Supplemental Deficiency Rept CP-85-39 Re Equipment Conduit Interface.Initially Reported on 880111.No Unit 2 Corrective Action Required for Subj Rept.Remaining Rework for Unit 1 Completed
ML20206D347
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 11/09/1988
From: Counsil W, Woodlan D
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CP-85-39, TXX-88773, NUDOCS 8811170051
Download: ML20206D347 (1)


Text

_-

k/

'\

m FE Log # TXX-88773

__. = File # 10110

= c 903.10 7UELECTRIC Ref. # 10CFR50.55(e) m=j,Cg, November 9, 1988  :

, U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555

SUBJECT:

COMANCHEPEAKSTEAMELECTRICSTATION(CPSES)

DOCKET NOS. 50-445 AND 50-446 EQUIPMENT CONDUIT INTERFACE SDAR: CP-85-39 (SUPPLEMENTAL REPORT)

L Gentlemen:

On January 11, 1988, we notified you via our report logged TXX-88035 of the

, corrective actions to resolve this item. Our last report was logged TXX-88447 dated May 13, 1988. This report is submitted to advise you of the revised -

corrective actions for this deficiency. '

TXX-88035, Attachment 1, Page 1 of 1, listed nine (9) cabinets requiring rework. Additional engineering review has concluded that five (5) of those

, cabinets are acceptable without rework. Two of these five (5) cabinets are e

the two installed in Unit 2. Therefore, no Unit 2 corrective action is required for this SDAR.. The remaining rework for Unit I has been completed.

Very truly yours, I ib b

, W. G. Counsil l I

, By:

l D. R. Woodlan Docket Liunsing Manager RSB/mlh i l

c - Mr. R. D. Martin, Region IV  ;

Resident inspectors, CPSES (3)  !

[