ML15280A010

From kanterella
Jump to navigation Jump to search

Response to NRC Request for Information, Per 10 CFR 50.54(f) Regarding Recommendation 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident, Emergency Preparedness - Phase 2 - SGI-Staffing..
ML15280A010
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 09/28/2015
From: Summers T
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-20l5-256
Download: ML15280A010 (2)


Text

'*-

. - -** -- . -*~

W~~~l:J!l-IOF!JZED DISCLOSURE IS PROHIBITED Sfa_,ifuN i47 ATOMJG ENERGY Af~T 1g54 ."

AND iO CFR 73.21 VIOLA.T!fiNC:: s{p:ijFCT l SEP 2 a* 2015

_ ,.uv~irmi

-~~ Document Ha!3 &an l.E-Sierm.ined to Contain S&feguards Information By U. S. Nuclear Regulatory Commission Attn: Document Control Desk

.Washington, DC 20555-0001 ~"' ~~,.~_L[~J:t~-r_~J.i a.me and k'osxhon) *

. . Florid?" Power and I.ight Company Turkey Pomt Umts 3 and 4 .Nuclear Energy; Date of Docket Nos. 50-250 and 50-251 Document or Determination ~~f!?J.Z/~ PCR<.,1.-z,_

Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident, Emergency Preparedness - Phase 2 -SGI-Staffmg Assessment

References:

(1) NRC Letter, RequeSt for Information Pursuant to Tit(e 10 of the Code ofFed~ral Regulation~ 50.54(f)

Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident, dated March 12, 2012,
ML12053A340.

(2) FPL letter, :rvt Kiley (FPL) to NRC (L-2012-208), "60-Day Re.spouse to NRC Letter, "Request for

. Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(t) Regarding

  • Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Force Review of Insights from the Fukus~_ima Dai-i~hi *A.ccident.'._dated March l~, 2012," Accession No ML12144A158,_ May 10, 2012.

(3) NEf 12-01, "Guideline for Assessing Beyond Design Basis Accident Response Staffmg and

  • Communications Capabilities," Revision 0, dated.May 2012, :ML12110A204.

(4) NRC Letter, "U.S. Nuclear Regulatory Commission Review ofNEI 12-01, 'Guideline for Assessing

  • Beyond Design ~asis Accident Response Staffing and Communications Capabilities,' Revision 0, dated May 2012, dated May 15, 2012, :ML12131A043.
  • (5) NRC memorandum issued on March 13, 2013, "Summary of February 19, 2013, Public Meeting.to Discuss Framework of Phase 1 Staffing Submittals-Related to Issues Associated with Near-Term Task Force Recommendation 9.3" (6) FPL Letter, T. Summers (FPL) to NRC (L-2015-254), "Respons~ to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accid~nt, E,mergency.Preparedness-Phase 2- Staffmg Assessment."

On March 12, 2012, the NRC staff issued Reference 1 to all power reactor licensees and holders of*

construction permits in active or deferred status. Enclosure 5 of Reference 1 contains the specific.

Requested Actions, Requested Information, and Required Response associated with Recommendation 9 .3

submit a written response to the information requests within 90 days. {J!fj ('C:

SAFEGUARDS INFORMATION (Attachment contains Safeguards Information. Upon separation this page is decontrolled.) Sob/

µet_

Florida Power & Light Company 9760 S.. W. 344th Street Homestead, F~ 33035.

_4__Total pages

L-2015-256 Page?

SAFEGUARDS INFORMATION In accordance with Reference 1, Enclosure 5, Florida Power and Light Company (FPL) submitted for Turkey Poi.nt Units 3 and 4,. an alternative course of action for performing the requested actions and providing the requested information (Reference 2). Enclosure 1 of Reference 2 described the alternative course of action and schedule for responding to the Emergency Preparedness - Staffing, Requested Information.

The Reference 3 guideline was developed by the Nuclear Energy Institute (NEI) for the performance of communications and staffing assessments associated with a response to a beyond design basis external event. This NEI guideline was endorsed by the NRC in Reference 4.

Reference 6 pr9vided the FPL Turkey Point Phase i Staffing Assessment Report. As discussed in Reference 5, FPL provided the non-SGI Turkey Point responses to staffing assessment questions related to use of the security personnel during a beyond design bases event in the Enclosure of Reference 6.

The Attachment to this letter provides the FPL Turkey Point Units 3 and 4 Phase 2 Staffing Assessment Report, .Safeguards portion of the responses to staffing assessment questions related to the use of security personne~ during a beyond design bases event.

  • The Attachment contaJns Safeguards Information that must be protected from public disclosure as required by 10 CFR 73 .22, "Protection of Safegtiards Information: Specific Requirements."

If you have any questions or require additional infonnation, please contact Mr. Timothy Ee~

Security Manager at 305 246-6605.

I declare under penalty of,.perjury that the foregoing is true and correct.

Executed on September~ 2015 .

  • Sincerely,

. --l~~**~

kasSummers Site Vice President Turkey Point Nuclear Plant

  • Attachpient cc: USNRC Regional Administrator, Region IT USNRC Project Manager, Turkey Point Nuclear Plant .

USNRC Senior Resident Inspector, Turkey Point Nuclear Plant SAFEGUARDS INFORMATION (Attachment contains Safeguards Infonnation. Upon separation this page is decontrolled.)

. - -** -- . -*~

W~~~l:J!l-IOF!JZED DISCLOSURE IS PROHIBITED Sfa_,ifuN i47 ATOMJG ENERGY Af~T 1g54 ."

AND iO CFR 73.21 VIOLA.T!fiNC:: s{p:ijFCT l SEP 2 a* 2015

_ ,.uv~irmi

-~~ Document Ha!3 &an l.E-Sierm.ined to Contain S&feguards Information By U. S. Nuclear Regulatory Commission Attn: Document Control Desk

.Washington, DC 20555-0001 ~"' ~~,.~_L[~J:t~-r_~J.i a.me and k'osxhon) *

. . Florid?" Power and I.ight Company Turkey Pomt Umts 3 and 4 .Nuclear Energy; Date of Docket Nos. 50-250 and 50-251 Document or Determination ~~f!?J.Z/~ PCR<.,1.-z,_

Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident, Emergency Preparedness - Phase 2 -SGI-Staffmg Assessment

References:

(1) NRC Letter, RequeSt for Information Pursuant to Tit(e 10 of the Code ofFed~ral Regulation~ 50.54(f)

Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident, dated March 12, 2012,
ML12053A340.

(2) FPL letter, :rvt Kiley (FPL) to NRC (L-2012-208), "60-Day Re.spouse to NRC Letter, "Request for

. Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(t) Regarding

  • Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Force Review of Insights from the Fukus~_ima Dai-i~hi *A.ccident.'._dated March l~, 2012," Accession No ML12144A158,_ May 10, 2012.

(3) NEf 12-01, "Guideline for Assessing Beyond Design Basis Accident Response Staffmg and

  • Communications Capabilities," Revision 0, dated.May 2012, :ML12110A204.

(4) NRC Letter, "U.S. Nuclear Regulatory Commission Review ofNEI 12-01, 'Guideline for Assessing

  • Beyond Design ~asis Accident Response Staffing and Communications Capabilities,' Revision 0, dated May 2012, dated May 15, 2012, :ML12131A043.
  • (5) NRC memorandum issued on March 13, 2013, "Summary of February 19, 2013, Public Meeting.to Discuss Framework of Phase 1 Staffing Submittals-Related to Issues Associated with Near-Term Task Force Recommendation 9.3" (6) FPL Letter, T. Summers (FPL) to NRC (L-2015-254), "Respons~ to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accid~nt, E,mergency.Preparedness-Phase 2- Staffmg Assessment."

On March 12, 2012, the NRC staff issued Reference 1 to all power reactor licensees and holders of*

construction permits in active or deferred status. Enclosure 5 of Reference 1 contains the specific.

Requested Actions, Requested Information, and Required Response associated with Recommendation 9 .3

submit a written response to the information requests within 90 days. {J!fj ('C:

SAFEGUARDS INFORMATION (Attachment contains Safeguards Information. Upon separation this page is decontrolled.) Sob/

µet_

Florida Power & Light Company 9760 S.. W. 344th Street Homestead, F~ 33035.

_4__Total pages

L-2015-256 Page?

SAFEGUARDS INFORMATION In accordance with Reference 1, Enclosure 5, Florida Power and Light Company (FPL) submitted for Turkey Poi.nt Units 3 and 4,. an alternative course of action for performing the requested actions and providing the requested information (Reference 2). Enclosure 1 of Reference 2 described the alternative course of action and schedule for responding to the Emergency Preparedness - Staffing, Requested Information.

The Reference 3 guideline was developed by the Nuclear Energy Institute (NEI) for the performance of communications and staffing assessments associated with a response to a beyond design basis external event. This NEI guideline was endorsed by the NRC in Reference 4.

Reference 6 pr9vided the FPL Turkey Point Phase i Staffing Assessment Report. As discussed in Reference 5, FPL provided the non-SGI Turkey Point responses to staffing assessment questions related to use of the security personnel during a beyond design bases event in the Enclosure of Reference 6.

The Attachment to this letter provides the FPL Turkey Point Units 3 and 4 Phase 2 Staffing Assessment Report, .Safeguards portion of the responses to staffing assessment questions related to the use of security personne~ during a beyond design bases event.

  • The Attachment contaJns Safeguards Information that must be protected from public disclosure as required by 10 CFR 73 .22, "Protection of Safegtiards Information: Specific Requirements."

If you have any questions or require additional infonnation, please contact Mr. Timothy Ee~

Security Manager at 305 246-6605.

I declare under penalty of,.perjury that the foregoing is true and correct.

Executed on September~ 2015 .

  • Sincerely,

. --l~~**~

kasSummers Site Vice President Turkey Point Nuclear Plant

  • Attachpient cc: USNRC Regional Administrator, Region IT USNRC Project Manager, Turkey Point Nuclear Plant .

USNRC Senior Resident Inspector, Turkey Point Nuclear Plant SAFEGUARDS INFORMATION (Attachment contains Safeguards Infonnation. Upon separation this page is decontrolled.)