ML082340920
Jump to navigation
Jump to search
| ML082340920 | |
| Person / Time | |
|---|---|
| Site: | Prairie Island |
| Issue date: | 08/15/2008 |
| From: | Plant Licensing Branch III |
| To: | |
| Olshan L N, NRR/DORL, 415-1419 | |
| Shared Package | |
| ML081980111 | List: |
| References | |
| TAC MD6551 | |
| Download: ML082340920 (1) | |
Text
AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.8.1.3
NOTES
- 1. DG loadings may include gradual loading in consideration of manufacturer's recommendations.
- 2. Momentary transients outside the load range do not invalidate this test.
- 3. This Surveillance shall be conducted on only one DG at a time.
- 4. This SR shall be preceded by and immediately follow without shutdown a successful performance of SR 3.8.1.2 or SR 3.8.1.6.
Verify each DG is synchronized and loaded and operates for > 60 minutes at a load:
- a.
Unit 1; > 2500 kW; and
- b. Unit 2; >5100kW and_<5300 kW.
31 days SR 3.8.1.4 Verify fuel oil level above lower limit switch in each 31 days day tank.
SR 3.8.1.5 Verify the fuel oil transfer system operates to transfer 31 days fuel oil from storage tank to the day tank.
Prairie Island Units I and 2 Unit I - Amendment No. 4-58 4-7-4187 Unit 2 - Amendment No. 4-49 165 3.8.1-7