ULNRC-04158, Transmittal of Figure 14.9, Callaway Plant Pressure and Temperature Limits Report (Ptlr), Rev. 3

From kanterella
(Redirected from ULNRC-04158)
Jump to navigation Jump to search
Transmittal of Figure 14.9, Callaway Plant Pressure and Temperature Limits Report (Ptlr), Rev. 3
ML052520095
Person / Time
Site: Callaway Ameren icon.png
Issue date: 08/31/2005
From: Keith Young
AmerenUE
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ULNRC-04158, ULNRC-05199
Download: ML052520095 (2)


Text

Union Electric One Arneren Plaza 1901 Chouteau Avenue PO Box 66149 St. Louis, MIO 63166-6149 314.621.3222 August 31, 2005 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop P1-137 Washington, DC 20555-0001 Ladies and Gentlemen: ULNRC-05 199 CALLAWAY PLANT DOCKET NUMBER 50-483 wAmeren FIGURE 14.9 CALLAWAY PLANT UE PRESSURE AND TEMPERATURE LIMITS REPORT

Reference:

ULNRC-04158, dated December 3, 1999 The referenced letter transmitted Figure 14.9, Callaway Plant Pressure and Temperature Limits Report (PTLR), Revision 0, to the NRC. The PTLR was subsequently approved on March 24, 2000 as Amendment 134 to the Callaway Operating License. The PTLR has been revised to Revision 3. Revision 3 incorporates information contained in the Westinghouse test report WCAP-15400, Revision 0, "Analysis of Capsule X from the AmerenUE Callaway Unit 1 Reactor Vessel Radiation Surveillance Program".

Attached is the current PTLR, Revision 3. Revision 3 is provided to the NRC staff in accordance with the requirements of Technical Specification (TS) 5.6.6.c. Prior PTLR revisions were processed in accordance with the approved methodology, but were not formally transmitted to the NRC. Future revisions to the PTLR will be transmitted to the NRC in accordance with TS 5.6.6.c.

-Ifthere are questions or additional information is required, please contact us.

Sincerely, Maar RekhlD.aYo$ng

/ Manager, Regulatory Affairs DJW/jdg

Attachment:

Figure 14.9, Callaway Plant Pressure and Temperature Limits Report, Revision 3 A3(0 I asubsidiary olAmeren Corporation

ULNRC-05199 August 31, 2005 Page 2 cc: Mr. Bruce S. Mallett Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Jack N. Donohew (2 copies)

Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 7E1 Washington, DC 20555-2738 Missouri Public Service Commission Governor Office Building 200 Madison Street PO Box 360 Jefferson City, MO 65102-0360 Mr. Ron Reynolds Director Missouri State Emergency Management Agency PO Box 116 Jefferson City, MO 65102