Forwards Info Re Preparedness of Facility for Licensing. Encls 1-6 Include Items Requiring Insp & Resolution Before Recommendations for Licensing
ML20245G624
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 04/06/1989
From: Warnick R
Office of Nuclear Reactor Regulation
To: Charemagne Grimes
Office of Nuclear Reactor Regulation
Shared Package
ML20245G613 List:
References
FOIA-89-226 NUDOCS 8908160132
Download: ML20245G624 (36)


Text

~

-c . .. o .

b /  %,, unirro rrArts CC: D9M

! o NUCLEAR REGULATORY COMMIMif0N h , WASHINGTON, p. C. 20555 v '*%. +j' APR - 61989 MEMORANDUM FOR: C. I. Grimes, Director Comanche Peak Project Division Office of Nuclear Reactor' Regulation FROM: R. F..Warnick, Assistant Director for Inspection Programs Comanche Peak Project Division Office of Nuclear Reactor Regulation

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 STATUS OF PREPAREDNESS FOR LICENSING This memorandum is forwarded in accordance with MC 94300 to provide you information on the preparedness for licensing of Comanche Peak Steam Electric Station (CPSES), Unit 1. This is the second of approximately monthly status reports. Enclosures 1 through 6 include those items requiring inspection and resolution before the Comanche Peak Project Division can make a recommendation for licensing. We recognize the enclosures contain a high number of items remaining to be completed prior to fuel load. During the next few months, we plan to assess each item to determine which ones may appropriately be postponed until some later milestone such as prior to initial critical, prior to 100% power, during first refuelirg, etc.

Texas Utilities Electric Company (TUE) officially estimates a fuel load date of Jurse 1989; however, plant schedules identify October 2, 1989, as the fuel load date. We note that the utility schedute for fuel load has not slipped during the past approximately 9 months. CPPD considers October 1989 as a realistic time frame for a licensing decision, contingent upon satisfactory resolution of the issues presented in the enclosures to this memo.

l 1

8908160132 890810 PDR FOIA WILLIAMB9-226 PDR

. C/L-

f .~ . .

( .<

L "* C. I. Grimes, Director 2 APR - 6 Geg

?.

'.- . If you haya7any questions concerning this status report, please contact me,or;Mr. J. S. Wiebe of my staff.

l R F WM R. F. Warnick, Assistant Director for Inspection Programs l' Comanche Peak Project Division.

l~

Office of Nuclear Reactor Regulation

Enclosures:

1. Outstanding Items Including Enforcement and Unresolved Items
2. Preoperations and Acceptance Testing Status
3. Construction Status
4. Corrective Action Program Status
5. Status.of. Inspections. Required by MC 2512, Mc 2513, & MC 2514

$a.

c. . s .

i ENCLOSURE 1 Outstanding Items I. Open, Unresolved, and Enforcement Items Attachment 1 to Enclosure 1 is a list of all open, unresolved, and enforcement items that must be closed prior to fuel load.

There are 64 open items, 29 unresolved items, and 5'5 enforcement items that must be closed prior to fuel load.

II. Open Deficiency Reports - 10 CFR Part 50.55(e) Reports Attachment 2 to Enclosure 1 is a list of all Deficiency Reports that must be closed prior to fuel load.

There are 220 Deficiency Reports that must be closed prior to fuel load.

III. NRC Bulletins Attachment 3 to Enclosure 1 is a list of all Bulletins that must be closed prior to fuel load.

There are 41 Bulletins that must be closed prior to fuel load.

IV. Allegations There are currently 7 open allegations. It is expected that these allegations will be inspected prior to fuel load.

Closure of the allegations will depend on the outcome of the inspections and acceptance of the applicant responses or actions if any are required. The following allegations are open.

OSP-84-A-0017 OSP-84-A-0018 j

- OSP-87-A-0021 1 OSP-88-A-0024 OSP-88-A-0052 ,

OSP-88-A-0053 I OSP-89-A-0010 1

I I

j

.,' , , . H 1 ,

I l

  • . ) '

, , v. Safety IssuciManagement system (SIMS)

? Attachment 4 to

Enclosure:

1 is a list of SIMS items which must

-be closed prior to fuel' load (this list will be included in a future report). -

l VI. Applicant Identifed Activ;tties The applicant has identified.certain', activities required prior to exceeding various milestones. The; activities have been categorized by the applicant and are subject to change or reevaluation. This information-is correct as of 3/27/89.

Activities that Impact Heatup 130 Activities that Impact the Integrated i Leak Rate Test 45 '(

Actisities that Impact Fuel Load, criticality, and 5% Power 1578 Activities that Impact 100% Power and Commercial Operation 82 Activities that Impact First Refueling 182 Outage 1

l

t ,; ,  ;, .:

Jay ,

Page No. I i

~ 1J/27/ft

'QTIACNNENT 1 TO ENCLOSURE 1

[ OPEN, UNRE50 LYE 3, AND EIFORCENENT ITENS RE90!RINS RESOLIITION

i. , PR!0R TO rWEL LOAD SOURCE DESCRIPflaii T IftK RESP 83-14-0-N SolidNesteManapenent- Alt Dfil 83-33-0-23 Operabt!!ty of Portable Radies. For Contr Ross 6 Rmdng Oper. !!!V DRt3 83 33-0-45 Confire Net!%. For High Level Effluents During A Mll. RIV DRSS 83 4 0-57 Pine lodine Henitwo In APPO. Laergency Response Facilities RIV DRSS t_ $3-33-0 Comparison Of Primary And Beck- cp Meteorological Tower Data RIV DRSS 02 9 44 Sup!!ng n .snelysis of plant el fuenis.HURES-0737,ltes !!.F.1-2 RIV DRSS 84-P7 4-01 Pren de Proc Conts For 10CFR21 Tracking OSP OPS 84-16-V-01 64 Insp. of cable tray hangers did not identify improper install. OSP CONS 84-19-0-04 Persanent locurity Lock And Key Systes . RIV DRSS 64-22-U-M Battery room design questioned. relative to H2 buildup /entrapet OSP OPS 84-26-V-01-57 Inspection criteria was not pro vided in procedwes/specifica. OSP CONS 84-26-V-02-S7 Inspectise of Cah.ie fray Hanger a nas inadequate DSP CONS 84-31-U-09 Prsret For turnover Station Nod Pkg to OPS (SEE 85-08) DSP DPS 84-32 'l-02 64 Failure to regularly revien status & adequacy of SA progree DSP CONS 84-32-V-03-54 Failure to estab.6 leptesent planned & periodic audits. OSP CONS B4-36-0-04 Natural Circulation Test NURES 0797 Sec 5.4.3 OSP DPS 84-37-9-01 leproved locurity Communication Systee RIV DRSS Bb42-0-01 Verify San Effl Saaples Are Represent Of Bisch Volume RIV DRSS B4-43-0-01 Eval Handling of RAD Liquids During Accideht Conditicas RlY DRSS 84-45-0-01 Valve Line Up Errors and Doc of Deficiencies ISU 2064 DSP DPS B5-02-U-06 Follow Up on Diesel Air Relief Valve Failure 1CP-PT-29-03 REDO DSP OPS f*-13-0-14 Pipe support I-5-PSTN-17014AD 2 discrepancies. OSP CONS 85-13-0-1B Discrepancies in I-M-DUPL-U40 OSP CONS 95-13-0-20 1-M-DUPL-040 ass close to instr tubing support and had bent coe DSF CONS 95-13-0-44 1-5-LBSN-023 Eleven conditions identified as potential der. OSP CONS i

85-13-V-01-84 Failure to accomplish conduit i identification to provide DSP CONS

b. s v . . , .

l Page O. 2

("- 03/27/B9 AITACHMENT'lTOENCLOBUREI DPEN, UNRESOLVED, MD ENFORCEMENT ITEMS REBUIRINS RESOLUTION e , PRIORTOFUELLOAD p

SOURCE K BCRIPTION 07 ITEM REBP B5-14-0-15 Color Code Missing & Mas Distan ce between color code earts ses OSP CONS B5-14-D-1B Duct Flange Connecting Bolts ' bent in pactate I-M-DUPL-021. OSP CONS B5-14-0-27 Insufficient Clearance with 3 adjacent pipes & die out-of-tul DSP CONS B5-15-0-06 Inauquate sedical techniques usedduringenergencydrill RIV DRBS B5-15-0-08 Radio coeaunications garbled .and intermittent during drill RIV DRSS B5-15-0-09 Energ, drill critique did not fullyportrayinadequacies RIV DRSS B5-18-0-24 Required clearances not est bet noen pipes for pkg.1-R-SBCD-083 DSP CONS B5-!B-V-Il 54 No ID or color coding on cable trays. OSP CONS B5-18-V-15-64 5easures not established to ass ure performance of design adequ DSP CONS B6-04-V-02-87 EPA Drawings with Notes. OSP CON 3 86-09,A1.B.! Failure to sat. ein. separation requirements of IEEE standard. OSP C0rS 86-09,A 1.B.2 Design changes not properly rev leved for install.of reflective DSP CONS 66-09,A 1.B.7 Ccid springing of pipe criteria not 1.D. docusented,or authorir DSP CONS 66-09,A 1.E.8 Failure to adequately I.D.desig n basis & inputs, including DBA DSP CONS B6-09,A:1.B.9 No evidence to demonstrate coat ing had been tested n qualified OSP CONS 86-09,A1.C.! DC control inspectors f ailed to witness butt splices of inst.6 OSP CONS B6-09,A 1.C.6 BC insp. inadequate for snubber DSP CONS B6-09,A:1.C.B 9C insp.f ailed to identify pipe support velding deficiencies. OSP CONS 66-09,B1.A Incorrect determination of cab! e tray hanger attributes by mal DSP CONS 86-09,B 1.B.2 Vendor docueents (EPAsl not pro perly controlled by 66H. OSP CONS 86-09,B 1.B.5 ER verification progras. OSP CONS B6-09,B 1.B!b Unvealed conductor entry condal t (EPAsl. 03P CONS 84-!!-0-11 Equip. foundation anchor bolt nu t. SEE B7-02. OSP CONS B6-23-0-01 Security !ssue RIV DRSS B6-26-046 Insufficient insp. attributes to r HVAC ducts & plentes. OSP CONS B6-32 + 0! Heat, tracing on containment ATMOSsaapleline. OSP CONS

r. . . .

Page C. 3

-: 03/27/W ATTACHNENT'l TO ENCLOSURE I OPEN,UNNESOLVED,ANDENFORCEMENTITEMSREBUIRINSRESOLUTION

, PRIOR TO FUEL LDAD B0UNCE DESCRIPfl0N OF ITER RESP 87-06-0-08 Esposed and coated rebar in the seisaic gap. OSP CONS l 87-06-0-09 ISAP V.c third-party closure of BIR E-0349 & D-0099. OSP CONS 87-09-0-01 Adequacy of New SNEC For ISAP!!.c OSP CONS 87-11-V-02-64Splicesinchillerunits. OSP CONS 87-12-0-01 leptesentation of design sod.to provide lock P2R bypass valves. OSP OPS 87-13-U-03 Equipment setting performed by Bohnson & B&R homogeneity in qu DSP CONS 87-16-0-04 Other fores considered in SNEC revies. OSP CONS 87-16-V 12-54 Missing cotter pins on pipe sup port. OSP CONS 87-18-V-02 NCRnotdispositionedproperly. OSP CONS 87 27-V-01-A TUE failed to take corrective a ction on AFW pumps. OSP CONS 87-27-V-01-C TUE failed to take corrective a ction on AFN pueps. OSP CONS 87-27-V-01-D TUE failed to take corrective a ction on IR letter about AFN pu OSP OPS 87-27-V-04-A Tot f ailed to assure design req utrements translated into specs OSP OPS BT-30-V-06-54 Capacitors in EDS control panel OSP CONS B7-30-V-07-54 EDS control panel draeings not correct. OSP CONS 87-35-V-02 leproper documentation of as-bu ilt conditions. OSP CONS D 02-0-01 Sales Unit ! & 2 hydrogen & LYZ ER Part 21. OSP OPS C-04-0-01 Cables outside cable tray. OSP CONS 88-07-0-01 Environmental air sampler calib ration. RIV FRPS C-07-0-02 Noteorological instrumentation rellatility. RIV FRPS C-10-0-06 Subettted of required records n et assured. OSP CONS C-10-0-10 No TUE audits of or procedure f or verifying eng'rg quals. OSP CONS C-ll-U-01 No traveler foro for print reso val on HVAC support. OSP CONS C-!!-U-03 Saps in snubber load pin holes. OSP CONS 88-!!-U-04 inubber est. piece not torqued- site 35. OSP CONS C-!!-U-05 Use of A-307 bolts on transitio n kits for snubbers. OSP CONS

Pete C, 4 03/27/09 ATTACHNENT1TOENCLOSURE!

OPEN, UNRESOLVED, AS ENFORCEMENT ITEMS f4EOulRINS RESOLUTION

. , PR!DRTOFUELLOAD SOURCE DESCRIPTION OF ITER REW 00-16 + 0! False ceiling at personnel acce os point. RIV DRSS 80-16-0-02 Adequacy of fireproofing satert al a) a barrier. RIV MSS 88-16-0-03 No separation between vital /PA barriers. RI) DR$$

88 51-V-01-54 !aproper approvals for DCAs. OSP CONS 68-52-0-01 Securingpower. OSP OPS 89-52-0-02 Technical spec reference for N BR. OSP OPS 98-20-U-05 No hardened washers under heads of high strength bolting. OSP CONS Il-20-U-06 Incorrect eaterial certificatic n. OSP CONS

'E!-20-0-07 Side loads on saay struts. OSP CONS C-20-V-04-S? Undersized welds on cable tray supports. OSP CONS BO-22-U-04 Houukeeping & equipeent protet tion. OSP DPS C-22-U-05 Procedure leptesenting saintena nce progras. OSP OPS C-27-V-01 S? Teelve procedure sanuals net to ntro!!ed properly DSP CONS C-28-0-02 FSAR and TS clarification of ne utron detector tesp 11:11. OSP CONS BB-36-V-01-54 Inadequate Hilti bolt estedsent DSP CONS C-38-0-02 Cable grip installation. OSP CONS C-38-U-01 Adequacy of NCR dispositioning. OSP CONS C-42-U-01 Effectiveness of FVM-075 to det act concrete spacing violations OSP CONS C-44-0-01 Air valve testing. OSP OPS C-44-0-03 Documentation of GA discrepancy es. OSP OPS C-44-V-01 Adverse conditions are proeptly identified & corrected. OSP OPS 88-45-0-01 Replace D6 esters. OSP CONS C-46-V-01 Error in revision to NME-904. OSP CONS C-46-V-02 BC inspector did not docueent d liferences free design dr nng. OSP CONS C-47-0-02 totablishment of corrosion prog ras eith present data questione OSP CONS 88-47-0-03 Practice of engineering seletti ng quality level questioned. OSP CONS

i Page D. 5

  • - i 03/27/M ATTACHENT 'l TO ENCLDBURE 1 I

OPEN, UNRESOLVED, AND ENFORCEENT ITEMS REDUIRING RER0LUT10N i e

. PRIOR TO FUEL LDAD SOURCE DESCRIPT!DNOFITER RESP IS-47-V-Ola97 Failure to establish GAltech. r requirements in procurement docu OSP CONS 80-47-V-0!bS7 Failure to establish adequate i ontrols of sandblast process. OSP CONS II-47-V-0!cS7 Failure to provide insp.procedu res & sonitoring of sandblast. OSP CONS II-47-V-0!dS7 Failure to identify / correct pro bless identified by NRC. DSP CONS II-41-U-02 Neld identification - NDE Van R eport. OSP CONS 00-52-0-05 Monitoring sediment buildup in SSI DSP OPS 08-52-0-06 Kaptonstring. OSP CONS 98-56-0-04 leproper use of use-as-is dispo on NCRs. OSP CONS II-56-U-05 Sluged melds and poor fit-up. OSP CONS 90-56-V-01 Incomplete rework per NCR dispo OSP CONS C'-56-V-02 Inadequatedesigncales. OSP CONS D 59-V-01 FVM-89 Naldown discrepancies. OSP CONS D62-0-01 Ir. ability of control RM personn el to retrieve DCAs. OSP DPS 86-62-0-02 Broken streshead on Unit 1 TR B DS engine ccver sport bracket. OSP OPS 98-62-U-01 Unaccounted for Safeguard infer nation. OSP OPS C-64-V-02 undersized & sislocated melds. OSP CONS 98 65-0-01 leproperly installed cotter pin s. OSP CONS C-65-V-02 Undocumented work activities. OSP CONS D70-V-03 Souge in base estal of embeded plate. OSP CONS 88-71-U-01 Inadequate design cales for pip in0 & supports. OSP CONS D71-V-02-64 Failure to properly inspect the tad engagement for SPA bgr. OSP CONS l 88-71-V-03 Failure to properly revies dest gas for applicability. OSP CONS l C-71-V-04-64 Lack of docueented instructions for tech.dispo.in FVMs. OSP CONS 98-75-0-03 Effect of melding on gasket ser vite life. CSP CONS 08-75-U-01 ClaapEarparallelise. OSP CONS 18-75-U-02 Uncoated HVAC welds. OSP CONS

Pasc C'. 6

-03/27/09 i AIIACHMERI'l10ENCLOSUREI DPEN, UNRESOLVED, AND ENFORCEENT ITEMS REOUIRINS RESOLUTION

.- PRIOR TO FUEL LDAB BOURCE E SCRIPilW OF ITER UilP 08-75-U-04 Control of weld filler sat'l & therejseter calibration. OSP CONS 10-79-U-01 Catent. press relief sys. debrl's screen piping classif. anaiting OBP OPS 38-B1-U-01 Inadequate PCHYP implementing p recedures. OSP CONS 38-81-U-02 Inadeguate PCHVP training for w alkdown engineers. OSP CONS BI-81-U-03 !aproper use of portable rod ov ens. OSP CONS 98-82-V-01 UndersitensoldperrevisedDCA DSP DSP

$8-84-0-02 SS!! testing, procedures, train ing.Amalting NRC verification. OSP OPS 99-01-0-01 TUE assumes vendor responsibt!! ty for Part 21 defects. OSP CONS 9943-0-01 Procedure revision to more clea rly describe ASME package closu DSP CONS 99-03-0-02 FoliceupCARs 88-34,-35,-36 re Aircos. OSP CONS B9-03 0-03 Review study of past cosearcial grade procurement. OSP CONS 89-03-V-03-50UnnatIRsnotsubjectto50.55lelevaluation. OSP CONS B9 04 U-01 Lack of attribute inspection do cusentation. OSP CONS 99-04-0-02 Full rope reeaining in condult. OSP CONS 89-05-0-01 Locating Richeond inserts. OSP CONS 99-05-0-02 PCHVP inspection errors on stru ctuni steel platfores. OSP CONS l

99-06-0-01 Misaligned pipe claap. OSP CONS 89-06-V 02-SP Unauthorized work or inadequate DC inspectico. OSP CONS l.

l l __

~

~

!- Page C . . I 2

a. 03/27/09 ATTACWENT 2 TO EELOIURE 1 KFICIENCIESRE9UIRINGREBOLUTIN

, PRIORTOFUELLDAD BOURCE ESCRIPT15 SF ITER RESP

' CP-77-06 Daission Reactor Ild 1 Reinfor- ceing Steel Pour 101-4812-001- DSP CONS CP-77-10 Reacter Ild 1 & Aus Reinforcing Steel Deltted free Concrete 08P COND CP-77-Il Reactor el Safeguard Ilde i Re- inforcing Steel Lef t Dut/Detted OSP CON 6 CP-77E PSARIFSAR nonconfernances rei e echanical safety-relstad Specs. DIP CONE CP-77F Delaval N stator sinding defec t. OSP CONS C8,-78-03 Steae Generator Upper Lateral Supports Esbeds OSP CONS CP-79-07 Robar coverup. OSP CONE CP-80-03 Weld connections-hot SD control board did not seet design req. 08P CONE CP-00-05 Esbedeent lengths of Hitti Bolt Rnchor le Floor Slabs-TUE reop OSP CONS CP-10-09 Diesel Generater Pipe Supports. Closed in 81-09. TUE reopened. OSP CONS CP-M-12 -EnvironeentalOual.cfEquipeentforHighEnergyLineBreaks. OSP CONS CP-84-17 Flooding Levels in E6C Bldg. TUE reopeneJ. Closed in B4-40. DSP CONS CP-84-27 VentilationExchangeDespers. OSP CDNS CP 04-29 .ControlRoosHVAC.Safeshutdowncapabilityforfire. OSP TEtli CP-85-03 Anchor Bolts in Steae Sn.Later al Supp Engaged Less Than 21/4 OSP CDNS CP-35-04 Containment Spray Isolation Val us Open Tine. OSP OPS CP-85-11 Instrument Tubing Tapped Off 45 degree not allo w d. OSP CONS j tbl5-12 Aux Feed Flou say be Outside Te ch Spec because of Bad Satpcint DSP DPS CP-B5-17 Core Exit Teep. Monitoring Syst ee Thereoccuple say Err. Not re DSP OPS l CP-85-21 Diesel Benerator Pointial Cent rol Panst Overheating. Not repo DSP OPS CP-95-22 PosiSeal Containment Isc. Valve Oper.under Plant Faulted Cond. OSP DPS CP-85-25 Sequencing Fire Protection Coop onents for HVAC/CCN.NOT REPORIA DSP TECH CP-85-26 Unit!UpperLateralRestraint. OSP CONS CP-05-27 Concrets Debris in Separation E aps betwen the Fuel & Aus Ildg OSP CONS CP-05-27Rev i Seisaic Sep - Sw 3RR 105. Revision 1toCP-85-27. OSP CONS CP-85-29-SUPL Design el architectural feature control roos ceiling. (PSRI DSP CONS

Page C;. 2 03/27/09 ATTACNMENT 2 TO ENCLDIutE i KFICIENCIESREGUIRINSRESOLUTION

.., PRIORTOFUELLDAD SOURCE KSCRIPT!'ONOFITEM- RESP CP-85-31 Additional height for Electrica 1 Ratemays. OSP CMS CP-85-33 Soiseic valvet - see M R 105. OSP CONS CP-35-34 Conduit support design. (PSR) DSP CONS CP-B5-35 Cdle fray Hanger Design. Aef. CP-83-15. OSP CONS CP-85-39 EquipmentConduitInterface. OSP CONS CP-85-40 Equip. conduit interf ace-flus sa pping seal table restraint. OSP CONS

'CP-85-41 Computer Progree Errors for Analysis of Cable /Cond. Supports OSP CONS CP-B5-42 Thereolag and substitutions on Conduit' Support. OSP CONS SDAR CP89-01 NANCO Lisit Saitches. OSP CONS SDAR-CP-85-40 DS Intate Silenter Internals. OSP CONS SDAR-CP 85-49 Main Fluid Line - Fluid Transit DSP OPS SMR-CP-85 50 Cable fray 'ipe' Fittings. OSP CONS SDAR-CP-85-51 Application of Los Sulphur Cont ont A5BB Steel. OSP CONS SMR-CP-85-52 table Tray Hanger Reverification Progras. OSP CONS SDAR-CP B1 !3 Seiseit Category 11 platfores incomplete GC. See 87-71. OSP CONS SMR-CP-85-54 Seiselt Qualification of HVAC S upports. DSP CONS SMR-CP 66-03 Class it Instrueent Techniques. , DSP CONS SDAR-CF-86-04 Proximity Platseent: Rich. Insert & Neld Attach.to rebedded plate DSP CONS SDAR-CP-86-05SafetyClassPipeSupportssountedtoNNSembeddedplate. OSP CONS SDAR-CP-96-06 Puep 6 driver donling/SU testin g. OSP OPS SDAR-CP-96-10 Electric Penetration Assedlies 059 CONS SDAR-CP-86-1B Safety chilled eater chiller op eration. OSP OPS l S MR-CP-S&-19 Instrueent Installation.REF.CP- 06-16,66 50,56-70,& 66-77. OSP CONS SDAR-CP-86-22 Safeguards Area Fan Coolers - Operations. DSP DPS SMR-CP-86-24 Degrade in Class IE Circuiting Unqualified Switch & Heater. OSP CONS S MR-CP-96-26 Adequacy of Containeont Spray Systee. OSP DPS

Page D. 3 03/27/M ATTACHENT 2 TO ENCLOSuli 1 l

KFICIENCIES REQUIRING K SOLUh 0K

, PRIOR TO FUEL LOAD SOURCE ESCRIFi!ONOFITER REBP SDAR-CP-9632Thru-NallEsbeodedConduitSletves OSP CONS l SHR-CP-86-34 Disco Fire Stop Designs-Unexpos ed Surf ace nceed 325 degrees. OSP TECH i

SDAR-CP-B6-35 Motor Operators for Manual Valves in Main Steas Systte. OSP CONS l SDAR-CP-96-36 Large Bore Piping & Supports. TUE Iinal Reports on Units 112 OSP CONS SDAR-CP-B6-38 Traceability of IE Pigtail Este naions. (PSR) DSP CONS SDAR-CP-86-39 Dimensional Error for Cable fra y Shies used with C-type Clasps OSP CONS SDAR-CP-86-40 Application of Nonqualified Agastat Relays OSP CONS SDAR-CP-86-41 Break Loss of Coolant in Mode 4 Operation of EM Core Cool Sys. OSP OPS SDAR-CP-86-4216C Breater for Power Cabinet- Incorrect Overturrent Setting. OSP OPS SDAR-CP-86-43 ITT Barton Switches Malfunction Under LOCA Conditions. OSP OPS SDAR-CP-86-45 Design of Seistic Cat !! Change did not consider Nontat i Equip ObP CONS SDAR-CP-B6-48 Adequacy of konconfereente Disp ositions OSP CONS SDAR-CP-86-49 Repl. crated sed. sealant caused by polar organic sol.Cona pen. OSP CONS SDAR-CP-66-51 Hitti Anchor Bolts.NRC INFO.NOT ICE B6-94 ISSUED. OSP CONS SDAR-CP-56-52 Cable Tray Splices / Connections & Field Drilled Cable Tray hole OCP CONS SDAR-CP-66-53 Seismic Design of Condn t. OSP CONS SDAR-CP-86-54 Original Design of Control Robe Ceiling OSP CONS

- SDAR-CP-86-56 Po;sible Engine Failure of Stan dby Diesel Senerator-TransAser. OSP OPS SDAR-CP-86-60 Polar trane Support Birder Brackets not Shiesed.(ISAP) OSP CONS SDAR-CP-66-61 Polar trane Rail Moved, Ground Nires Draken,& Shies Dislodged DSP CONS SMR-CP-96-63 Cracked cotter pin in pipe sunb bers. PSR OSP CONS SDAA-CP-B6-64 Tech. basis for repair of safety -related coating in DS tank. OSP OPS SDAR-CP-96-66Nolaptaronseetvert.dovel bars in mall of en!!iery t!!;. DSP COP 3 BDAR-CP-B6-67 Pre-Operational Vibrational Tes t Criteria OSP DPS SDAR-CP-86-68 Weather Protection of Class lE Cosponents Located Outdoors.PSR DSP CONS SDAR-CP-B6-723eallBorePiping& Supports. TUE FINAL REPORTS ON UNITS !&2. OSP CONS

l Page No. 4 03/27/99 ATTACNNENT 2 TO ENCLOSSE i EFICI DCIES REQUIRIN6 RESOLUTION c , PRIOR TO FUEL LOAD SOURCE DESCRIPTIONOF172 RESP 8BM-CP-06-73 ABME Bnubber Attacheent tracket s. OSP CONS SOM-CP-N-75 Contaminated ASCO Solenoid valves, Seals, 6 0-Rings. OSP CONS SDAR-CP-86-78 Bolted Connections in Shear Pla nos (PSR). OSP CONS SDAR-CP- N-92 Neld Penetration Incomplete on Unit i Cable Tray Hangers. OSP CONS 60AR-CP-E7-01 Finite Element Computer-Error- Load Distribution in Safe. bldg. OSP CONS SDAR-CP 87-03 6.9 KY Switchgear Installation. Jadshaf ts. OSP CONS SMR-CP-87-04 Plug Nelding on Esbedded Channe is. OSP CONS SMR-CP-67-07 Itses issued fros uhse may not confors to GA doc-safety relate DSP CONS SMR-CP-87-09 Tereinal Studs in PK-2 test Biocks OSP CONS SMR-CP-87-10 Control of Design Modifications OSP CONS SDAR-CP 87-13 Class 1E sepration violations. Cable tray covers. (PSR) OSP CONS SDAR-CP-87-15 Air accumulators. Absence of GC OSP CONS SDAR-CP-87-16 Limit Switch Wiring OSP CDNS l

SDAR-CP-87-12 Seiseic Qualification of CCW Heat Exchangers CSP CONS EDAR-CP-87-19 Aehient Temperature Effects on MSIVActuators OSP DPS j- SDAR-CP-R7-21 Derating factors for single cab le trays say cause degradation DSP CONS SDAR-CP-B7-22ContaineentLinerAttachment Requirements: Impact Testing OSP CONS SDAR-CP-87 23 Loose Conduit Unions CSP CONS EDAR-CP-07 25 Diesel generator fuel cil stora ge tank vont eissile protection OSP OPS

- SDAR-CP-B7-26 Diesel Senerator fuel oil trans fer pump section lif t. OSP OPS l SDAR-CP-67-27 Salvanic Corrosion in CCW h SW Systees DSP DPS l

SDAR-CP-B7-28 Condensate Storage Tank 0verpre ssurization DSP OPS SMR-CP-87-29 CCW ! solation following RCP The real Barrier Rupture DSP CONS S MR-CP-87 30 Roll-asay Missile Shields, melds understre. OSP CONS l

SMR-CP-87-33 AFW Pump Motor Fans Installed lackeards. See 87-33. OSP OPS SDAR-CP-87-34EquipsentNoraleLoadsInterfaces.

OPS CONS

Page D. 5' '

03/27/09 ATTACHNENT2TOENCLOSURE1 KFICIENCIEB REOUIR!N6 RESQLUTION

. , PRIORTOFUELLOAD SOURCE ESCRIPTION OF ITEM RESP l

S W -CP-87-35 Rayches Motor Connection Kits OSP CONS SM-CP-87-36 Equipment Justification-Vendor Qual. Rpt. Discrepancies OSP CONS SDAR-CP-87-37 Westinghouse Bate Valves f ailed in Preop testing.NOT REPORTABLE OSP OPS SDAR-CP-87-38 Fire Setection Systes PC boards OSP CONS S W -CP-87-40 Electrical Isolation between C1 ass IE & Non-class IE Equipeent DSP CONS S W -CP-87 44 Unistrut Tubing Support Bolting OSP CONS SDAR-CP-87-45 Reactor Coolant Puep Notor Back up Circuitry. OSP CONS SDAR-CP-17-46 Containment Spray Pump Motor Ro tor / Stator Sap. OSP CONS SDAR-CP-97-47 Consueable Materials Replacemen t Progras. OSP OPS SDAR-CP-87-48 Cable Tray Transverse Clasps. (PSR) OSP CONS S M -CP-87-49 Solid State Sefe;:trde Systees (SSSS) Internal Niring Tere. OSP OPS D AR-CP-87-50 Turbine Driven Auxiliary Feedua ter Pump Bearing Temperature. OSP OPS SDAR-CP-87-51 480V Containment Electrical Pen etration Backup Protection. OSP CONS SDAR-CP-67-54 Class IE MOV setor starters act or starters. FSAR vs. Dag. OSP CONS SDAR-CP-87-55 Containment Spray Pump Retircul ating Piping. OSP CONS SDAR-CP-87-56 Deficient Pipe Nhip Restraints. (PSR) OSP CONS SDAR-CP-B7-59 leproper Application of Constru ction Aids. Cable Tray (PSR) OSP CONS SDAR-CP-87-60 Installatism Configuration of A SCO Solenoid Valves. OSP OPS BDAR-CP-87-61 ' Snug Tight' forquing of Struct ural Belts. (PSR) DSP CONS SDAR-CP-B7-62 Class 5 Pipe Supports. (PSR) OSP CONS SDAR-CP-87-64 Design Bases Tornado (DBT) Anal ysis for Safety-related Equip. OSP CONS SDAR-CP-87-65 LOCA EHects on HVAC Duct insid e Containment. OSP CONS S M -CP-87-66 Struttural Bolting in Ter.sion. (PSR) OSP CONS S W -CP-87-67 underaired loits & Missing Jae Units. (PSR) OSP CONS S M -CP-87-6B Hilti Solt Inadequacies. (PSR) DSP CONS l

l SDAR-CP-87-70 Pre

  • bend Pipe Wall Thickness (PSR) OSP CONS

=

Page C. 6

'03/27/09 ATTACHMENT 2 TO ENCLOSURE 1 KFICIENCIES REOUIRING RESOLUTION

. PRIOR TO FUEL LDAD SOURCE DESCRIPTIONOFITEM RESP S HR-CP-87-71 Missing Nelds & Undersized Moeb ers. Structural steel.See 85-53 OSP CONS SHR-CP-87-77 Cable fray Weld Documentation Requirements. OSP CONS SDM-CP-07-78 Cable fray Nelding Procedures D aficiency. OSP CONS SDM-CP-87-79 Cable & Raceaay Data Systees Calculations for weight n fill. OSP CONS SDAR-CP-87-80 Fuse Biting. NOT REPORTABLE. OSP CONS SDAR-CP-87-82 Fire Detection Control Panels. NOT REPORTABLE. OSP TECH SDM-CP-87-83 Seisaic Analysis of Service Nat er Discharge Structure. NOT REP OSP CONS SDM-CP-87-85 Degradation of Class lE Circuit s OSP CONS SDAR-CP-87-90RHRReliefValvePiping. OSP CONS SDAR-CP-B7-91 Startup Transformer Overload. OSP OPS SDAR-CP-87-97 Flexible Conduit h:;:ctions. OR!!!NAL FILE MISSIN6. NOT REPO OSP CONS SDAR-CP-87-98 Cable Racnay Fill Calculations -Cable Outside Disseter. NOT RE OSP CONS

{

SDAR-CP-87-99 Cable Outside Diaseter Requires ent. NOT REPORTAPLE. OSP CONS SDAR-CP-98 43 SN-431 Safety-related instrueen ts. OSP CONS SDAR-CP87-100 Containment Piping Penetrations OSP CONS SDAR-CP87-101 Class IE Cable Arrangement. OSP CONS SDAR-CP87-103 Cracked Sears in Valve Operator s OSP CONS l SDAR-CPB7-104 Safety Systes Setpoint Calculat ion Errors. OSP OPS SDAR-CPB7106 Coeponent Design Spec.discrepan cy. Mechanical equip. bolting. OSP CONS SDAR-CP87-107 Auxiliary Feedsater Design Pres sure. OSP OPS SDAR-CPB7 108 Auxiliary Feedsater Puep Lou Su ction Trip. DSP OPS SDAR-CPB7-109 Inappropriate Deficiency Docuse ntation. OSP CONS j

BHR CPI 7 Ill Motor Control Center Loose Tere inal. CSP CONS l SDAR-CPB7-I!2HDTSHUTDONNPANELSEISMICANALVSIS. OSP CONS SDM-CP87-l!4 FLE!!ILE METAL TUI!N6 M!$Al!8NM ENT. OSP CONS '

SDAR-CP87-!L SE!SMIC AMLYSIS OF SERVICE NAT ER INTAKE STRUCTURE. OSP CONS .

- _ _ _ - _ -  ? _

,,.+ .;

Page D . 7

...! ' 03/27tn ATTADNENT 2 TO ENCLOIRE 1 KFICIENCIES REN !RIE RESOLU7 ION

, , PRIOR TO FEL LOAO BOURCE . M SCRIPil m OF ITEM REW

~ 5BAR-CPI 7-l!6 PURSE IAS 0/ PRESSURE- COSEBATE S/TMK & KAC.MKEUP W/S TANKS. DOP DPS.

SDAR-CP87-Il7 E RVICE MTER SYSTEM ELECTRICAL MSION VERIFICAi!0N. O p OPS SOM-CP87-!!I ITEM OENENTOR K000M 180LAT 10N. OSP WS

$8M-CP87-119 EBIENTIE & EMERIENCY L10Hithi $UPPORTS. OSP CONS 384R-CP87-120 TD MADO M1881LE BARRIERf. (PSR) OSP CONS SDM-CP87-1216.9KV/400Y TRANSFORMER BUS BAR CLEARANCE. OSP CONS 80AR-CP87-122 MZILE LOM INTERFACES.' DSP CONS SIM-CP07-124XOMOIVEVES. OSP CONB

$8AR-CPI 7-125 SE N ICE MTER PIPING SUPPORT. HILil BOLT FAILURE. OF CONS SDM-CPI 7-126 FIRE ALAM SYSTEM CNTROL PANEL NOT COMECTED TO PM DIST. PANEL OSP TECH ,

IDAR-CP87-127 OVERSTRESKD PLATFOM L SUPPORT STRUCTURE KSIGN. OSP CONS SMR-CP87-120LOSSOFCONTROLPONERIMICATION. OSP OPS SDAR-CPB7-129 CONTA! MENT SPRAY SYSTEM PH. OSP OPS SDAR-CP87-130 SERVICE WATER SYSTEM M TER HAMM ER. OSP OPS SDAR-CP87-131 K F.!N STEAM SEN. CUBICLE STEEL PLATFRM FRAMINS & PRES.SUP. SLAB OSP CONS l SDAR-CP87-132Uh3UALIFIEDLIMITOROUEACTUATORS. OSP CONS SDAR-CPIT-133 HION ENER$Y LihE IREAK f4A'.YSIS OSP CONS SMR-CPI 7-134 CLASS lE AC E!ICTRICE SYSTEM. MFICIENCYINSEP.CRiiERIA. OSP CONS SDAR-CPI 7-135 CONTROL ROOM WAC.SUSC.TD $1NBL E FAlLURE FMS FROM NON-lE BUS. OSP CONS SMR-CPB7-136 MOTOR CONTROL CENTER SPACE HEAT ER. NOT GUE!FIED CLASS OSPlE.

CONS SDM-CPI 7-137 DIESEL BENERATOR 80VERNOR EAT EXCHANSER. OSP OPS SDM-CP87-lil ELDIM BLAG INCLUSION (FIELD CARE TRAY Flii!NGS). (PSR) OSP CONS SDAR-CPI 7-139UN9UALIFIEDTEMlMLBLOCKS. (EIMULLER) OSP CONS SBAR-CPIO-01 CCN BUR 64 T MK CAPACITY. OSP OPS 60AR-CP08-02 HVAC OR MITY DAMFERS. OSP FS SDAR-CPIS-03 NYDROSTAT!C TDiilti REOUIREENT DW CONS

____-_J_____.

Page D. 8

  • . 03/27/M ATTACHMENT 2 TO ENCLOSURE 1 KFICIENCIESRE8UIRINGRES01.UTION

, PRIOR TO F E L LOAD SOURCE E SCRIPTI N OF ITEM RE8P SDAR-CP88-05 AFN INSTRUMENTATION ELECTRICAL SEPARAT!DN. OSP CONS SDM-CP88-06 Containment spray E8. I!ncorper ated into SDAR-CP-87-122). OSP CONS SMR-CP88-07 REACTOR C00LMT PUMP NIRINS. EL ECT SEPMATION VIOLATIONS. OSP CONS SDAR-CP88-08 BATTERY ROOM HEATERS. NOT SEISM IC 00ALIFID. OSP CONS SDAR-CP88-09 CLASS 1E & NONCLASS 1E ELEC. PE NETRAi!DN OVERLOAD. NO BACKUP. OSP CONS SDAR-CP88-11 BATTERY CHARBER OVERNEATINS DUR INS PREOP. OSP OPS SDAR-CP88-12 CLASE 1E & NON-CLASS 1E CA8LE S EPARATION. OSP CONS SDAR-CP88-13 AUXILIARY FEEDNetER SYSTEM AIR ACCl%)LATORS IME8UATELY S!!ED OSP OPS SDAR-CP88-14 STRUCTURAL LOAD VERIFICATION OF s d!C CAT.! SiRUCTURES.(PSR) DSP CONS SDAR-CPB8-15 CONTAINMENT MA!! MUM FLOOD LEVEL OSP CONS SDAR-CP88-16 Containment spray chasical addi tive systes. (P.ETALURSICAL) USP CONS SMR CP88-17 CONTROL ROOM HABITABILITY. OSP DPS SDAR-CP88-18 Th,Tc & RCS PRESS. MONITORINS 1 NSTRl;1MENTAT10N. OSP OPS SDAR-CP88-19 CABLE INSULAi!DN CONTAINMENT EN VIRONMENT. DS8 CONS SDAR-CPB8-20 HELS DETECil0N & MlilSAi!0N. OSP CONS SDAR-CP88-21 INSTRUMENT TUl!NS CLMPS OVER TOROUE. OSP CONS j

SDAR-CP88-22 Service mater discharge pipe si ssile protection. OSP CONS SDAR-CP88-23 E SIGN BROUNDNATER ELEVAT!DN.. OSP CONS SMR-CP88-24 INSTRUMENT TU K RESTRAINTS & SU* PORTS. OSP CONS SMR-CP88-25 AUllLIARY FEDNATER PUMP TUR8IN E CONTROL PANEL. OSP DPS SDAR-CP88-26 TURBINE BUILDINE DESIGN REQUIRE MENTS. (PSR) OSP CONS SDAR-CP88-27 PRINTED CIRCUIT CARDS (PCI REPA IRED ON SITE. OSP CONS SDAR-CP88-28 Unit 2 cracks in tube steel sup plied by UNR/Levitt. OSP CONS l

SMR-CP88-29 FEEMATER ESISM M00. NOT INCOR P0 RATED INTO FSAR 15 ACCIENT A OSP OPS SMR-CP88-30 Cold Overpressure Mitagation Sy stes. OSP OPS SM R-CP88-31 Isolation Transformers. OSP DPS l

Page No. 9 -

.. 83/27/89 ATTACNNT 2 TO ENCLO8tAE 1 l DEFICIENCIES RE8UIRINS RESOLUTION g ,

PRIORTOFUELLO40 SOURCE DESCRIPTION OF ITEM RESP BDAR-CP88-32 CVCS Charging Pumps. OSP OPS SDAR-CP88-33 Energency Diesel Senerators. OSP OPS SDAR-CP88-34 RNR Heat Exchangers. OSP CONS SDAR-CP88-35 Measurine and' Test Equipeent. OSP CONS SDAR-CP88-36 Charging puep einiflow lines. OSP. OPS SDAR-CP88-37 ASCO Solenoid Valve Coil Wire L eads. OSP CONS SDAR-CP88-38 Steas generator tube rupture. OSP CONS SDAR-CP88-39 SN-427 RHR valve position indic ation. OSP OPS SDAR-CP88-40 NPSI sway strut angularity. OSP CONS C3R-CP88-41 Westinghouse cell switches. OSP CONS SDAR-CP88-42 Flange eisalignaent in toeponen t cooling water systes. OSP CONS SDAR-CP89-02 Delivery valve holder of TDI di esel gen. fuel injection pump. OSP OPS

Faceus. 1 95121tn

' ..- ATTACleiENT 3 TO D CLDIUNE 1 .

BULLE71NS REOUIRINS RESOLUTION' I

PRIOR 70FUELLOAD SOURCE ESCRIPTIONOF17EM RESP IER 76-04 Diaphrage failures in air operator auxiliary actuators DSP DPS IES 77-01 Pneuestic ties delay relay set point drif t. Closed in 84-07. OSP CONS IES 77 05 Electrical connector asseeblies SEE 87-36. OSP CONE IES77-05A Electrical connector assemblies BEE 87-36. OSP CONS ID 77-06 Assurance of safely and safeguards during an energency OSP DPS IES70-08 Radiationlevelsfreefus! element transfer tubes. OSP CONS IES 79-01 Environmental qualification of Class IE equipeent. OSP CONS ID 79-01A Environmental qualification of Class IE equipeent. OSP CONS IES79-018 Environmental qualification of Class IE equipment. OSP CONS ID 79-018-S1 Environmental qualification of Class IE aquipment-Supp. No.1. OSP CONS IES 79-018-82 Environmental qualification of Class IE equipesnt-Supp. No. 2. OSP CONS IES 79-018-53 Environmental qualification of Class IE equipment-Supp. No. 3. OSP CONS IER 79-13 tracting in feedsater systes piping. Closed in 84-07. OSP CONS IEB 79-13-R 1 Cracking in f eedwater syntes piping-Rev.l.Closedin64-07. OSP CONS lEl 79 13-R-2 Cracking in feedsater syntes piping-Rev.2. Cicsed in 64-07. OSP CONS

!EB 79-15 Deep draf t puep deficiencies. Cl.in 84-29. Reopened in 87-36. OSP CONS IES 79-17 Pipe cracks in stagnant berated water systees at PNR plants. OSP CONS IEB 79-17-R-1 Pipe cracks in stagnant borated mater systees at PNR plants - OSP CONS lEl 79-1B Audibility probless encountered on evacuation of personnel DSP OPS IEB79-21 Temperature EHects on Level Measurteents. Cl.in 84-07. OSP OPS 10 79-24 Frozen Lines. Closed in 64-07. Reopened in 88-12. OSP CONS lEl 79-27 Loss of non-Class IE instru- sentation and control power DSP OPS lEl 80-06 Engineered Safety Feature (EiF) Reset Controls. Cl.in 64-07. OSP OPS ID 00-10 Contae.of Nonradioactive Sys.6 Pctantial cont.of Environment. OSP OPS 1[I 90-15 Possible Loss of Energency Noti fication Systes (ENS) Nith Loss DSP CONS ID 00-24 Prevention of laeage lue to H20 Leakage Inside Containment OSP CONS

.. Page C . ~2~ i 03/27/89

,, ATTA00ENT 3 TO ENCLOIURE 1 BULLETINS REOUIRI N RESOLUTION PRIORTOFUELLDAD  !]

SOURCE DESCRIPTIONOFITEM RESF IES 83-04 Failure of Under-Yoltage Trip Function of Reacter Trip Break- DSP OPS IEI 83-05 A8ff nuclear code pueps & sparepartssanufacturedby OSP CONS j IER85-01 Motor-oper. valve coseon mode failures during plant trahtient OSP OPS

!El B4-03 Potentialfailureofsaltiple ECCS puep due to single failure OSP CONS IES87-01 Thinning of Pipe Walls in NuclearPowerPlants. OSP CONS IER 88-01 Defects in Westin0h ouse Circuit Breakers. OSP CONS lEl 88-04 Potential Safety-related Puep L oss. OSP OPS IES 98-05 Nonconfereing Materials Supplie d by Piping Supplies, Inc., at DSP CONS IES 08-05-6-1 Nonconfersing Materials Supplie d by Piping Supplies, lac. at Fo OSP CONS IEI 98-07-5-1 Power Oscillations in Boiling W ater Reactors ($NRs). OSP OSP

!El90-08 Thermal Stresses in Piping Conn acted to Peactor Coolant Systes DSP OPS i

IER88-08-5-1 Thersal Stresses in Piping Conn etted to Reactor Coolant Systes'0SP OPS IEB 88-09 ThisbleTubeThinninginWestinghouseReactors. OSP OPS IEB 88-10 Nonconfereing McLded-Cass Circa it Breakers DSP CONS IEB 88-11 Pressurine Surge Line Thereal Stratification. OSP OPS J

1

Enclosure 2 Preoperational and Acceptance Testing Status Comanche Peak preoperational test phase inspection program (preoperational and acceptance test) is approximately 30% complete.

The overall status of the test program is listed below.

PREOPERATIONAL TESTS Procedures Procedures No. No. Results Results No. Issued Reviewed Tests Tests Reviewed Reviewed Tests By TU By NRC(1)(4) Started Completed By TU By NRC(2)(4) 101 53 10 36 17 0 0 ACCEPTANCE TESTS NON O ,.

Procedures Procedures No. No. Results Results No. Issued Reviewed Tests Tests Reviewed Reviewed Tests By TU By NRC(3) Started Completed By TU By NRC(3)-

31 24 3 20 18 2 0 SPECIAL TESTS Procedures Procedures No. No. Results Results No. Issued Reviewed Tests Tests Reviewed Reviewed Tests By TU By NRC(3) Started Completed By TU By NRC(3) 10 9 2 9 7 3 0 Status of Applicant Identified Test Deficiencies or Uncompleted Work Items As of 2/15/89 (Categorization by TU):

Test Deficiencies that impact fuel load: 185 Test Deficiencies that impact 5% power: 0 Test Deficiencies that impact Commercial Operation: 0 Test Deficiencies required to be resolved by first refueling or after: 0 Total Test Deficiencies 185 l

-___--___-__-_~

. 2

,- , , Notes:

(1) Eleven procedures are required to be reviewed by the 2513 inspection program. Since the applicant has several procedures which cover each procedure specified by the 2513 program, this nu.mber will be greater than eleven.- j

-(2) Eleven test results are required to be reviewed by the 2513 inspection program. Since the applicant has several procedures which cover each test specified by the 2513 program, this number will be greater than eleven.

(3) None of these are specifically required to be reviewed by the 2513 program, but may be reviewed as part of the NRC's overview of the applicant performance.

(4) Procedures and test results not specifically required to be reviewed by the 2513 inspection program may be reviewed as part of the NRC's overview of the applicant's performance.

1 i

)

4 1

J Enclosure 3 Construction Status Construction at CPSES Unit 1 is essentially complete.

Critical Path Items: (Not listed in order of priority) 1.- Complete rework of HVAC.

2. Complete rework of supports.
3. Resolution of open items, Deficiency Reports, etc.
4. Procedure reissue.
5. Preoperational testing.
6. Stress reconciliation program.

,+. .

e.

Enclosure 4 Corrective Action Program Status TUEC NRC Percent

  • Percent Project Inspection Title Complete Complete
1. Mechanical 93 90
a. Systems Interaction 52 50
b. Fire Protection 5 5
2. Civil / Structural: 78 70
3. Electrical 82 80
4. Instrumentation and control 58 Sf; 5.- Large Bore Piping and Pipe Supports 94 'f '1
6. Cable Tray and. Cable Tray Hangers 99 90
7. Conduit Supports Train A, B,.& C 2" 100 100
8. -Conduit Supports Train C 1 2" 100 100 "
9. Small Bore Piping and Pipe Supports 94 90
10. Heating, Ventilation and Air Conditioning 76 70 (HVAC)
11. Equipment Qualification 100 50
  • Values based on PCHVP walkdown/ inspections percent complete - as of 3/15/89.

l L -

i.

~

1 Enclosure 5 Status of Inspection Required by MC-2512, 2513. and 2514 1

~All modules in the NRC inspection program required to be complete prior to fuel load have been completed except the ones identified on the following pages.

I l

i

l

)

i MC 2512 - Construction Phase Percent Module No. Title Complete

  • 37055 Onsite Design Act. 80 l 42051C Fire Protection 70 l 45051 Geological /Found. Activities- 50 Proc. Rev.

45053 Geological /Found. Activities- 0 Record Rev.

46053 Structural concrete - Work Observed 90 46055 Structural Concrete - Record Review 90 46061 Masonry Construction 0 46071 Conc. Exp. Anchors 50 .

48051 Structural Steel Procedure Rev. 90 I 48053 Structural Steel and supts. -

90 I Work Observed 48055 Structural Steel and Supts. - Record 90 Review 49061 Saf. Rel. Piping QA Rev. 0 49063 Safety-Related Piping - Work 90 Observed 50055 RV & Internals - Records Review 90 i 50073 Safety-Related Comp. - Work Observed 90 )

50075 S. R. Components Record Rev. 90 J 50090 Pipe Support & Restraint Systems 90 1 50095 Spent Fuel Storage Racks 90 l 50100 HVAC Systems 90 51051 Elec. Comp. Proc. Review - Init. Insp. 90 51053 Elec. Comp. - Work Observed 90 51061 Elec. Cable Proc. Review - Init. Insp. 90 51063 Elec. Cable - Work Observed 90 51065' Electrical Cable Record Rev. Init. 90 Insp.

52053 Inst. Comp. - Work Observed 90 52055 Instru. Comp. Rec. Rev. 0

]

53053 Cont. Penetrations (Mech.) work Obs. 90 I 53055 Pen. Record Rev. O I 55050 Nuclear Welding Gen. 90 55100 Struct. Welding - Gen. 90 55150 90 Weld. Verification 57050 NDE - Visual 90 57060 NDE - PT 90 57070 NDE - MT 90 57080 NDE - UT 90 l 57090 NDE - RT 90 l I

1 1

- \

.a . . .. .

... 2

  • . 63050 Cntmt. Str. Integ. Rec. Rev. 0 64053B Fire Loop Installation 90 65051 Rad. Waste 50 73051 Inserv. Insp.-Program 0 73052 Inserv. Insp.-Procedures 0 73053B Preservice Observation 90

-73055B Preservice Data 90 80210 Environ. Protection 0

  • fodules listed as 90% complete have been reopened to 90% to allow designation of time spent inspecting the Corrective Action Program.

When inspection of the corrective action program is complete, the modules will be listed as 100% complete.

i

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - . _ _ _ ___..m__ . . ..__.

t .

4 Manual Chapter 2513 - Preoperational Phase Percent Module No. Title Complete General-35301 Quality Assurance for Preoperational 0 Testing 37301 Comparison of As-Built Plant to FSAR 10 Description 70300 Preoperational Test Procedure Test Review 30 70301 overall Preoperational Test Program 30 Review Requirer.: ants 70302 Preoperational Test Program Implementation 30 70311 Preoperational Testing Procedure 30 Verification 70312 Preoperational Test Witnessing 30 70329 Preoperational Test Result Evaluation 0 Verification 70370 Testing of Pipe Supports and Restraint 0 Systems 70400 Preoperational Test Results Evaluation 30 71302 Preoperational Test Program Implementation Verification Mandatory Test Procedure Review 70304 Engineered Safety Features Test 0 70305 Reactor Protection System Test 100 70306 Loss of Offsite Power Test 0 70307 Containment System: Integrated Leak 0 Rate Test 70308. Integrated Hot Functional Test 0 Primal Test Procedure Review (Select 5 of the following) 70331 Vibration Test 0 70332 Control Rod System Test 0 70333 Chemical Control System Test 0 70334 Engineered Safety Features Activation 0 System Test 70335 Safety and Relief Valve Test 0 70336 Residual-Decay Heat Removal System Test 0 70337 Main Steam Isolation Valve Test 0 ,

70338 Auxiliary Feedwater System Test 0 70339 Component Cooling Water System Test 0 1 i

o __ __ __ _ - M_ --_- - -- - _ _ )

, . . i \

e 2

3

  • - 70340 DC Power System Test 0 70341 Emergency-Standby Power Supply System Test 0 ,

70342 Containment System: Combustible Gas 0 l Control System Test 70343 Containment Spray System Test 0 70344 Containment Isolation Valve Test 0 70345 Containment Heating, Cooling, Ventilation 0 System Test 70346 Auxiliary Building Heating, Cooling, 0 Ventilation System Test 70347 Pressurizer and Level Control System Test 0 70348 Main Feedwater Control System Test 0 70349 Reactor Coolant Leak Detection System 0 Test 70350 Loose Parts Monitoring System Test 0 70351 Integrated Reactor Control System Test 0 70352 Remote Reactor Shutdown Test 0 70353 Cranes, Hoists, and Lifting Equipment Test 0 70354 Nuclear Instrumentation System Test 0 70355 Compressed Gas System Test 0 Mandatory Test Witnessing 70313 Containment System: Integrated Leak 0 Rate Test 70314 Integrated Hot Functional Test 0 70315 Engineered Safety Features Test 0 70316 Loss of offsite Power Test 0 70317 Reactor Protection System Test 0 Primal Test Witnessing (select 5 of the following) 70431 Vibration Test 0 70432 Control Rod System Test 0 70433 Chemical Control System Test 0 70434 Engineered Safety Features Activation 0 System Test 70435 Safety and Relief Valve Test 0 70436 Residual-Decay Heat Removal System Test 0 70437 Main Steam Isolation Valve Test 0 70438 Auxiliary Feedwater System Test 0 70439 Component Cooling Water System Test 0 70440 DC Power System iast 0 70441 Emergency-Standby Power Supply System Test 0 70442 Containment System: Combustible Gas O Control System Test 70443 Containment Spray System Test 0 70444 Containment Isolation Valve Test 0 70445 Containment Heating, Cooling, Ventilation 0 System Test

~

r . . t .

.o l:

3 ,'

  • . 70446 Auxiliary Building Heating, Cooling, Venti- O lation System Test 70447 Pressurizer and Level Control System Test 0 70448 Main Feedwater Control System Test 0 70449 Reactor Coolant Leak Detection System Test 0 70450 Loose Parts Monitoring System Test 0 70451 Integrated Reactor Control System Test 0 70452 Remote Reactor Shutdown Test 0 70453 Cranes, Hoists, and Lifting Equipment Test 0 70454 Nuclear Instrumentation System Test 0 70455 Compressed Gas SystRm Test 0 Mandatory Test Result Evaluation 70322 Engineered Safety Features Test 0 70323 Containment System: Integrated Leak Rate 0 Test 70324 Integrated Hot Functional Test 0 70325 Reactor Protection System Test 0 70326 Loss of Offsite Power Test 0 Primal Test Result Evaluation (select 5 of tne following) 70531 Vibration Test 0 70532 Control Rod System Test 0 70533 Chemical Control System Test 0 70534 Engineered Safety Features Actuation 0 System Test 70535 Safety and Relief Valve Test 0 70536 Residual-Decay Heat Removal System Test 0 70537 Main Steam Isolation valve Test 0 70538 Auxiliary Feedwater System Test 0 70539 Component Cooling Water System Test 0 70540 DC Power System Test 0 70541 Emergency-Standby Power Supply System Test 0 70542 Containment System: Combustible Gas O Control System Test 70543 Containment Spray System Test 0 70544 containment Isolation valve Test 0 70545 Containment Heating, Cooling, Ventilation 0 System Test 70546 Auxiliary Building Heating, Cooling, Venti- O lation System Test 70547 Pressurizer and Level and Control System 0 Test 70548 Main Feedwater Control System Test 0 70549 Reactor Coolant Leak Detection System 0 70550 Loose Parts Monitoring System Test 0 70551 Integrated Reactor Control System Test 0 70552 Remote Reactor Shutdown Test 0

, , . 4 -

c 4

70553 Cranes, Hoists, and Lifting Equipment Test 0 70554 Nuclear Instrumentation System Test 0 70555 Compressed Gas System Test 0 Operationg 36301 Operational Staffing Inspection 0 41301 Inspection of Operating Staff Training 0 42400 Plant Procedures Inspection 0 42450 Operating Procedures Inspection 0 42452 Emergency Procedures Inspection 0 71301 Technical Specifications Review 50 Maintenance 42451 Maintenance Procedures Inspection 0 35742 QA Program - Document Control 0 35743 QA Program - Maintenance 0 35744 QA Program - Design Changes and 0 Modifications Refueling 60501 Fuel Receipt and Storage 100 Fire Protection 64703 Fire Prevention /Protectiea O Surveillance 35745 QA Program - Surveillance Testing 0 35749 QA Program - Tests and Experiments 0 35750 QA Program - Test and Measurement 0 Equipment Plant Water Chemistry Controls 79501 LWR Water Chemistry Control and Chemical 0 Analysis (Preoperational and Supplemental) 79502 Plant Systems Affecting Plant Water 0 Chemistry (Preoperational and Supplemental)

Radiological Controls 80521 Radiological Environmental Protection 0 83522 Radiation Protection, Plant Chemistry, 0 1 Radwaste, and Environmental Organization and Management Controls 83523 Radiation Protection, Plant Chemistry 0 and Radwaste Training and Qualifications 83524 External Occupational Exposure Control and 0 Personal Dosimetry l

r . . n s 4

o r 5

  • . 83525 Internal Exposure Control 0 83526 Control of Radioactive Materials and 0 Contamination, Surveys, and Monitoring 83527 Facilities and Equipment 0 83528 Maintaining occupational Exposures ALARA 0 84522 Solids - Control, Sampling, Monitoring, and 0 Release 84523 Liquids - Control, sampling, Monitoring 0 and Release 84524 Gases and Particulate - Control, Sampling, O Monitoring, and Release 84525 Quality Assurance and Confirmatory 0 Measurements for In-Plant Radiochemical Analysis (Preoperational and Supplemental)

Security and Safeguards j 1

81018 Security Plan and Implementing Procedures 10 i 81020 Management Effectiveness 0 81022 Security Organization 0 81034 Security Program Audit 0 81038 Records and Reportc 0 81042 Testing and Maintenance 10 81046 Locks, Keys, and Combinations 0 l 81052 Physical Barriers - Protected Areas 0 81054 Physical Barriers - Vital Areas, 50 Material Access Areas, and Controlled Access Areas 81058 Security System Power Supply 0 81062 Lighting 0 81064 Compensatory Measures 0 81066 Assessment Aids 0 81070 Access Control - Personnel 10 81172 Access Control - Packages (Reactors) 0 81074 Access Control - Vehicles 0 81078 Detection Aids - Protected Areas 0 81080 Detection Aids = VA, MAA, and CAA 0 81084 Alarm Stations 0 81088 Communications 0 81501 Personnel Training and Qualifications - 10 General Requirements 81601 Safeguards Contingency Plan - Implementa- 10 tion Review 81810 Physical Protection Safeguards Information 0 85102 Material Control and Accounting (Reactor) 0 Ouality Assurance 35740 QA Program - QA/QC Administration 0 35741 QA Program - Audits 35746 QA Program - Procurement Control 0 l

l

b' y. . , 4 -e

.a

...: 6 r

N. 35747 QA Program - Receipt Storage, and Handling 0

of Equipment and. Materials 35748 QA Program Records 0 40301' Safety Committee Activity Inspection 0 Other 92718 Safety Evaluation Report Review and 20 Followup TI2500/14 " Solid State Protection System" 0 TI2500/16~" Seismic Interaction Between Flux Mapping 0 System and Seal Table" TI2500/17 " Heat Shrinkable Tubing" 0 TI2500/19 "RV Pressure Transient" 0 TI2500/20 Generic Letter 85-06, ATWS 0 TI2514/01 TMI Action Plan Items 25 TI2515/64 Generic Letter 83-28, ATWS 0 TI2515/65 TMI Action Plan Items- 25 TI2515/69 Bulletin 85-01 " Steam Linding in AFW" 0 TI2515/72 Bulletin 85-02 " Shunt Trip for RTB" 0 TI2515/73 Bulletin 85-03 "Mov Improper Switch Settings" 0 TI2515/76 " Electrical-Equipment Environmental 0 Qualification" TI2515/86 Generic Letter 81-21, " Natural Circulation 0 Cooldown" TI2515/87 " Regulatory Guide 1.97 Instrumentation" 0 TI2515/88 " Flooding Protection" 0 TI2515/91 " Generic Letter 83-28" ATWS 0 TI2515/92 "EOP Team" 0 TI2515/93 "DG Fuel Oil QA" 0 TI2515/94 "PWR Moderator Dilution" 0 TI2515/97 " Maintenance Team" 0 TI2515/98 "High Temp in Containment" 0 TI2515/100"DG Fuel Oil Qaulity" 0 TI2515/101" Loss of Decay Heat Removal" O l

___.____1______________________________________________________________________________________ ___.__..____________________________________________J

, , . r r g

e, L

L . .. .

l Manual Chapter 2514 - Startup Testing Phase General 35501 QA for Startup Test Program 0 72300 Startup Test Procedure Review 0 72301 Startup Test Results Evaluation 0 70302 Startup Test Witnessing and Observation 0 72400 overall Startup Test Program 0 e 72500 Initial Fuel Loading Procedure Review 0 72524 Initial Fuel Loading Witnessing 0 83521 Radiation Protection - Startup 0 84521 Radwaste - Startup 0 Specific i

72564 Precritical Test Procedure Review 0 (Protective Trip Circuit, Group B, and Rod Drop Measurement, Group A) 72566 Precritical Test Procedure Review (RCS 0 Leak Test, Group A, and Pressurizer Effectiveness, Group B) 72570 Initial Criticality Procedure Review 0 (Group A and B) 72572 Low Power Test Procedure Review (Moderator 0 Temperature Coefficient Measurement and Boron Reactivity Worth, Group B, and Rod Worth and Pseudo Rod Ejection, Group A) 72576 Power Ascension Test Procedure Review 0 (Natural Circulation, Group A, and Power Reactivity Coefficient Measurement, Group B) 72578 Power Ascension Test Procedure Review 0 (Evaluation of Core Performance)

(Group A and B) 72580 Power Ascension Test Procedure Review 0 (Turbine Trip, Group B, and Generator Trip, Group'A) 72582 Power Ascension Test Procedure Review: 0 Loss of Offsite Power (Group A and B) 72583 Power Ascension Test Procedure Review: O Shutdown from Outside the Control Room (Group B) ,

72584 Power Ascension Procedure Review 0 i (Evaluation of Flux Asymmetry or Pseudo Rod Ejection Test) (Group A) 72592 Initial Criticality Witnessing 0 72596 Precritical Data Review 0 72600 Power Level Plateau Data Review (25%) 0

]

l 1

m -, m

8i .

c1 e. 2 lm g :: , ,_

  • 72608' Power Level Plateau Data Review.(50%) 0 72616 Power Level Plateau Data Review (75%)- 0

- 72624l Power Level Plateau Data Review (100%)