ML18155A431: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 2: | Line 2: | ||
| number = ML18155A431 | | number = ML18155A431 | ||
| issue date = 05/18/2018 | | issue date = 05/18/2018 | ||
| title = | | title = Changes to Technical Specification Bases | ||
| author name = Sharp S | | author name = Sharp S | ||
| author affiliation = Northern States Power Company, Minnesota | | author affiliation = Northern States Power Company, Minnesota |
Revision as of 02:53, 31 January 2019
ML18155A431 | |
Person / Time | |
---|---|
Site: | Prairie Island |
Issue date: | 05/18/2018 |
From: | Sharp S Northern States Power Company, Minnesota |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
L-Pl-18-030 | |
Download: ML18155A431 (2) | |
Similar Documents at Prairie Island | |
---|---|
Category:Letter
MONTHYEARIR 05000282/20230042024-02-0101 February 2024
[Table view]Integrated Inspection Report 05000282/2023004 and 05000306/2023004 ML23356A1232024-01-29029 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) ML24024A0722024-01-24024 January 2024 Independent Spent Fuel Storage Installation, Onticello, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24017A0182024-01-19019 January 2024 Confirmation of Initial License Examination ML23356A0032024-01-17017 January 2024 Issuance of Amendments Revise Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) L-PI-23-034, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System,2024-01-0202 January 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System, L-PI-23-035, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report2023-12-20020 December 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report IR 07200010/20234012023-12-20020 December 2023 Independent Spent Fuel Storage Installation Security Inspection Report 07200010/2023401 ML23349A0572023-12-15015 December 2023 and Independent Spent Fuel Storage Installation, Revision to Correspondence Service List for Northern States Power - Minnesota ML23215A1672023-12-15015 December 2023 Acceptance of Requested Licensing Action Amendment Request to Revise Surveillance Requirement 3.8.1.2 Note 3 IR 05000282/20234012023-12-13013 December 2023 Security Baseline Inspection Report 05000282/2023401 and 05000306/2023401 L-PI-23-033, Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 32023-12-0505 December 2023 Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 ML23304A1632023-11-15015 November 2023 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request to Revise SR 3.8.1.2 Note 3 ML23319A3182023-11-15015 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000282/20230032023-11-0808 November 2023 Integrated Inspection Report 05000282/2023003 and 05000306/2023003 ML23311A3572023-11-0707 November 2023 Core Operating Limits Report (COLR) for Prairie Island Nuclear Generating Plant (PINGP) Unit 2. Cycle 33. Revision 0 ML23285A3062023-10-12012 October 2023 Implementation of the Fleet Standard Emergency Plan for the Monticello Nuclear Generating Plant and the Prairie Island Nuclear Generating Plant ML23270B9022023-09-29029 September 2023 Review of Reactor Vessel Material Surveillance Program Capsule N Technical Report L-PI-23-025, License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 32023-09-28028 September 2023 License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 ML23265A2532023-09-26026 September 2023 Review of Reactor Vessel Material Surveillance Program Capsule N Technical Report ML23262B0372023-09-19019 September 2023 Response to NRC Request for Additional Information Regarding the 2023 Monticello and Prairie Island Plant Decommissioning Funding Status Reports ML23256A1682023-09-13013 September 2023 Independent Spent Fuel Storage Installation and Monticello Nuclear Generating Plant - Voluntary Security Clearance Program 2023 Insider Threat Program Self-Inspection L-PI-23-023, Baffle Former Bolts Alternate Aging Management Strategy2023-09-11011 September 2023 Baffle Former Bolts Alternate Aging Management Strategy IR 05000282/20230052023-08-30030 August 2023 Updated Inspected Plan for Prairie Island Nuclear Generating Plant Report 05000282/2023005 and 05000306/2023005 IR 05000282/20230102023-08-17017 August 2023 NRC Inspection Report 05000282/2023010 and 05000306/2023010 ML23222A0122023-08-10010 August 2023 Independent Spent Fuel Storage Installation and Monticello Nuclear Generating Plant - Changes in Foreign Ownership, Control or Influence IR 05000282/20230022023-08-0303 August 2023 Integrated Inspection Report 05000282/2023002 and 05000306/2023002 ML23214A2032023-08-0202 August 2023 Request for Information for an NRC Quadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000282/2024010; 05000306/2024010 ML23206A2342023-07-25025 July 2023 Independent Spent Fuel Storage Installation, and Monticello Nuclear Generating Plant, Changes in Foreign Ownership, Control or Influence ML23202A0032023-07-21021 July 2023 Independent Spent Fuel and Independent Spent Fuel Storage Installation, Monticello Nuclear Generating Plant, Submittal of Quality Assurance Topical Report (NSPM-1) ML23199A0922023-07-18018 July 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000306/2023004 ML23195A1732023-07-14014 July 2023 Revision of Standard Practice Procedures Plan L-PI-23-018, License Amendment Request to Revise ISFSI Technical Specification 4.4 to Allow Use of a Code Alternative to ASME Code, NB-5130, Examination of Weld Edge Preparation Surfaces, for the TN-40HT2023-07-14014 July 2023 License Amendment Request to Revise ISFSI Technical Specification 4.4 to Allow Use of a Code Alternative to ASME Code, NB-5130, Examination of Weld Edge Preparation Surfaces, for the TN-40HT ML23181A0192023-06-30030 June 2023 Independent Spent Fuel Storage Installation, Revision to Correspondence Service List for Northern States Power - Minnesota ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III L-PI-23-006, License Amendment Request to Revise Technical Specification 3.7.8 Required Actions2023-06-22022 June 2023 License Amendment Request to Revise Technical Specification 3.7.8 Required Actions L-PI-23-016, 2022 10 CFR 50.46 LOCA Annual Report2023-06-14014 June 2023 2022 10 CFR 50.46 LOCA Annual Report IR 05000282/20234202023-06-0101 June 2023 Security Baseline Inspection Report 05000282/2023420 and 05000306/2023420 ML23150A1722023-05-30030 May 2023 Preparation and Scheduling of Operator Licensing Examinations 2024-02-01 Category:Technical Specification MONTHYEARL-PI-22-020, Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2022-12-0202 December 2022
[Table view]Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) ML22243A1822022-10-28028 October 2022 Correction Letter for Amendments 239 and 227 to Renewed Facility Operating Licenses - Enclosure - TS Page 5.5-5 L-PI-22-040, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-10-0606 October 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections L-PI-21-006, License Amendment Request to Revise Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation, to Incorporate Installed Bypass Test Capability for the Power Range RTS Functions2021-10-0202 October 2021 License Amendment Request to Revise Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation, to Incorporate Installed Bypass Test Capability for the Power Range RTS Functions L-PI-21-007, Application to Revise Technical Specifications to Adopt TSTF-471, Eliminate Use of the Term Core Alterations in Actions and Notes2021-04-19019 April 2021 Application to Revise Technical Specifications to Adopt TSTF-471, Eliminate Use of the Term Core Alterations in Actions and Notes ML20118D3182020-04-27027 April 2020 Enclosure 4 - Technical Specifications (TS) Bases Control Program L-PI-19-041, Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements2019-12-23023 December 2019 Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements L-PI-19-031, License Amendment Request: Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2019-12-16016 December 2019 License Amendment Request: Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML18155A4312018-05-18018 May 2018 Changes to Technical Specification Bases ML18106A0412018-04-0505 April 2018 ISFSI - Technical Specifications Updating Instructions, Amendment 10 L-PI-16-045, Revisions to Technical Specifications Bases2016-05-20020 May 2016 Revisions to Technical Specifications Bases ML15327A2282015-11-17017 November 2015 License Amendment Request for Spent Fuel Pool Criticality Technical Specification Changes L-PI-15-087, Enclosures 7 & 8: Modeling of Fuel Assemblies Containing Both Ifba and Gadolinia Absorber Rods with Westinghouse Core Design Code Systems and Affidavit2015-10-31031 October 2015 Enclosures 7 & 8: Modeling of Fuel Assemblies Containing Both Ifba and Gadolinia Absorber Rods with Westinghouse Core Design Code Systems and Affidavit ML15209A5122015-07-17017 July 2015 Technical Specifications - Updating Instructions -Effective Date: 7/24/2015 ML14058A2512014-02-19019 February 2014 3801 Markup Bases L-PI-12-013, Response to Requests for Additional Information Associated with Adoption of the Alternative Source Term (AST) Methodology2012-02-24024 February 2012 Response to Requests for Additional Information Associated with Adoption of the Alternative Source Term (AST) Methodology ML1021001982010-07-16016 July 2010 Licensing Bases for Turbine Building Internal Flooding L-PI-10-001, License Amendment Request (LAR) to Revise Technical Specification (TS) 3.8.3, Diesel Fuel Oil, Storage Requirements2010-01-27027 January 2010 License Amendment Request (LAR) to Revise Technical Specification (TS) 3.8.3, Diesel Fuel Oil, Storage Requirements L-PI-09-125, License Amendment Request and Exemption Request to Support the Use of Optimized Zirlotm Fuel Rod Cladding2009-11-24024 November 2009 License Amendment Request and Exemption Request to Support the Use of Optimized Zirlotm Fuel Rod Cladding L-PI-09-076, License Amendment Request (LAR) to Revise Technical Specifications in Accordance with TSTF-448, Revision 3 - Control Room Habitability2009-06-24024 June 2009 License Amendment Request (LAR) to Revise Technical Specifications in Accordance with TSTF-448, Revision 3 - Control Room Habitability ML0910506192009-04-15015 April 2009 License Amendment Request for Adoption of TSTF-511, Rev. 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26 ML0827402262008-11-0606 November 2008 License Amendment, Revise Containment Spray Nozzle Surveillance Requirements ML0828105432008-10-17017 October 2008 Correction of Error in Amendment No. 6 of Material License SNM-2506 for the Independent Spent Fuel Storage Facility Regarding the Transfer of Operating Authority (Tac Nos. L24245, MD9622, and MD9623) ML0823409202008-08-15015 August 2008 Tech Spec Page for Amendment 187 Emergency Diesel Generator Monthly Load Test Surveillance Requirement L-PI-08-047, License Amendment Request for Technical Specifications Changes to Allow Use of Westinghouse 0.422-inch OD 14x14 Vantage+ Fuel2008-06-26026 June 2008 License Amendment Request for Technical Specifications Changes to Allow Use of Westinghouse 0.422-inch OD 14x14 Vantage+ Fuel L-PI-07-060, Supplement to License Amendment Request (LAR) for Miscellaneous Technical Specification (TS) Improvements (TAC Nos. MD 2822 and MD 2823)2007-07-16016 July 2007 Supplement to License Amendment Request (LAR) for Miscellaneous Technical Specification (TS) Improvements (TAC Nos. MD 2822 and MD 2823) L-PI-07-048, License Amendment Request (LAR) Incorporating Technical Specification Task Force (TSTF) Industry Travelers TSTF-479, TSTF-485, and TSTF-4972007-07-0303 July 2007 License Amendment Request (LAR) Incorporating Technical Specification Task Force (TSTF) Industry Travelers TSTF-479, TSTF-485, and TSTF-497 L-PI-07-028, Application for Technical Specification Change TSTF-491, Removal of the Main Steam and Main Feedwater Valve Isolation Time from Technical Specifications Using Consolidated Line Item Improvement..2007-05-10010 May 2007 Application for Technical Specification Change TSTF-491, Removal of the Main Steam and Main Feedwater Valve Isolation Time from Technical Specifications Using Consolidated Line Item Improvement.. ML0708101312007-03-20020 March 2007 Technical Specification Pages Re Steam Generator Tube Integrity L-PI-06-058, License Amendment Request (LAR) to Revise Technical Specifications (TS) in Support of Containment Sump Resolution2006-12-14014 December 2006 License Amendment Request (LAR) to Revise Technical Specifications (TS) in Support of Containment Sump Resolution L-PI-04-112, Application for Technical Specification Improvement to Extend the Inspection Interval for Reactor Coolant Pump Flywheels Using the Consolidated Line Item Improvement Process2004-10-15015 October 2004 Application for Technical Specification Improvement to Extend the Inspection Interval for Reactor Coolant Pump Flywheels Using the Consolidated Line Item Improvement Process ML0412102562004-04-28028 April 2004 Technical Specifications for Amd 162 and 153, Respectively ML0403707272004-02-0303 February 2004 Technical Specification for Amendment Nos. 161 and 152, Prairie Island Nuclear Generating Plant, Units 1 and 2 ML0404204242004-01-30030 January 2004 Application for Technical Specification Improvement to Eliminate Requirements for Hydrogen Recombiners and Hydrogen/Oxygen Monitors Using the Consolidated Line Item Improvement Process L-PI-03-026, License Amendment Request (LAR) Dated March 19, 2003 Clarification of Licensed Operator Qualifications2003-03-19019 March 2003 License Amendment Request (LAR) Dated March 19, 2003 Clarification of Licensed Operator Qualifications 2022-12-02 Category:Bases Change MONTHYEARL-PI-21-006, License Amendment Request to Revise Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation, to Incorporate Installed Bypass Test Capability for the Power Range RTS Functions2021-10-0202 October 2021
[Table view]License Amendment Request to Revise Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation, to Incorporate Installed Bypass Test Capability for the Power Range RTS Functions ML20118D3182020-04-27027 April 2020 Enclosure 4 - Technical Specifications (TS) Bases Control Program L-PI-19-041, Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements2019-12-23023 December 2019 Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements L-PI-19-031, License Amendment Request: Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2019-12-16016 December 2019 License Amendment Request: Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML18155A4312018-05-18018 May 2018 Changes to Technical Specification Bases L-PI-16-045, Revisions to Technical Specifications Bases2016-05-20020 May 2016 Revisions to Technical Specifications Bases ML15327A2282015-11-17017 November 2015 License Amendment Request for Spent Fuel Pool Criticality Technical Specification Changes L-PI-15-087, Enclosures 7 & 8: Modeling of Fuel Assemblies Containing Both Ifba and Gadolinia Absorber Rods with Westinghouse Core Design Code Systems and Affidavit2015-10-31031 October 2015 Enclosures 7 & 8: Modeling of Fuel Assemblies Containing Both Ifba and Gadolinia Absorber Rods with Westinghouse Core Design Code Systems and Affidavit ML15209A5122015-07-17017 July 2015 Technical Specifications - Updating Instructions -Effective Date: 7/24/2015 ML14058A2512014-02-19019 February 2014 3801 Markup Bases L-PI-12-013, Response to Requests for Additional Information Associated with Adoption of the Alternative Source Term (AST) Methodology2012-02-24024 February 2012 Response to Requests for Additional Information Associated with Adoption of the Alternative Source Term (AST) Methodology ML1021001982010-07-16016 July 2010 Licensing Bases for Turbine Building Internal Flooding L-PI-08-047, License Amendment Request for Technical Specifications Changes to Allow Use of Westinghouse 0.422-inch OD 14x14 Vantage+ Fuel2008-06-26026 June 2008 License Amendment Request for Technical Specifications Changes to Allow Use of Westinghouse 0.422-inch OD 14x14 Vantage+ Fuel L-PI-07-048, License Amendment Request (LAR) Incorporating Technical Specification Task Force (TSTF) Industry Travelers TSTF-479, TSTF-485, and TSTF-4972007-07-0303 July 2007 License Amendment Request (LAR) Incorporating Technical Specification Task Force (TSTF) Industry Travelers TSTF-479, TSTF-485, and TSTF-497 L-PI-06-058, License Amendment Request (LAR) to Revise Technical Specifications (TS) in Support of Containment Sump Resolution2006-12-14014 December 2006 License Amendment Request (LAR) to Revise Technical Specifications (TS) in Support of Containment Sump Resolution 2021-10-02 |
Text
1717 Wakonade Drive Welch, MN 55089 (l Xcel Energy RESPONSIBLE BY NATURE 800.895.4999 xcelenergy.com May 18, 2018 A TIN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Prairie Island Nuclear Generating Plant, Units 1 and 2 Docket Nos. 50-282 and 50-306 Renewed Facility Operating License Nos. DPR-42 and DPR-60 Changes to Technical Specification Bases L-Pl-18-030 TS 5.5.12.d
Reference:
- 1) NSPM letter, S. Northard to NRC Document Control Desk, "Changes to Technical Specification Bases," L-Pl-16-045, dated May 20, 2016 (ADAMS Accession No. ML 16161A372)
In accordance with TS 5.5.12, "Technical Specifications (TS) Bases Control Program", the Northern States Power Company, a Minnesota Corporation (NSPM), doing business as Xcel Energy, submits a compact disc (Enclosure
- 1) containing the TS Bases for the Prairie Island Nuclear Generating Plant, Units 1 and 2, that includes the changes to the bases from* Revisions 230 through 241 that have been implemented since the previous submittal (Reference 1 ).
- Summary of Commitments This letter makes no new commitments and no revisions to existing commitments.
Please contact Mr. Richard. Loeffler, at 612-342-8981.
fo Scott Sharp Site Vice President, Prairie Island Nuclear Generating Plant Northern States Power Company -Minnesota Document Control Desk Page2 Enclosure (1) -Compact Disc cc: Administrator, Region Ill, USNRC Project Manager, Prairie lsiand, USNRC Resident Inspector, Prairie Island, USNRC