ML18274A016: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:September 14, 2018 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 9926 Corporate Campus Dr., Suite 2200, Louisville, KY 40223-5000 P.O. Box 35690, Louisville, KY 40232-5690 I 888.223.2003 I aafinii.com
 
==Subject:==
Event Number 5346, reported at 2048 EST on 06/20/18 To whom it may concern, A notification was submitted to the Commission with the subject matter of, "Unapproved Design Change in a High Efficiency Particulate Air Filter." At this time, the evaluation is pending third part qualification testing of the product. Information obtained from the qualification will be used in the determination of a defect. AAF Flanders had anticipated this process to have been completed by Sept 15, 2018 but because it is still on-going, we request an extension until October 31, 2018 to submit a final report to the Commission.
The subject filters (model number 0-007-C-42-03-NU-11-13-GG FU5) supplied to Prairie Island Nuclear Generating Plant (PINGP)/ Xcel Energy had not been installed.
AAF Flanders has recalled the subject filters and . . . currently have them segregated and stored at our facility.
They pose ho threat public safety. Sincerely, Shawn Windley Vice President, Product Engineering AAF International cc: Russell Ipock, AAF Flanders Obe Worthington, AAF Flanders Brian Martz, AAF Flanders Jay Colwell, Xcel! Energy}}

Revision as of 23:30, 5 November 2018

Aaf Flanders - Unapproved Design Change in a High Efficiency Particulate Air Filter
ML18274A016
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 09/14/2018
From: Windley S
AAF Flanders, AAF International
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
5346
Download: ML18274A016 (1)


Text

September 14, 2018 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 9926 Corporate Campus Dr., Suite 2200, Louisville, KY 40223-5000 P.O. Box 35690, Louisville, KY 40232-5690 I 888.223.2003 I aafinii.com

Subject:

Event Number 5346, reported at 2048 EST on 06/20/18 To whom it may concern, A notification was submitted to the Commission with the subject matter of, "Unapproved Design Change in a High Efficiency Particulate Air Filter." At this time, the evaluation is pending third part qualification testing of the product. Information obtained from the qualification will be used in the determination of a defect. AAF Flanders had anticipated this process to have been completed by Sept 15, 2018 but because it is still on-going, we request an extension until October 31, 2018 to submit a final report to the Commission.

The subject filters (model number 0-007-C-42-03-NU-11-13-GG FU5) supplied to Prairie Island Nuclear Generating Plant (PINGP)/ Xcel Energy had not been installed.

AAF Flanders has recalled the subject filters and . . . currently have them segregated and stored at our facility.

They pose ho threat public safety. Sincerely, Shawn Windley Vice President, Product Engineering AAF International cc: Russell Ipock, AAF Flanders Obe Worthington, AAF Flanders Brian Martz, AAF Flanders Jay Colwell, Xcel! Energy