ULNRC-06806, Submittal of Radiological Emergency Response Plan, Revision 55

From kanterella
(Redirected from ULNRC-06806)
Jump to navigation Jump to search
Submittal of Radiological Emergency Response Plan, Revision 55
ML23102A191
Person / Time
Site: Callaway  Ameren icon.png
Issue date: 04/12/2023
From: Witt T
Ameren Missouri, Union Electric Co
To:
Office of Nuclear Reactor Regulation, Document Control Desk
Shared Package
ML23102A190 List:
References
ULNRC-06806
Download: ML23102A191 (1)


Text

Aiiie MISSOURI ren Callaway Plant April 12, 2023 ULNRC-06806 U. S Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-000 1 10 CFR 50.54(q)(5)

Ladies and Gentlemen:

DOCKET NUMBERS 50-483 AND 72-1045 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.

RENEWED FACILITY OPERATING LICENSE NPF-30 RADIOLOGICAL EMERGENCY RESPONSE PLAN (RERP), REVISION 55 Pursuant to 10 CFR 5054(q)(5), please find enclosed (as Enclosure 1) one copy ofRevision 55 to the Callaway Plant Radiological Emergency Response Plan (RERP). Also enclosed (as Enclosure 2) is one copy of the Procedure Review Form (PRF), Summary of Changes, and Analysis (50.59 Applicability and 50.54(q) Screening Forms) for the Callaway Plant RERP, Revision 55.

Revision 55 ofthe RERP reflects changes recently approved by the NRC as well as changes that did not require NRC approval. The changes that required NRC approval were previously determined to constitute a reduction in effectiveness of the RERP such that approval of those changes was requested in accordance with 10 CFR 50.54(q)(4). They were approved via Amendment 23 1 to the Callaway Operating License, as transmitted via NRC letter dated February 24, 2023 (ADAMS Accession Number ML22361A070). Revision 55 ofthe RERP reflects implementation ofthose approved changes. The changes that were determined to not constitute a reduction in effectiveness ofthe RERP are hereby provided pursuant to 1 0 CfR 50.54(q)(5). As previously noted, they are included in the enclosed RERP revision (which is supported by the PRF, Summary of Changes, and Analysis provided in Enclosure 2).

The RERP, as revised, continues to meet the standards of 1 0 CFR 50.47(b), Appendix E to Part 50 of the Code of Federal Regulations, and the requirements of 1 0 CFR 5 0.54(q).

This letter does not contain new commitments.

Ifthere are any questions, please contact John Bassford at 3 14-974-8945 or Daniel Harris at 573-676-8504.

83 15 County Road 459 Steedman, MO 65077 AmerenMissouri.com

ULNRC-06806 April 12, 2023 Page2of4 Sincerely, Todd A. Witt Manager, Regulatory Affairs Executed on: -/-zc-

Enclosures:

1) Callaway Plant Radiological Emergency Response Plan (RERP), Revision 55
2) Procedure Review Form (PRF), Summary of Changes and Analysis to the Callaway Plant RERP, Revision 55

ULNRC-06806 April 12, 2023 Page3of4 cc: Mr. Robert Lewis Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission

$201 NRC Road Steedman, MO 65077 Mr. Mahesh Chawla Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop O$B1A Washington, DC 20555-0001 Senior Emergency Preparedness Analyst U.S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511

ULNRC-06806 April 12, 2023 Page4of4 Index and send hardcopy to QA File A160.0761 Hardcopy:

Certrec Corporation 6500 West Freeway, Suite 400 FortWorth,TX 76116

( Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)

Electronic distribution for the following can be made via RERP ULNRC Distribution:

F. M. Diya K. C. Scott D. E. Farnsworth B. L. Jungmann D. T. Harris T. A. Witt T. B. Elwood NSRB Secretary STARS Regulatory Affairs Mr. Jay Silberg (Pillsbury Winthrop Shaw Pittrnan LLP)

Ms. Claire Eubanks (Missouri Public Service Commission)

Mr. Jason Davenport, REP Manager (SEMA)