Pages that link to "CP-85-39"
← CP-85-39
Jump to navigation
Jump to search
The following pages link to CP-85-39:
Displayed 28 items.
- ML20072S446 (← links)
- ML20137T251 (← links)
- ML20147H839 (← links)
- ML20147G500 (← links)
- ML20140D817 (← links)
- ML20154C283 (← links)
- ML20149M367 (← links)
- ML20195J038 (← links)
- ML20206D347 (← links)
- ML20207C553 (← links)
- IR 05000445/1989007 (← links)
- ML20235G428 (← links)
- ML20215D795 (← links)
- ML20211F546 (← links)
- ML20245G624 (← links)
- TXX-6940, Interim Deficiency Rept CP-85-35 Re Failure to Install Conduit Per Design Documents.Initially Reported on 860918. Evaluation Continuing.Next Rept Will Be Submitted by 880125 (← links)
- TXX-6726, Interim Deficiency Rept CP-85-39 Re Equipment Conduit Interface.Initially Reported on 860918.Evaluation Continuing.Next Rept Anticipated by 871113 (← links)
- TXX-6521, Interim Deficiency Rept CP-85-39 Re Conduit Not Installed in Accordance W/Design Documents.Initially Reported on 870918. Complete Evaluation Will Be Performed.Next Rept Will Be Submitted by 870915 (← links)
- TXX-6438, Interim Deficiency Rept CP-85-39 Re Failure to Install Equipment Conduit in Accordance W/Design Documents.Initially Reported on 860918.Evaluation of Condition Underway.Next Rept Will Be Submitted by 870622 (← links)
- TXX-4962, Interim Deficiency Rept CP-85-39 Re Improperly Installed Equipment Conduit Interface.Initially Reported on 850918. Evaluation Underway.Next Rept Will Be Submitted by 861010 (← links)
- TXX-6165, Interim Deficiency Rept CP-85-39 Re Conduit Not Installed in Accordance W/Design Documents.Initially Reported on 860918. Field Verification Effort Complete & Engineering Evaluation in Progress.Next Rept Will Be Submitted by 870212 (← links)
- TXX-6278, Interim Deficiency Rept CP-85-39 Re Equipment Conduit Not Installed in Accordance W/Design Documents.Initially Reported on 860918.Evaluation of Sample Results Adequacy to Entire Cable Population in Progress.Next Rept by 870515 (← links)
- TXX-4823, Interim Deficiency Rept CP-85-39 Re Conduit Not Installed Per Design Documents.Initially Reported on 850918.Review, Including Flexibility Problems of Conduit Between Raceway & Equipment,Continuing.Next Rept Expected by 860627 (← links)
- TXX-4878, Interim Deficiency Rept CP-85-39 Re Equipment Conduit Interface.Initially Reported on 850918.Next Rept Expected by 860815 (← links)
- TXX-6016, Interim Deficiency Rept CP-85-39 Re Conduit Not Installed in Accordance W/Design.Initially Reported on 850918.Possible Conduit Orientation Problems Studied.Cable Slack & conduit- to-equipment Studies Underway.Next Rept Expected by 861215 (← links)
- TXX-4699, Interim Deficiency Rept CP-85-39 Re Installation of Conduit to Equipment Which May Not Be Specified Per Design Documents.Initially Reported on 850918.Issue Expanded to Review Flexibility Problems.Next Rept by 860523 (← links)
- TXX-4589, Deficiency Rept SDAR-201 Re Installation of Conduit to Equipment Not Specified Per Design Documents.Initially Reported on 850918.Completion of Evaluation Anticipated by 851112 (← links)
- TXX-4615, Deficiency Rept SDAR-201 Re Installed Conduit to Equipment Interface Not Being Specified Per Design Documents.Initially Reported on 850918.Completion of Evaluation Expected by 860212 (← links)