L-2017-018, Withdrawal of License Amendment Request Change to P /T Limit Curve and LTOP Period of Applicability

From kanterella
Jump to navigation Jump to search

Withdrawal of License Amendment Request Change to P /T Limit Curve and LTOP Period of Applicability
ML17037A080
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 02/03/2017
From: Summers T
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2017-018
Download: ML17037A080 (1)


Text

  • l=PL.

U. S. Nuclear Regulatory Commission FEB 0 3 2017 L-2017-018 10 CFR 50.90 Document Control Desk Washington, DC 20555-0001

Subject:

St. Lucie Unit 2 Docket No. 50-389 Renewed Facility Operating License NPF-16 Withdrawal of License Amendment Request Change to P /T Limit Curve and LTOP Period of Applicability

References:

1. FPL Letter L-2015-160 dated May 21, 2015, "Reactor Vessel Smveillance Capsule 97 Degree Report Submittal."
2. FPL letter L-2916-227 dated December 22, 2016, "License Amendment Request Change to P /T Limit Cu1ve and LTOP Period of Applicability."

In Reference 1, FPL submitted the results of the reactor vessel smveillance capsule 97 degree smveillance as required by 10 CFR 50, Appendix H. As stated in that submittal, the current Technical Specification Pressure/Temperature (P /T) limit cu1ves and Low Temperature Overpressure Protection (LTOP) analyses remain conservative and valid up to 31.98 effective full power years (EFPY) of operation. In Reference 2, FPL submitted a license amendment request to update the current P /T limit curves and LTOP setpoints with the revised applicability period of 31.98 EFPY.

Based upon subsequent discussion with staff, FPL hereby withdraws the license amendment. The current Technical Specification P /T limit cmves and LTOP setpoints will not require revision until 31 .98 EFPY.

The new Technical Specification P /T limit cmves and LTOP setpoints will be submitted for NRC review and approval prior to the end of 31. 98 EFPY. The current cmves and setpoints are applicable until approximately May 2021, and FPL is targeting early 2020 for the Technical Specification submittal.

If you should have any questions, please contact Mr. Mike Snyder at [172) 467-7036.

Sincerely, Thomas Summers South Region Vice President St. Lucie Plant cc: NRC Region II Administrator St. Lucie Plant NRC Senior Resident Inspector Ms. Cynthia Becker, Florida Department of Health Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957