Pages that link to "Thomas Summers"
Jump to navigation
Jump to search
The following pages link to Thomas Summers:
Displayed 50 items.
- IR 05000250/2017405 (← links)
- IR 05000250/2017404 (← links)
- IR 05000250/2016405 (← links)
- IR 05000250/2016404 (← links)
- IR 05000346/2014005 (← links)
- IR 05000346/2014003 (← links)
- ML17032A279 (← links)
- ML17116A625 (← links)
- ML16303A002 (← links)
- ML16104A446 (← links)
- ML16041A128 (← links)
- ML16010A001 (← links)
- ML18110A903 (← links)
- ML18137A429 (← links)
- L-2016-128, Turkey Point Nuclear Plant, Units 3 and 4 - License Amendment Request 245, Change to the Technical Specifications to Address an Inoperable Steam Supply for the Auxiliary Feedwater Pumps (← links)
- ML18239A458 (← links)
- ML16292A828 (← links)
- L-2017-069, Special Report - Containment Tendon Corrosion Protection Medium Volume Reduction (← links)
- L-2017-028, Submittal of Special Report of Containment Tendon Corrosion Protection Medium Volume Reduction (← links)
- L-2016-178, Submittal of Cycle 29 Refueling Outage Steam Generator Tube Inspection Report (← links)
- L-2016-081, Core Operating Limits Report (← links)
- L-2015-200, FPL Records - Letters L-2003-255 and L-2013-218 (← links)
- L-2017-168, Response to Fourth Request for Additional Information Regarding License Amendment Request 236, Revision to the Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed.. (← links)
- L-2017-188, Supplemental Information for License Amendment Request 255, Relocate the Explosive Gas Monitoring, Gas Decay Tanks and Standby Feedwater System Technical Specifications to Licensee Controlled Documents (← links)
- L-2017-151, Response to Request for Additional Information Regarding License Amendment Request 249: Elimination of Certain Technical Specification Reporting Requirements, Revised Action for Emergency Core Cooling System, and Changes. (← links)
- L-2017-110, License Amendment Request 255, Relocate Explosive Gas Monitoring, Gas Decay Tanks and Standby Feedwater System Technical Specifications to Licensee Controlled Documents (← links)
- L-2017-098, Supplement to Florida Power & Light Company Letter L-2017-049, Response to Request for Additional Information Regarding License Amendment Request 246, Changes to Technical Specifications 3/4.7.5, Control... (← links)
- L-2017-086, Response to Request for Additional Information Regarding License Amendment Request 250, Modify Technical Specifications for Auxiliary Feedwater Actuation on Bus Stripping and on Trip of All Main Feedwater Pump Breakers (← links)
- L-2017-063, Response to Third Request for Additional Information Regarding License Amendment Request 236, Revision to the Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide ... (← links)
- L-2017-060, License Amendment Request 249: Elimination of Certain Technical Specification Reporting Requirements, Revised Action for Emergency Core Cooling System, and Changes to Administrative Technical Specifications (← links)
- L-2017-049, Response to Request for Additional Information Regarding License Amendment Request 246, Changes to Technical Specifications 3/4.7.5, Control Room Emergency Ventilation System (CREVS) (← links)
- L-2017-006, Supplement to License Amendment Request 236, Revision to the Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b. (← links)
- L-2016-221, License Amendment Request 242, Changes to Snubber Surveillance Requirements, Snubber Testing Program Plan - Fifth Inspection Inter-Val, Supplement (← links)
- L-2016-204, Response to Request for Additional Information 7 Regarding License Amendment Request 242, Changes to Snubber Surveillance Requirements, Snubber Testing Program Plan - Fifth Inspection Interval (← links)
- L-2016-183, Supplemental Information for License Amendment Request 246, Changes to Technical Specification 3/4.7.5, Control Room Emergency Ventilation System (CREVS) (← links)
- L-2016-172, Response to Request for Additional Information Regarding License Amendment Request 242, Changes to Snubber Surveillance Requirements, Snubber Testing Program Plan - Fifth Inspection Interval (← links)
- L-2016-136, Second Response to Request for Additional Information Regarding License Amendment Request 236, Revision to the Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide... (← links)
- L-2016-161, Documentation of Response to Request for Request for Additional Information Regarding the Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) (← links)
- L-2016-141, Response to Request for Additional Information on Fifth Ten-Year Lnservice Inspection (Isi) Interval Relief Request No. 4 (← links)
- L-2016-068, Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Submittal of FLEX Final Integrated Plan (← links)
- L-2016-116, Response to Request for Additional Information Regarding License Amendment Request 236, Revision to TS to Adopt Risk Informed Completion Time TSTF-505, Revision 1,Provide Risk-Informed Extended Completion Times. (← links)
- L-2016-080, Transmittal of 10 CFR 50.46, Acceptance Criteria for Emergency Core Cooling Systems in Light Water Nuclear Power Reactors - 2015 Annual Report (← links)
- L-2016-058, Licensee Qualification for Performing Dynamic Rod Worth Measurement Analysis (← links)
- L-2016-066, NRC Bulletin 2012-01, Design Vulnerability in Electric Power System (← links)
- L-2016-056, Response to Request for Additional Information Regarding License Amendment Request 240, Conditional Exemption from End-of-Life Moderator Temperature Coefficient Measurement (← links)
- L-2016-029, Submittal of Radioactive Effluent Release Report for 2015 (← links)
- L-2016-053, NRC Regulatory Issue Summary 2015-05, Preparation and Scheduling of Operator Licensing Examinations-Updated Response (← links)
- L-2016-002, Final Compliance in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) (← links)
- L-2015-275, Fifth Ten-Year Inservice Inspection (Isi), Response to Request for Additional Information (RAI) for Relief Request No. 2 (← links)
- L-2015-224, Fifth Ten-Year Interval Inservice Testing (IST) Program, Relief Request No. PR-02 (← links)