Submittal of Updated Final Safety Analysis Report - Unit 4 Cycle 28 Update and License Renewal Report
ML16330A177
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 10/29/2016
From: Summers T
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML16330A191 List:
References
L-2016-198
Download: ML16330A177 (3)


Text

U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Updated Final Safety Analysis Report -Unit 4 Cycle 28 Update and License Renewal 10 CFR 54.37(b) Report 10 CFR §50.71(e)

L-2016-198 October 29, 2016 Florida Power & Light Company (FPL) has completed the Unit 4 Cycle 28 ( 4C28) update of the Turkey Point Units 3 and 4 Updated Final Safety Analysis Report (UFSAR) and its review of design activities to identify any new systems, structures, and components for potential impact on its license renewal aging management programs.

This letter submits both the periodic update of the UFSAR and the results of the license renewal review in accordance with the requirements of 10 CFR 50.71(e) and 10 CFR 54.37(b), respectively.

  • The enclosed DVD accurately reflects plant changes made since the previous update (Unit 4 Cycle 27). This update incorporates changes for the period covering October 22, 2014 through April 29, 2016. Miscellaneous user comments obtained during this period have also been incorporated.

The Turkey Point UFSAR is maintained as an electronic "living" document.

Changes are made as they meet appropriate incorporation requirements enhancing our ability to maintain the Turkey Point licensing basis current. This UFSAR update is a snapshot of our continually revised UFSAR. Accordingly, Turkey Point identifies periodic UFSAR updates required by 10 CFR 50.71(e) as Unit 4 cycle-specific updates, consistent with our existing UFSAR update commitment linked to completion of each Unit 4 refueling outage (10 CFR 50.71(e)(4) exemption dated July 16, 1998). Revised pages are annotated in the lower right comer by dates ranging throughout the update period, based on the date the changes on each page were incorporated.

The cycle designator (C28) is provided with the revision bar to identify changed portions.

A single DVD containing this document is submitted in lieu of hard copies, consistent with previous UFSAR updates (fast submitted on April 22, 2015). This UFSAR supersedes all previous copies of the document.

It is labeled "Turkey Point UFSAR 4C28." Florida Power & Light Company 9760 SW 344th Street, Homestead, FL 33035 Florida Power & Light Company Turkey Point Nuclear Plant File counts are as follows: L-2016-198 UFSAR Update Unit 4 Cycle 28 Page 2of3 22 UFSAR Files (includes Start file), publicly available.

The UFSAR Data files are itemized as follows: LOEP.pdf 001 CHAPTER _l .pdf 002CHAPTER

_ 2.pdf 003CHAPTER_3.pdf 004CHAPTER

_ 4.pdf 005CHAPTER_5.pdf 006CHAPTER

_ 6.pdf 007CHAPTER_7.pdf 008CHAPTER

_ 8.pdf 009CHAPTER

_9 .pdf 01OCHAPTER_1 O.pdf 011CHAPTER_11.pdf 012CHAPTER

_ 12.pdf 013CHAPTER

_ 13 .pdf 014CHAPTER

_ 14.pdf 015CHAPTER

_ 14A _ G.pdf 016CHAPTER

_ 15 .pdf 017CHAPTER_16.pdf 018A_A.pdf 019A_B.pdf App9.6a.pdf Start.pdf 128 KB 3,640 KB 2,334 KB 14,112 KB 2,311 KB 39,471 KB 2,708 KB 6,962 KB 1,347 KB 2,737 KB 226 KB 1,599 KB 67 KB 29 KB 30,379 KB 4,008 KB 14 KB 205 KB 68 KB 31 KB 32 KB 9,970 KB The entire UFSAR is PDF Normal; therefore, the full text index should be considered highly reliable.

It is recommended that the UFSAR be opened via launching the "start.pdf' file. Thereafter, all chapter navigation can be done within Acrobat Reader. License Renewal 10 CFR 54.37(b) Report The license renewal review addressed the requirements of 10 CFR 54.37(b) for the current UFSAR Update period October 22, 2014 through April 29, 2016. The review effort included items noted in the NRC Regulatory Issue Summary (RIS) 2007-16, Revision 1, "Implementation of the Requirements of 10 CFR 54.37(b) for Holders of Renewed Licenses," as well as UFSAR revised text, plant changes/modifications installed, and other pertinent documents and correspondence.

Florida Power & Light Company Turkey Point Nuclear Plant L-2016-198 UFSAR Update Unit 4 Cycle 28 Page 3of3 This review did not result in any newly identified systems, structures, and components per the requirements of 10 CFR 54.37(b).

If you have any questions, please contact Mr. Mitch Guth, Licensing Manager, at 305-246-6698.

Sincerely, Vice President Turkey Point Nuclear Plant

Enclosure:

DVD, Turkey Point UFSAR 4C28 cc: Regional Administrator-USNRC Region II (letter only) USNRC Senior Resident Inspector

-Turkey Point (letter only) USNRC Project Manager -Turkey Point