U-601962, Forwards Monthly Operating Rept for Mar 1992 for Clinton Power Station,Unit 1.Corrected Values for Gross Electrical Energy Generated for Months of Jul 1987 & Jan & Oct 1988 Stated

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Mar 1992 for Clinton Power Station,Unit 1.Corrected Values for Gross Electrical Energy Generated for Months of Jul 1987 & Jan & Oct 1988 Stated
ML20095A981
Person / Time
Site: Clinton Constellation icon.png
Issue date: 04/15/1992
From: Spangenberg F
ILLINOIS POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20095A983 List:
References
U-601962, NUDOCS 9204210242
Download: ML20095A981 (2)


Text

.#

111:ncis Power Company Clinton Power Staton

,- P O. Box 678 Chnton IL61727 Tel 217 935-6881 t

U-601962 POWER t30-92 co4 -15 3 -1.P 8E.100c April 65, 1992 10CFR50.36 Docket No. 50-461 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Subj ec.t : Clinton Power Station, Unit 1 Facility Operating License NPF-62 March 1992 Monthly Goeratinn Repott

Dear Sir:

Please find !n Attachment 1 the Monthly Operating Report for Clf.nton Power Station, Unit 1, for the period ending March 31, 1992.

In addition. during a revie7 of previous D nthly Power Plant 3 Reports (Form ETA-759) submitted to the Department  ? Energy to support filing of a refund / credit request pursuant to the final rule on spent nuclear fuel fees paid, it was identified that three previously submitted monthly operating reports for Clinton Power Station contained minor errors. Specifically, the gross electrical energy generated (MWH)

(Attachment 1, line 10) for the month of July 1987 was reported as 169,495. This value should have been 169,494. The net electrical energy generateo (MWH) (Attachment 1, l ine 11) for the month of January 1988 was reported as 649,954. This value thould have been 649,955.

These two errors were determined to be caused by recording, errors.

Further, the net electrical energy generated (MVH) (Attachment 1, line

11) for the month of October 1988 was reported as 640,748. This value should have been 640,768. This latter error was determined to be caused by drift of the meters used to measure station use when the plant is off-line. This measured station use should not have been subtracted since the plant was on-line the entire month of October 1988. These errors 'sve been corrected and the corrected values are reflected in this rc,, ort. As the cumulative plant data is based on plant operation subsequent to November 24, 1987, the July 1987 error identified abovo had no impact on the values reported subsequent to November 24, 1987.

Sincerely yours, F. A. Sp igenbeh g, III Menager - Licensing and Safety l

9204210242 920415 PDR R

ADOCK 05000461 PDR 7

[ '

\

l

. - . . - . . . ~ . ~ . ... - ..-. . - ~. ... . . - . . -

'U 601962 L30 92(04 -15 )~-LP

'-. BE.100c

, DAS/alh Attachment-Lee: NRC Region III Regional Administrator NRC Resident Office Illinois Department of Nuclear safety v

e

+

5 1

f 4

e d

r,, , m--,, .m