_ - _ - _ _ _ _

Attachment 1 to U-601962 Page 1 of 4 CHALLENGES TO MAIN STEAM SAFETY / RELIEF VALVES Month March 1992 None

(

Y 9204210244 920415 PDR ADOCK 05000461 R PDR

. . . - ... .. .. . . _ . . . . ~ - - - . . ,

.. Attaciunent I to U 601962 Page 2 of 4  ;

AVERAGE DAILY UNIT POWER-LEVEL

(

DOCKET NO. 50-461 UNIT Clinton 1 DATE 03/31/92 C0hri.ETED BY F. A. Soaneenbere. III i;LEPHONE _{,217) 935-8881 X3400 MONTH March 1992-DAY' AVERAGE' DAILY-POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Nut) 1 0 17 0 2 0  ; 18 0 ,

3 0 19 0 4- 0' 20 0 5 0 21 ,_ 0 6 0 22 0

.7 0 ._

23 0 0 24 0 4 0~ 25 0

[-

10 0- 26 0 11 --- 0- 27 0

.12 -

0 28 _ 0 131 -0 2 9 ,, 0 14 0 30 0 15 'O 31 0

j. 16 0 -

r i;-

i l'

I-l-

=

a- ,

Attachment l' to U-601962 Page 3 of 4

, OPERATING DATA REPORT DOCKET NO. 50-461 UNIT Clinton 1 DATE 03/31/92 COMPLETED BY F. A. S pan cenbe rr. . III TELEPHONE (217) 935-8881 X3400 OPERATING STATUS l' . REPORTING PERIOD: March 1992 GROSS HOURS IN REPORTING PERIOD: 744

2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2894 MAX. DEPEND.-CAPACITY (MDCj (MWe-Met): 930 DESIGN ELECTRICAL RATING (MWe-Net): 933
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None-
4. REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMULATIVE
5. -NUMBER GF HOURS REACTOR WAS CRITICAL. . 0.0 1.112.3 25.560.6
6. REACTOR RESERVE SHUTDOWN HOURS.. .. . 0.0 0.0 0.0
7. . HOURS GENERATOR ON LINE.......... ... 0.0 1.092.4 24 721.5
8. UNIT RESERVE SMUTDOWN HOURS........... 0.0 0.0 0.0
9. GROSS THERMAL ENERGY GENERATED (HWH)... 0.0 2.952.853 63.711.586 10, GROSS ELECTRICAL ENERGY CENERATED (MWH) 0.0 977.084 21.054.174
11. N3T ELECTRICAL ENERGY GENERATED (MWH).. 0.0 928.132 19.979.530
12. AEaCTOR SERVICE FACTOR. . . ........ 0.0% 50.9% 67.0%
13. 2.%.CTOR AVAILABILITY FACTOR.... ....... 0.0% 50.9% 67.0%

l.

14. UNIT SERVICE FACTOR....... . . . 0.0% 50,0% 64.8%
15. . UNIT AVAILABILITY FACTOR... ........... 0.0% 50.0% 64,8%
16. UNIT CAPACITY'FACIOR (Using MDC). . . 0.0% 45.7% 56.3%

-17. UNIT CAPACITY FACTOR (Using Design MWe) C.0% -45.51 56.1%

f l- -18. UNIT FORCED OUTAGE RATE. . ... . ......__ 0.0% 24.1% __ 14.5%

19. --SHUTDOWNS. SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, DURATION OF EACH):

The third refueling outage' began March 1, 1992 and was scheduled to last approximately 70 days.

20, IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

The third refueling outage is currently estimated to be completed on May 18, 1992.

i l-

Attachment ~1 * ,

to U-601962-Page 4 of 4 - . -

4

' UNIT SHUTDOWNS AND POWER REDUCTIONS '

. DOCKET NO. 50-461 UNIT Clinton 1 l DATE 03/31/92 COMPLETED BY F. A. Spantenberg. III I

TELZPh0NE .(217; 935-8881 X3400

REPORT MONTH March 1992 l

l l '

METHOD OF l- TYPE SHUTTING DOWN i F: FORCED DURATION THE REACTOR OR CORRECTIVE ACTIONS l NO. DATE S: SCHEDULED (HOURS) REASON (1) REDUCING POWER (2) / COMMENTS 92-02 920227 S 744.0 C: Subsequent to the 4: Plant shut- The plant remained automatic reactor scram down shut down for the on 920227, the plant continued planned refueling began the planned third from previous. outage.(RF-3).

refueling outage (RF-3) reporting at 0011 hours1.273148e-4 days <br />0.00306 hours <br />1.818783e-5 weeks <br />4.1855e-6 months <br /> on 920301. period.

l l

(1) Reason A-Equipment Failure (explain), B-Maintenance or Test, C-Refueling, D-Regulatory Restriction.

l E-Operator Training & License Examination, F-Administrative, G-Operational Error (explain),

l H-Other (explain)

(2) Method 1-Manual, 2-Manual Scram, 3-Automatic Scram, 4-Other (explain) l l

m _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ - _