Pages that link to "Hinds J"
← Hinds J
Jump to navigation
Jump to search
The following pages link to Hinds J:
Displayed 50 items.
- ML20084U499 (← links)
- ML20084U462 (← links)
- ML20137B555 (← links)
- IR 05000455/1985027 (← links)
- IR 05000456/1987044 (← links)
- IR 05000454/1988006 (← links)
- IR 05000295/1987036 (← links)
- IR 05000454/1987043 (← links)
- ML20127D237 (← links)
- ML20148S102 (← links)
- ML20148R765 (← links)
- ML20148R368 (← links)
- ML20147C368 (← links)
- ML20140C534 (← links)
- IR 05000454/1988007 (← links)
- PNO-III-88-048, on 880520,full Power OL Issued.Currently at 8% Power,Licensee Engaged in Power Ascension Activities. NRR Region IV Will Provide Augmented Insp Coverage of Power Ascension (← links)
- ML20154J210 (← links)
- IR 05000295/1988016 (← links)
- IR 05000454/1988011 (← links)
- IR 05000295/1988009 (← links)
- IR 05000456/1988008 (← links)
- IR 05000457/1988012 (← links)
- IR 05000456/1988019 (← links)
- PNO-III-88-067, on 880722,controlled Shutdown Initiated to Repair Steam Leak.Unit Down for More than 48 H for Steam Leak Repair & Portions of Piping Which Exhibited Wall Thickness of Less than Three Inches.State of Il Notified (← links)
- IR 05000456/1988013 (← links)
- ML20151H568 (← links)
- IR 05000454/1988009 (← links)
- PNO-III-88-029, on 880402,shutdown Begun to Repair Steam Generator Tube Leak.Leakage Rate from RCS Into Secondary Sys Calculated to Be 330 Gallons Per Day.Other Maint & Testing Work Planned in Addition to Investigation & Repair (← links)
- IR 05000295/1988005 (← links)
- PNO-III-88-026, on 880323,licensee Began Orderly Shutdown of Unit 1 Due to Identified Deficiencies in Lubricant Used in motor-operated Limitorque Valves.Deficiencies Apply to 263 safety-related Valves in Both Units 1 & 2 (← links)
- IR 05000456/1988003 (← links)
- IR 05000483/1987036 (← links)
- PNO-III-88-011, on 880213,reactor Tripped from 100% Power Due to Main Turbine Trip.Safety Injection Sys Actuated Due to Low Steamline Pressure Signal.Relief Valve on Seal Leakoff Replaced W/Spare & Other Two Relief Valves Repaired (← links)
- IR 05000454/1988002 (← links)
- PNO-III-88-086, on 881016,reactor Automatically Shut Down Following Loss of Offsite power.Diesel-driven Auxiliary Feedwater Pumps Maintained Steam Generator Level.Caused by Explosion & Fire in Substation & Carboard in Delay Relay (← links)
- PNO-III-89-029, on 890418,Region III Operator Licensing Examiner Observed Individual with Eyes Closed in Chair in Unit 1 Cr.On 890419,licensing Examiner Observed Radiation Control Technician Asleep at Desk by RCA at Building Exit (← links)
- PNO-III-89-031, on 890423,licensee Shutdown Reactor Because Instrument Power Supply Was Found to Be Inoperable on 970422.Caused by Faulty Capacitor & Inverter Repaired & Returned to Svc on 890425 (← links)
- PNO-III-90-028, on 900410,dye Penetrant Testing on Inside of Reactor Vessel Head Identified 23 Cracks of Various Dimensions.Licensee Begun Repairing Cracks by Grinding Cracked Areas (← links)
- PNO-III-88-088, on 881025,unit Manually Tripped from 28% Power to Avoid Challenging Reactor Protection Sys.Caused by Low Steam Generator Water Levels.Unit Expected to Be Down from Five to Seven Days While Strainers Cleaned (← links)
- PNO-III-88-087, on 881025,licensee Determined That Neither of Two motor-driven Auxiliary Feedwater Pumps Would Automatically Start W/Loss of Offsite Power & lo-lo Steam Generator Level.Pumps Declared Inoperable (← links)
- IR 05000456/1988026 (← links)
- PNO-III-88-017, on 880308,unit Achieved Initial Criticality. Conditions at Criticality as Expected.Nrc Inspectors Monitored Preparation for Criticality.Ol Permitting Fuel Loading & Low Power Testing Issued on 871218 (← links)
- IR 05000295/1988012 (← links)
- IR 05000454/1988016 (← links)
- IR 05000295/1988013 (← links)
- IR 05000295/1987009 (← links)
- IR 05000456/1988028 (← links)
- IR 05000295/1988019 (← links)
- ML20206M136 (← links)
- IR 05000454/1988020 (← links)