program, to Adopt TSTF-479-A and TSTF-497-A 1CAN080901, Changes to Reflect Revision to 10 CFR 50.55a Technical Change Travelers - TSTF-479-A and TSTF-497-A2009-08-0505 August 2009 Changes to Reflect Revision to 10 CFR 50.55a Technical Change Travelers - TSTF-479-A and TSTF-497-A 2CAN030901, License Amendment Request, Technical Specification Change to Modify the Mode of Applicability for Emergency Feedwater Actuation Signal2009-03-0202 March 2009 License Amendment Request, Technical Specification Change to Modify the Mode of Applicability for Emergency Feedwater Actuation Signal 1CAN020901, License Amendment Request, Technical Specification Change to Adopt Low Pressure Air Lock Seal Test2009-02-16016 February 2009 License Amendment Request, Technical Specification Change to Adopt Low Pressure Air Lock Seal Test ML0814000372008-09-0808 September 2008 Technical Specifications for Amendment No. 282 Technical Specification Task Force TSTF-490, Rev 0, Deletion of E Bar Definition and Revision to RCS Specific Activity. ML0812203132008-08-28028 August 2008 Tech Spec Pages for Amendment No. 281 Technical Specification Task Force Change TSTF-359, Increased Flexibility in Mode Restraints. ML0823801472008-08-21021 August 2008 License Amendment Request, Technical Specification Change to Extend Integrated Leak Rate Test Interval One-Time ML0814004492008-07-23023 July 2008 Tech Spec Pages for Amendment No. 280 Reactor Coolant System Relocation to TRM (Tac MD8313) 1CAN070804, License Amendment Request Regarding Technical Specification Changes Associated with Adoption of TSTF-3592008-07-21021 July 2008 License Amendment Request Regarding Technical Specification Changes Associated with Adoption of TSTF-359 2CAN070805, License Amendment Request Regarding Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers and Relocate TS 3.7.8 to the TRM2008-07-21021 July 2008 License Amendment Request Regarding Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers and Relocate TS 3.7.8 to the TRM 2024-08-21
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Vice President, Operations Arkansas Nuclear One Entergy Operations, Inc. 1448 S.R. 333 Russellville, AR 72802 April 29, 2015
SUBJECT:
ARKANSAS NUCLEAR ONE, UNIT NO. 2 -ISSUANCE OF AMENDMENT RE: REVISE TECHNICAL SPECIFICATIONS SURVEILLANCE REQUIREMENT TO ELIMINATE MOVEMENT OF CONTROL ELEMENT ASSEMBLY 18 FOR THE REMAINDER OF OPERATING CYCLE 24 (TAC NO. MF5698)
Dear Sir or Madam:
The U.S. Nuclear Regulatory Commission has issued the enclosed Amendment No. 302 to Renewed Facility Operating License No. NPF-6 for Arkansas Nuclear One, Unit No. 2. The amendment consists of changes to the Technical Specifications (TSs) in response to your application dated February 6, 2015, as supplemented by letter dated February 24, 2015. The amendment requested to eliminate exercising Control Element Assembly (CEA) 18 for the remainder of operating Cycle 24, currently scheduled to end on September 20, 2015. The proposed amendment would modify a Note to TS Surveillance Requirement (SR) 4.1.3.1.2 such that CEA 18 may be excluded from SR performance for the remainder of Cycle 24. A copy of our related Safety Evaluation is also enclosed.
The Notice of Issuance will be included in the Commission's next biweekly Federal Register notice. Docket No. 50-368
Enclosures:
- 1. Amendment No. 302 to NPF-6 2. Safety Evaluation cc w/encls: Distribution via Listserv Sincerely, Andrea E. Georg , Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 ENTERGY OPERATIONS, INC. DOCKET NO. 50-368 ARKANSAS NUCLEAR ONE. UNIT NO. 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 302 Renewed License No. NPF-6 1. The Nuclear Regulatory Commission (the Commission) has found that: A. The application for amendment by Entergy Operations, Inc. (the licensee), dated February 6, 2015, as supplemented by letter dated February 24, 2015, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
Enclosure 1 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-6 is hereby amended to read as follows: (2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 302, are hereby incorporated in the renewed license. The licensee shall operate the facility in accordance with the Technical Specifications
- 3. The license amendment is effective as of its date of issuance and shall be implemented immediately.
Attachment:
Changes to the Renewed Facility Operating License No. NPF-6 Technical Specifications Date of Issuance:
Apri 1 29, 2015 FOR THE NUCLEAR REGULATORY COMMISSION Michael T. Markley, Chief Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation ATTACHMENT TO LICENSE AMENDMENT NO. 302 RENEWED FACILITY OPERATING LICENSE NO. NPF-6 DOCKET NO. 50-368 Replace the following pages of the Renewed Facility Operating License No. NPF-6 and Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change. Operating License REMOVE INSERT 3 3 Technical Specifications REMOVE INSERT 3/4 1-18 3/4 1/18 3 (4) EOI, pursuant to the Act and 10 CFR Parts 30, 40 and 70 to receive, possess and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5) EOI, pursuant to the Act and 10 CFR Parts 30, 40 and 70 to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (6) EOI, pursuant to the Act and 10 CFR Parts 30 and 70 to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C. This renewed license shall be deemed to contain and is subject to conditions specified in the following Commission regulations in 10 CFR Chapter I; Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below: (1) Maximum Power Level EOI is authorized to operate the facility at steady state reactor core power levels not in excess of 3026 megawatts thermal. Prior to attaining this power level EOI shall comply with the conditions in Paragraph 2.C.(3). (2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 302, are hereby incorporated in the renewed license. The licensee shall operate the facility in accordance with the Technical Specifications.
Exemptive 2nd paragraph of 2.C.2 deleted per Amendment 20, 3/3/81. (3) Additional Conditions The matters specified in the following conditions shall be completed to the satisfaction of the Commission within the stated time periods following issuance of the renewed license or within the operational restrictions indicated.
The removal of these conditions shall be made by an amendment to the renewed license supported by a favorable evaluation by the Commission.
2.C.(3)(a)
Deleted per Amendment 24, 6/19/81. Renewed License No. NPF-6 Amendment No. 302 REACTIVITY CONTROL SYSTEMS ACTION: (Continued)
- e. With more than one CEA misaligned from any other CEA in its group by more than 7 inches (indicated position), be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. SURVEILLANCE REQUIREMENTS 4.1.3.1.1 The position of each CEA shall be determined to be within 7 inches (indicated position) of all other CEAs in its group at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. 4.1.3.1.2 Each CEA not fully inserted in the core shall be determined to be OPERABLE by movement of at least 5 inches in any one direction at least once per 92 days. (Note 1) Note 1
- Movement of CEA 18 is not required for the remainder of Cycle 24. If an outage of sufficient duration occurs prior to the end of Cycle 24, maintenance activities will be performed to restore the CEA. ARKANSAS -UNIT 2 3/4 1-18 Amendment No .
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 302 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-6
1.0 INTRODUCTION
ENTERGY OPERATIONS, INC. ARKANSAS NUCLEAR ONE. UNIT NO. 2 DOCKET NO. 50-368 By letter dated February 6, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 15041A068), as supplemented by letter dated February 24, 2015 (ADAMS Accession No. ML 15055A385), Entergy Operations, Inc. (Entergy), the licensee for Arkansas Nuclear One, Unit 2 (AN0-2), requested to revise the AN0-2 Technical Specifications (TS). The proposed revisions would eliminate exercising Control Element Assembly (CEA) 18 for the remainder of operating Cycle 24, currently scheduled to end September 20, 2015. The proposed amendment would modify a Note to Surveillance Requirement (SR) 4.1.3.1.2, such that CEA 18 may be excluded from SR performance for the remainder of Cycle 24. The licensee requested the amendment due to a degraded upper gripper coil (UGC) located on top of the reactor vessel head, which is the coil that normally holds the CEA in place. Should the UGC fail during CEA movement, the CEA would drop into the core, resulting in a reactivity transient and power reduction, and could result in a plant shutdown.
The licensee requests to delay the CEA surveillance until it can be repaired during the upcoming refueling outage in the fall of 2015. The supplemental letter dated February 24, 2015, provided information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the U.S. Nuclear Regulatory Commission (NRC) staff's original proposed no significant hazards consideration determination as published in the Federal Register on March 3, 2015 (80 FR 11475).
2.0 REGULATORY EVALUATION
2.1 System
Description The CEAs for AN0-2 are used for reactivity control. The CEAs are divided into nine groups, of which two are Shutdown Groups designated as Banks A and B. The CEA 18 is in Shutdown Bank B. The Shutdown Groups are the first withdrawn during startup and the last inserted Enclosure 2 during a planned shutdown.
During power operation, insertion of the Shutdown Groups is prohibited, except to complete performance of the SR 4.1.3.1.2 CEA exercise test. Since CEA 18 is within Shutdown Group B, this CEA must remain fully withdrawn at all times when the reactor is critical, except during performance of SR 4.1.3.1.2.
2.2 Applicable
Regulatory Requirements Section 182a of the Atomic Energy Act requires applicants for nuclear power plant operating licenses to include TS as part of the license. The Commission's regulatory requirements related to the content of the TS are contained in Title 10 of the Code of Federal Regulations (CFR) Section 50.36, "Technical specifications." The TS requirements in 10 CFR 50.36 include the following categories:
(1) safety limits, limiting safety systems settings and control settings, (2) limiting conditions for operation, (3) SRs, (4) design features, and (5) administrative controls.
SRs in 10 CFR 50.36 are requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met. AN0-2 was licensed for construction prior to the issuance of 10 CFR Part 50, Appendix A, "General Design Criteria for Nuclear Power Plants," and so the AN0-2 operating license was issued based on compliance with the draft General Design Criteria (GDC) (Federal Register notice dated July 11, 1967 (32 FR 10213)). However, Section 3.1.1 through 3.1.6 of the AN0-2 Safety Analysis Report (SAR) provide an analysis against those GDC contained in 10 CFR Part 50, Appendix A. The GDCs of Section 3.1.1 through 3.1.6 of the AN0-2 SAR applicable to this proposed change are:
- GDC 4, "Environmental and dynamic effects design bases," states, in part, that "[s]tructures, systems, and components important to safety shall be designed to accommodate the effects of and to be compatible with the environmental conditions associated with normal operation, maintenance, testing, and postulated accidents
.... "
states that "[t]he reactor core and associated coolant, control, and protection systems shall be designed with appropriate margin to assure that specified acceptable fuel design limits are not exceeded during any condition of normal operation, including the effects of anticipated operational occurrences."
- GDC 23, "Protection system failure modes," states that "[t]he protection system shall be designed to fail into a safe state or into a state demonstrated to be acceptable on some other defined basis if conditions such as disconnection of the system, loss of energy (e.g., electric power, instrument air), or postulated adverse environments (e.g., extreme heat or cold, fire, pressure, steam, water, and radiation) are experienced."
- GDC 25, "Protection system requirements for reactivity control malfunctions,
states that "[t]he protection system shall be designed to assure that specified acceptable fuel design limits are not exceeded for any single malfunction of the reactivity control systems, such as accidental withdrawal (not ejection or dropout) of control rods."
- GDC 26, "Reactivity control system redundancy and capability," states that "[t]wo independent reactivity control systems of different design principles shall be provided.
One of the systems shall use control rods, preferably including a positive means for inserting the rods, and shall be capable of reliably controlling reactivity changes to assure that under conditions of normal operation, including anticipated operational occurrences, and with appropriate margin for malfunctions such as stuck rods, specified acceptable fuel design limits are not exceeded.
The second reactivity control system shall be capable of reliably controlling the rate of reactivity changes resulting from planned, normal power changes (including xenon burnout) to assure acceptable fuel design limits are not exceeded.
One of the systems shall be capable of holding the reactor core subcritical under cold conditions."
- GDC 27, "Combined reactivity control systems capability," states that "[t]he reactivity systems shall be designed to have a combined capability, in conjunction with poison addition by the emergency core cooling system, of reliably controlling reactivity changes to assure that under postulated accident conditions and with appropriate margin for stuck rods the capability to cool the core is maintained."
- GDC 28, "Reactivity limits," states that "[t]he reactivity control systems shall be designed with appropriate limits on the potential amount and rate of reactivity increase to assure that the effects of postulated reactivity accidents can neither (1) result in damage to the reactor coolant pressure boundary greater than limited local yielding nor (2) sufficiently disturb the core, its support structures or other reactor pressure vessel internals to impair significantly the capability to cool the core. These postulated reactivity accidents shall include consideration of rod ejection (unless prevented by positive means), rod dropout, steam line rupture, changes in the reactor coolant temperature and pressure, and cold water addition."
3.1 Proposed
TS Changes The SR 4.1.3.1.2 currently states the following:
Each CEA not fully inserted in the core shall be determined to be OPERABLE by movement of at least 5 inches in any one direction at least once per 92 days. (Note 1) Note 1 -Movement of CEA #43 is not required for the remainder of cycle 15. If an outage of sufficient duration occurs prior to the end of Cycle 15, maintenance activities will be performed to restore the CEA. The SR 4.1.3.1.2 would be revised to state the following:
Each CEA not fully inserted in the core shall be determined to be OPERABLE by movement of at least 5 inches in any one direction at least once per 92 days. (Note 1) Note 1 -Movement of CEA 18 is not required for the remainder of Cycle 24. If an outage of sufficient duration occurs prior to the end of Cycle 24, maintenance activities will be performed to restore the CEA. 3.2 Summary of Technical Information Provided by the Licensee The licensee requested to revise the AN0-2 TS in order to eliminate exercising CEA 18 for the remainder of operating Cycle 24, currently scheduled to end September 20, 2015. The proposed amendment would modify a Note to SR 4.1.3.1.2 such that CEA 18 may be excluded from SR performance for the remainder of Cycle 24. In its letter dated February 6, 2015, the licensee stated that during the October 2, 2014, quarterly exercise, in accordance with TS SR 4.1.3.1.2, the CEA 18 UGC current trace indicated more "noise" than expected.
The current draw was measured to be higher than the normal current. CEA 18 was transferred to the lower gripper coil (LGC), thus de-energizing the UGC. The licensee stated that this change in current was considered an indication of UGC degradation.
The subsequent CEA exercise performed in January 2015 indicated further degradation of the CEA 18 UGC with a measured current draw higher than the September exercise, even though the UGC had not been in service during the SR interval.
Despite the progressive degradation, CEA 18 was exercised successfully.
Following the testing, the licensee energized the LGC "holding" coil for CEA 18 instead of the UGC, which is degrading.
In its letter dated February 6, 2015, the licensee stated that the purpose of SR 4.1.3.1.2 is to verify that the CEAs are moveable and trippable (i.e., otherwise free from mechanical binding).
The licensee evaluated the degrading condition to avoid a rod drop accident or plant transient.
The licensee concluded that CEA 18 remains trippable and is expected to remain available to contribute to shutdown margin (SOM). In its letter dated February 6, 2015, the licensee provided the following evaluation regarding SOM: TSs 3.1.1.1 (Modes 1 through 4) and 3.1.1.2 (Mode 5) specify that SOM shall be greater than or equal to that specified in the Core Operating Limits Report (COLR). The Cycle 24 COLR SOM operating limit is 5.0% llk/k in Modes 1 through 5. Calculations were performed at various Effective Full Power Days (EFPDs) throughout the remainder of Cycle 24 operation, and Entergy has determined that a minimum SOM of 5.5142% llk/k would exist following a reactor trip assuming both CEA 18 and the single CEA of highest reactivity worth fail to insert, well above the 5.0% llk/k SOM requirement of the COLR. This value was calculated at End of Cycle conditions which were determined to bound operation through the remainder of Cycle 24. 3.3 NRC Staff Evaluation In a request for additional information (RAI) dated February 23, 2015 (ADAMS Accession No. ML 15055A091
), the NRC staff requested that the licensee provide additional information regarding any other possible causes, other than UGC degradation, for the higher current draws encountered while performing SR 4.1.3.1.2 (RAI 1 ). The licensee stated, in its letter dated February 24, 2015, that the wide current trace for the UGC could be caused by the following:
(1) degradation in the gripper coil; (2) degradation in the firing circuit; or (3) the power switch or coil driver card could also fire the circuit improperly, generating a higher current draw and improper traces. In its RAI response, the licensee also provided the NRC staff with other possible causes for difficulties encountered while performing SR 4.1.3.1.2 other than UGC degradation, and provided information regarding whether it appeared that these other causes were the most probable cause. Based on the information provided by the licensee, the NRC staff has determined the licensee has adequately identified the possible causes for the degradation observed while exercising CEA 18, and, therefore, RAI 1 is resolved.
In its RAI dated February 23, 2015, the NRC staff also requested that the licensee identify any degradation mechanisms which could prevent the CEA from dropping into the core when the reactor trip breakers are open (RAls 2, 3, and 4). By letter dated February 24, 2015, the licensee stated the following:
All postulated failure modes are associated with the coil and associated control circuitry.
The reactor trip circuit breakers (RTCBs) open upon an automatic or manual reactor trip signal which removes power from both control and holding circuitry.
All coils on each CEA de-energize, resulting in all CEAs inserting into the core . .. . Any postulated failure mechanism that could prevent rod insertion (such as mechanical binding of the CEA itself) is not influenced or impacted by coil failure, or, control or holding circuitry failures.
Therefore, there are no postulated failure mechanisms where the coil or associated circuitry could physically prevent rod insertion once the RTCBs have opened. In addition, the postulated failure modes would not affect the RTCBs. Although not directly related to the identified condition of CEA 18, the system is designed in accordance with single failure criteria such that all circuitry will be de-energized even if one RTCB fails to open upon a reactor trip. Also in its letter dated February 24, 2015, the licensee identified the degradation mechanisms that could prevent the CEA from dropping into the core when the reactor trip breakers are open. The identified degradation mechanisms still allow for the CEA to insert into the core in a loss of power scenario, failure of the RTCB to open, failure of a reactor trip signal, or any physical limitation.
Based on the above, the NRC staff has determined the licensee has adequately identified the failure modes and established that the rod will insert into the core with reasonable certainty, and, therefore, RAls 2, 3, and 4 are resolved.
Additionally, in its RAI dated February 23, 2015, the NRC staff requested that the licensee confirm that SOM calculations were performed using NRG-approved methodologies currently used by AN0-2 to generate the COLR (RAI 5). In its response dated February 24, 2015, the licensee stated that it used the methodology contain in Entergy Topical Report ENEAD-01-P-A, "Qualification of Reactor Physics Methods for the Pressurized Water Reactors of the Entergy System," approved by the NRC staff by letter dated September 29, 1995 (ADAMS Legacy Accession No. 9510040333).
The calculations performed assured adequate existing SOM assuming both CEA 18 and the single highest reactivity worth CEA failed to insert. These models and methods utilized for the SOM calculation are also used to perform the TS surveillances.
The NRC staff determined that the SOM calculation was performed using an NRG-approved method. Based on the above, the NRC staff has determined the licensee has . adequately calculated the SOM available if CEA 18 fails to trip, and that the SOM available in that case would be greater than the SOM required by the COLR, and, therefore, RAI 5 is resolved.
The NRC staff concludes that the licensee identified the possible causes of the problems identified with CEA 18, identified the failure modes, established that CEA 18 remains trippable with reasonable certainty, and verified that there is adequate SOM (given the postulated event that CEA 18 and the single CEA of highest reactivity worth fail to insert). Additionally, the NRC staff concludes that the elimination of SR 4.1.3.1.2 for CEA 18 for the remainder of Cycle 24 will reduce the likelihood of a rod drop event and resulting plant transient until CEA 18 can be repaired.
Based on the above, and since the licensee has provided information to assure that the requirements of 10 CFR 50.36(c)(3) and the ECCS performance criteria of 10 CFR 50.46 will continue to be met, the NRC staff concludes that the elimination of exercising CEA 18 for SR 4.1.3.1.2 for the remainder of Cycle 24 is acceptable.
4.0 FINAL
NO SIGNIFICANT HAZARDS CONSIDERATION As mentioned above, the NRC has previously issued a proposed finding that this amendment involves no significant hazards consideration, and there has been no public comment on such finding published in the Federal Register March 3, 2015 (80 FR 11475). At the time of issuance of this amendment, the public comment period has expired, however, the 60-day period to request a hearing does not expire until May 4, 2015. The NRC's regulations in 10 CFR 50.92 state that the NRC may make a final determination that a license amendment involves no significant hazards consideration if operation of the facility, in accordance with the amendment, would not: (1) involve a significant increase in the probability or consequences of an accident previously evaluation; or (2) create the possibility of a new or different kind of accident from any accident previously evaluated; or (3) involve a significant reduction in a margin of safety. As required by 10 CFR 50.91 (a), an evaluation of the issue of no significant hazards consideration is presented below, as provided by the licensee in its license amendment request dated February 6, 2015: 1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?
Response:
No. One function of the CEAs is to provide a means of rapid negative reactivity addition into the core. This occurs upon receipt of a signal from the Reactor Protection System. This function will continue to be accomplished with the approval of the proposed change. Typically, once per 92 days each CEA is moved at least five inches to ensure the CEA is free to move. CEA 18 remains trippable (free to move) as illustrated by the last performance of SR 4.1.3.1.2 in January 2015. However, due to abnormally high coil voltage and current measured on the CEA 18 Upper Gripper Coil (UGC), future exercising of the CEA could result in the CEA inadvertently inserting into the core, if the UGC were to fail during the exercise test. The mis-operation of a CEA, which includes a CEA drop event, is an abnormal occurrence and has been previously evaluated as part of the AN0-2 accident analysis.
Inadvertent CEA insertion will result in a reactivity transient and power reduction, and could lead to a reactor shutdown if the CEA is deemed to be unrecoverable.
The proposed change would minimize the potential for inadvertent insertion of CEA 18 into the core by maintaining the CEA in place using the Lower Gripper Coil (LGC), which is operating normally.
The proposed change will not affect the CEAs ability to insert fully into the core upon receipt of a reactor trip signal. No modifications are proposed to the Reactor Protection System or associated Control Element Drive Mechanism Control System logic with regard to the ability of CEA 18 to remain available for immediate insertion.
The accident mitigation features of the plant are not affected by the proposed amendment.
Because CEA 18 remains trippable, no additional reactivity considerations need to be taken into consideration.
Nevertheless, Entergy has evaluated the reactivity consequences associated with failure of CEA 18 to insert upon a reactor trip in accordance with TS requirements for Shutdown Margin (SOM) and has determined that SOM requirements would be met should such an event occur at any time during the remainder of Cycle 24 operation. Therefore, this change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?
Response:
No. CEA 18 remains trippable.
The proposed change will not introduce any new design changes or systems that can prevent the CEA from perform its specified safety function.
As discussed previously, CEA mis-operation has been previously evaluated in the AN0-2 accident analysis.
Furthermore, SOM has been shown to remain within limits should an event occur at any time during the remainder of operating Cycle 24 such that CEA 18 fails to insert into the core upon receipt of a reactor trip signal. Therefore, this change does not create the possibility of a new or different kind of accident from an accident previously evaluated.
- 3. Does the proposed change involve a significant reduction in a margin of safety? Response:
No. SR 4.1.3.1.2 is intended to verify CEAs are free to move (i.e., not mechanically bound). The physical and electrical design of the CEAs, and past operating experience, provides high confidence that CEAs remain trippable whether or not exercised during each SR interval.
Eliminating further exercising of CEA 18 for the remainder of Cycle 24 operation does not directly relate to the potential for CEA binding to occur. No mechanical binding has been previously experienced at AN0-2. CEA 18 is contained within a Shutdown CEA Group and is not used for reactivity control during power maneuvers (the CEA must remain fully withdrawn at all times when the reactor is critical).
In addition, Entergy has concluded that required SOM will be maintained should CEA 18 fail to insert following a reactor trip at any point during the remainder of Cycle 24 operation.
Therefore, this change does not involve a significant reduction in a margin of safety. Based on the above evaluation, the NRC staff concludes that the three standards of 10 CFR 50.92(c) are satisfied.
Therefore, the NRC staff has made a final determination that no significant hazards consideration is involved for the proposed amendment and that the amendment should be issued as allowed by the criteria contained in 1 O CFR 50.91.
5.0 STATE CONSULTATION
In accordance with the Commission's regulations, The Arkansas State official was notified of the proposed issuance of the amendment.
The State official had no comments.
6.0 ENVIRONMENTAL
CONSIDERATION The amendment changes a requirement with respect to installation or use of a facility component located within the restricted area as defined in 1 O CFR Part 20. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure.
The Commission has made a final finding that the amendment involves no significant hazards consideration.
Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9).
Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
7.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) there is reasonable assurance that such activities will be . conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public. Principal Contributor:
M. Hardgrove, NRR/DSS/SRXB Date: April 29, 2015 Vice President, Operations Arkansas Nuclear One Entergy Operations, Inc. 1448 S.R. 333 Russellville, AR 72802 April 29, 2015
SUBJECT:
ARKANSAS NUCLEAR ONE, UNIT NO. 2 -ISSUANCE OF AMENDMENT RE: REVISE TECHNICAL SPECIFICATIONS SURVEILLANCE REQUIREMENT TO ELIMINATE MOVEMENT OF CONTROL ELEMENT ASSEMBLY 18 FOR THE REMAINDER OF OPERATING CYCLE 24 (TAC NO. MF5698)
Dear Sir or Madam:
The U.S. Nuclear Regulatory Commission has issued the enclosed Amendment No. 302 to Renewed Facility Operating License No. NPF-6 for Arkansas Nuclear One, Unit No. 2. The amendment consists of changes to the Technical Specifications (TSs) in response to your application dated February 6, 2015, as supplemented by letter dated February 24, 2015. The amendment requested to eliminate exercising Control Element Assembly (CEA) 18 for the remainder of operating Cycle 24, currently scheduled to end on September 20, 2015. The proposed amendment would modify a Note to TS Surveillance Requirement (SR) 4.1.3.1.2 such that CEA 18 may be excluded from SR performance for the remainder of Cycle 24. A copy of our related Safety Evaluation is also enclosed.
The Notice of Issuance will be included in the Commission's next biweekly Federal Register notice. Sincerely, IRA! Andrea E. George, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-368
Enclosures:
- 1. Amendment No. 302 to NPF-6 2. Safety Evaluation cc w/encls: Distribution via Listserv DISTRIBUTION:
PUBLIC LPL4-1 R/F RidsAcrsAcnw_MailCTR Resource RidsNrrDeEicb Resource RidsNrrDorlDpr Resource RidsNrrDorllpl4-1 Resource RidsNrrDssSrxb Resource RidsNrrDssStsb Resource ADAMS A ccess1on N ML 15096A381
- o.
- per SE memo OFFICE N RR/DORULPL4-1
/PM NRR/DORULPL4-1
/PM NRR/DORL/LPL4-1
/LA NAME LRegner**
A George JBurkhardt DATE 4/7/15 4/7/15 4/7/15 OFFICE NRR/DE/EICB/BC OGC-NLO NRR/DORL/LPL4-1
/BC NAME JThorp DRoth MMarkley DATE 4/10/15 4/20/15 4/29/15 OFFICIAL RECORD COPY RidsNrrLAJBurkhardt Resource RidsNrrPMANO Resource RidsRgn4MailCenter Resource MHardgrove, NRR/DSS/SRXB
- . *1 via ema1 NRR/DSS/STSB/BC NRR/DSS/SRXB/BC RElliott (MChernoff for) CJackson*
4/8/15 4/1/15 NRR/DORULPL4-1
/PM A George 4/29/15