ULNRC-05135, Nuclear Property Insurance Reporting

From kanterella
(Redirected from ULNRC-05135)
Jump to navigation Jump to search
Nuclear Property Insurance Reporting
ML050910137
Person / Time
Site: Callaway Ameren icon.png
Issue date: 03/21/2005
From: Keith Young
AmerenUE, Union Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ULNRC-05135
Download: ML050910137 (3)


Text

Union Electric One Ameren Plaza 1901 Chouteau Avenue PO Box 66149 St. Louis, MlO 631666149 314.52132 March 21, 2005 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop P1-137 Washington, DC 20555-0001 Ladies and Gentlemen: ULNRC-05 135 DOCKET NUMBER 50-483 WAmeren CALLAWAY PLANT UFE UNION ELECTRIC COMPANY NUCLEAR PROPERTY INSURANCE REPORTING In accordance with established federal nuclear property insurance reporting requirements (10 CFR 50.54(w)) the attached report provides the present level of insurance and the sources of the insurance which are applicable to the Callaway Plant.

Sincerely, M gith D. Young Manager, Regulatory Affairs DJW/jdg Attachment YSIO1 asubsidiary olAmeren Corporation

ULNRC-05135 March 21, 2005 Page 2 cc: U.S. Nuclear Regulatory Commission (Original and 1 copy)

Attn: Document Control Desk Mail Stop P1-137 Washington, DC 20555-0001 Mr. Bruce S. Mallett Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Jack N. Donohew (2 copies)

Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 7E1 Washington, DC 20555-2738 Missouri Public Service Commission Governor Office Building 200 Madison Street PO Box 360 Jefferson City, MO 65102-0360

UNION ELECTRIC COMPANY - CALLAWAY PLANT NUCLEAR PROPERTY INSURANCE - April 1, 2005 10 CFR 50.54(W) REPORTING REQUIREMENTS In accordance with established federal nuclear property insurance reporting requirements [10 CFR 50.54(W)], this is to advise that on April 1, 2005, Union Electric Company will have in force the below listed coverages which are applicable to its Callaway Nuclear Plant.

1. Primary Nuclear Property Insurance
a. Nuclear Electric Insurance, Ltd. $ 500,000.000
2. Excess Nuclear Property Insurance
a. Nuclear Electric Insurance, Ltd. $2,250,000.000 Grand Total $2,750,000,000 Ma E. Blair Managing Supervisor MEB/bjI