Forwards Updated List of Documents Received Re ASLB Hearings,Including Documents on Independent Assessment Program.List Arranged by Subj Category,In Chronological Order,Within Each Subj
ML20137T251
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 01/27/1986
From: Williams N
CYGNA ENERGY SERVICES
To: Redding J
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
References
84042.46, NUDOCS 8602180291
Download: ML20137T251 (56)


Text

- - -_ -

cE 415'397-5600 101 California Street Suite 1000, San Francisco. CA 941115894 January 27, 1986 84042.46 Mr. Jack Redding Texas Utilities Generating Company 400 North Olive Street, L.B. 81 Skyway Tower Dallas, Texas 75201

Subject:

ASLB Documents Transmitted to Cygna Texas Utilities Generating Company Comanche Peak Steam Electric Station Independent Assessment Program-All Phases 1 Job No. 84042

Reference:

N.H. Williams (Cygna) letter to J. Redding (TUGCO), "ASLB Documents Transmitted to Cygna," 84042.044, dated November 8,1985

Dear Mr. Redding:

Attached ~is an updated list of the documents Cygna has received which are related to the ASLB hearings. The new entries are indicated by a revision bar in the right hand column. This list.contains those documents which are of interest to Cygna because they may relate to the Independent Assessment Program. The list is arranged by subject category, in chronological order within each subject.

Please call if you have any questions.

Very truly yours, i

N.H. Williams Project Manager 8602180291 860127 PDR ADOCK 05000445 A PDR Enclosure cc: Mr. W. Horin (Bishop, Cook, et al.) w/ enclosure Mr. D. Pigott (Orrick, Herrington, Sutcliffe) w/ enclosure %ok Mr. J. Bec6 (TUGCO) w/ enclosure V Mr. J. Finneran (TUGC0/EBASCO) w/ enclosure lI Mrs. J. Ellis (CASE) w/ enclosure f gk(J

. Ms. A. Vietti~-Cook ~(USMC) w/ enclosure

'Mr.^ST Treby' (USMC) w/ enclosure

{(7 I - - Q San Francisco Boston Walnut Creek Chicago San Jose Manna det Rey Sacramento Richland Newport Beach

ASLB LOG PHASE 4 JANUARY 17, 1986 SUBJECT ORIGINATOR DATE LOG NO. DESCRIPTION

  • Efr AWS/ASME C'o de TUGC0 05 15 84 80 Applicants' Motion for Summary Disposition 4

126.1 of Certain Case Allegations Regarding AWS and ASME Code Provisions Related to Design Issues and Applicants' Statement of Material Fact's As To Which There Is No Genuine Issue 4

AWS/ASME Cod'e CASE 08 04 84 126.2 CASE's Answer to Applicants' Motion for Summary Disposition of Certain CASE Allegations Regarding AWS and ASME Code Provisions Related to Design Issues in the form of Affidavit of CASE Witness Mark

> Walsh AWS/ASME Code CASE 12 14 85 341 CASE's Response to Applicants' 11/12/85 '

Changes to Affidavits in Support of Applicants' Motions for Summary Disposition and Affidavit of CASE Witness Jack Doyle -

4 (pp 27-33)

Axial Restraints TUGC0 07 09 84 76 Applicants' Motion for Summary 124.1 Disposition Regarding Allegations Concerning Consideration of Force Distribution in Axial Restraints and Affidavit of Robert C. Iotti and John C.,

Finneran, Jr. Regarding Considerations of Force Distribution in Axial Restraints

  • From the 15.1 Log. All other numbers are from the 15.3 Log.

Page 1 of 55

ASLB LOG PHASE 4 JANUARY 24, 1986 SUBJECT ORIGIN DATE LOG NO. DESCRIPTION i

Axial Restraints CASE 08 27 84 124.2 CASE's Partial Answer to Applicants' Statement of Material Facts As to Which There Is No Genuine Issue Regarding Allegations Concerning Consideration of Force Distribution in Axial Restraints in the form of Affidavit of CASE Witness Mark Walsh Axial Restraints CASE 12 14 85 341 CASE's Response to Applicants' 11/12/85 Changes to Affidavits in Support of Applicants' Motions for Summary Disposition and Affidavit of CASE Witness Jack Doyle (pp 50-53)

CAT Inspection NRC 04 13 83 100 Memorandum on Information from Construction Inspection of Comanche Appraisal Peak, UnitsTeam 1 and(CAT)(BN83-29C) 2 and Suurtary

, of Meeting on Comanche Peak Added Assurance Program CPRT NRC 07 13 84 --- Letter to TUGC0 Regarding CPRT .

CPRT NRC 01 24 85 144 Letter Regarding CPRT Action Plan and Comments on Comanche Peak Response Team Issue - Specific Action Plans CPRT* NRC 03 06 85 181 Summy of Meeting between NRC and TUGC0 to Discuss Status of CPRT Efforts in Responding to the Technical Review Team

Findings in the Electrical / Instrumentation Area at CPSES Units 1 and 2 i

!

  • From the 15.1 Log. All other numbers are from the 15.3 Log.

Page 2 of 55

  1. 3LB LOG PHASE 4 JANUARY 24, 1986 SUBJECT ORIGIN DATE LOG NO. DESCRIPTION
CPRT - NRC 03 14 85 143 Transcript of CPRT meeting /

Participants:

4 TUGCO, TERA, Enirgex, Ebasco, CASE, NRC, Cygna. Delian, Worsham, Orrick, Gibbs &

Hill ,

l CPRT NRC 06 13 85 174 Transcript of Meeting l

175

Participants:

NRC. TUGCO, CASE. Tenera, a 203 Teledyne, Stone and Webster .

CPRT* NRC 08 09 85 300 NRC Staff Evaluation of the CPRT Program l Plan .

CPRT* TUGC0 08 13 85 314 Transmittal of CPRT Contracts to CASE CPRT* CASE 08 14 85 327 CASE's First Critique of Applicants' Comanche Peak Response Team (CPRT) Plan -

CPRT* CASE 08 14 85 304 Letter to NRC Regarding CASE's First

Critique of Applicants' CPRT Plan CPRT* CASE 08 15 85 326 Current Evaluation of the CPRT from Trial Trial Lawyers Lawyers for Public Justice
for Public Justice CPRT* TUGC0 08 16 85 310 Letter to Vincent Noonan (NRC) Regarding CPRT/ Quality Aspects
  • From the 15.1 Log. All other numbers are from the 15.3 Log.

Page 3 of 55

ASLB LOG PNASE 4 JANUARY 24, 1986 StBJECT ORIGIN DATE LOG NO. DESCRIPTION

_ s CPRT .* CASE 08 19 85- 240 CASE's Offer of Proof of Lack of

- Independence of Applicants' Latest Plan (CPRT Plan) .

/CPRT NRC 08 29 85 249 Memoran'dum and Order (Proposal .for l: Governance of this Case) l-i' CPRT NRC 09 02 85 265 Memorandum (Applicants' Motion for Modification) and Order CPRT* NRC 10 03 85 422 Board Notification No. 85-087-Letter to -

j' TUGC0 Regarding NRC Staff Evaluation of the

CPRT Program Plan-Detailed Comments 1

2 CPRT TUGC0 10 09 85 269 Applicants' (1) Response to CASE's 9/4/85 l Request for Production of Documents and (2) j Motion for Protective Order 4

i CPRT* TUGC0 10 12 85 403 Letter to Trial Lawyers for Public Justice i Regarding the CPRT Program Plan i CPRT NRC 10 18 85 285 Summary of Meeting Held on 10/2-3/85 - J' j Basis for Establishing the Homogeneous l

Hardware Populations for the Construction

! Adequacy Review, and the Stone and Webster i Pipe and Pipe Support Reanalysis Program 4

CPRT TUGC0 11 05 85 286 Handouts from Public Meeting in Granbury.

11/5-6/85 j

1 CPRT NRC 11 11 85 291 Memorandum (Statistical Inferences fron l CPRT Sampling)

  • From the 15.1 Log. All other numbers are from the 15.3 Log. .

-' ~

Page 4 of 55 _

e ,

. ASLB LOG PHASE 4 JANUARY 24, 1986

$UBJE'CT ORIGIN DATE LOG NO. DESCRIPTION 4

1 CPRT - NRC 12 02 85 305 Summary of Meeting Held 11/5-6/85 - First j

Monthly Status Meeting to Discuss the

- Activities Described in the Applicants' Program Plan CPRT* NRC 12 02 85 474 Letter to TUGC0 Re: Sampling Plan for l

} Visual Resinspection of Welds a l

CPRT* Ropes & Gray 12 16 85 493 Letter to NRC Re: CPSES Docket N0s. 50-445 and 50-446 5 CPRT - Civil j Structural NRC 03 06 85 146 Transcript of meeting between TUGC0 and the NRC Regarding Comanche Peak Steam Electric Station - Civil / Structural Action Plan

{

Participants:

CASE, TERA, JBA, Brown &

Root. TUGCO, NRC, DELIAN i, CPRT - Civil j' Structural NRC 06 18 85 176 Transcript of Meeting on Recalculation of Seismic Response Spectra

Participants:

NRC, TUGCO, BNL, RLCA, Gibbs & Hill, j

Teledyne

! CPRT - Civil i Structural

  • NRC 06 24 85 247 Board Notification No.85-065 Sumary of Meeting between NRC Staff and TUGC0 .

Concerning a Reanalysis of the Rock-Structure Interaction for Comanche i Peak

  • From the 15.1 Log. All other numbers are from the 15.3 Log.

Page 5 of 55

ASLB LOG PHASE 4 JANUARY 24, 1986 SUBJECT ORIGIN DATE LOG NO.- DESCRIPTION CPRT - Piping

  • TUGC0 11 18 85 456 Letter to NRC Re: CPSES Docket Nos 50-445 and 50-446 5

' Code Cases M-397 and N-411

Conduit / Cable Tray NRC 03 14 84 36 Inspection Summary of Inspection Conducted
12/20/83 - 01/30/84 (Report 50-445/83-52)

Conduit / Cable Trays

  • TUGC0 08 09 85 296 Letter Regarding CPSES Conduit Support Spans QA File: CP-85-19, SDAR-180

.' Conduit / Cable Trays

  • TUGC0 09 05 85 333 Letter to NRC Regarding Conduit Support

!' Spans .

QA File: CP-85-19, SDAR-180

. Conduit / Cable Trays

  • TUGC0 09 30 85 371 Letter to MRC Regarding Cable Tray Hanger Design QA File: CP-85-35,.SDAR-196 Conduit / Cable Trays
  • TUGC0 09 30 85 377 Letter to NRC Regarding Conduit Support System QA File: CP-85-34,- SDAR-195 Conduit / Cable Trays
  • TUGC0 10 10 85 401 Letter to NRC Regarding Computer Program Errors QA File: CP-85-41, SDAR-203 Conduit / Cable Trays
  • TUGC0 10 10 85 399 Letter to NRC Regarding Equipment Conduit Interface QA File: CP-85-39, SDAR-201  ;

l

  • From the 15.1 Log. All other numbers are from the 15.3 Log.

I Page 6 of 55

ASLB LOG PHASE 4 JANUARY 24. 1986 ,

SUBJECT ORIGIN DATE LOG NO. DESCRIPTION Conduit / Cable Trays

  • TUGC0 10 16 85 415 Letter to NRC Regarding Electrical Raceway Support System .

QA File: CP-85-31 SDAR-192 Conduit / Cable Trays

  • TUGC0 10 16 85 417 Letter to NRC Regarding Thermolag QA File: CP-85-42, SDAR-204 r

Conduit / Cable Trays

  • TUGC0 11 07 85 449 Letter to NRC Re: CPSES Docket No. 50-446 Equipment Conduit Interface l

Conduit / Cable Trays

  • TUGC0 11 07 85 450 Letter to NRC Re: CPSES Docket Nos. 50-446 Computer Program Errors Conduit / Cable Trays
  • TUGC0 11 14 85 453 Letter to NRC Re: CPSES Docket Nos 50-445 and 50-446.

Cable Tray Hanger Design Adequacy Conduit / Cable Trays

  • TUGC0 12 20 85 497 Letter to NRC Re: CPSES Docket Mos. 50-445 Cable Tray Hanger Reverification Program Corrective Action Systems ASL8 06 16 83 49 Transcript Excerpts of Hearings on Corrective Action Systems

Participants:

ASLB, NRC, CASE Texas PUC Di f ferential Displacements TUGC0 06 22 84 78 Applicants' Motion for Summary Disposition 127.1 of CASE Allegations Regarding Differential Displacement of Large-Framed. Wall-to-Wall and Floor-to-Ceiling Pipe Supports and Affidavit of R.C. Iotti and J.C. Finneran, Jr., Regarding Differential Displacement of Large Frame Pipe Supports

  • From the 15.1 Log. All other numbers are from the 15.3 Log.

Page 7 of 55

ASLB LOG PHASE 4 JANUARY 24, 1986 SUBJECT ORIGIN DATE LOG NO. DESCRIPTION 8

Di fferential Displacements CASE 08 27 84 127.2 CASE's Partial Answer to Applicants' Statement of Material Facts As to Which

!! There Is No Genuine Issue Regarding Differential Displacements of Large-Framed, Wall-to-Wall and Floor-to-Ceiling Pipe

,; Support! ,

Differential Displacements TUGC0 09 28 84 127.3 Applicants' Reply to CASE's Answer to Applicants' Motion for Summary Disposition Regarding Differential Displacement of Large-Framed, Wall-to-Wall and Floor-to-Ceiling Pipe Supports

, Document Control TUGC0 00 00 00 43 Testimony of Frank M. Strand Regarding Cygna Review of Document Control Document Control TUGC0 00 00 00 44 Testimony of Jesse Michael Strange Regarding Cygna Review of Document Control .

Document Control TUGC0 00 00 00 46 Additional Testimony of Heyward Asgell

Hutchinson, Jr. Regarding Cygna Review of Document Control Document Control CASE 02 10 84 8 CASE's Motion to Late File Testimony of New Witness and Testimony of CASE Witness Dobie i

Hatley i

  • From the 15.1 Log. All other numbers are from the 15.3 Log.

Page 8 of 55

ASL8 LOG PHASE 4 JANUARY 24. 1986 SUBJECT ORIGIN DATE LOG NO. DESCRIPTIGN Document Control TUGC0 04 12 184 45 Applicants' Motion Regarding Advance Notice of Cygna Review.of Document Control Document Control NRC 04 24 84 91 Board Notification No.84-085 - Department of Labor Findings'on Comanche Peak "Whistleblowers" Plus Two Dobie Hatley Interviews Effects of Gaps TUGC0 05 18 84 133.1 Applicants' Motion for Summary Disposition Regarding the Effects of Gaps on Structural Behavior Under Seismic Loading Conditions and Affidavit of Robert C. Iotti and John C. Finneran, Jr. Regarding the Effects of

, Gaps on Structural Behavior Under Seismic Loading Conditions and Analysis of Piping Systems with Nonlinear Supports Subjected to Seismic Loading (Report) by D.A. Barta and Seismic Analysis of Piping with Nonlinear Supports (Report) by D.A. Barta et al. and Applicants' Statement of Material Facts As to Which There Is No Genuine Issue Regarding the Effects of Gaps on Structural Behavior Under Seismic loading Conditions

  • From the 15.1 Log. All other numbers are from the 15.3 Log.

Page 9 of 55

/

ASLB LOG PHASE 4~

JANUARY 24, 1986 SUBJECT ORIGIN DATE LOG NO. DESCRIPTION Effects of Gaps TUGC0 05 18 84 57 Applicants' Motion for Summary Disposition Regarding the Effects of Gaps on Structural Behavior.Under Seismic Loading Conditions Effects of Gaps CASE 08 12 84 133.2 CASE's Answer to Applicants' Statement of

'1 Material Facts As to Which There Is No Genuine Issue Regarding the Effects of Gaps on Structural Behavior Under Seismic Loading Conditions in the form of Affidavit of CASE Witness Mark Walsh Effects of Gaps TUGC0 10 26 84 133.3 Applicants' Reply to (1) CASE's Answer to Applicants' Motion for Summary Disposition >

. Regarding the Effects of Gaps and (2) Board Chairman's " Preliminary Views" Regarding-Additional Pleadings and Affidavit of Robert C. Iotti and John C. Finneran, Jr.

in Reply to CASE's Answer to Applicants'

~ Motion for Summary Disposition Regarding the Effects of Gaps Effects of Gaps CASE 12 16 84 133.4 CASE's Fourth Round Answer to Applicants' Reply to CASE's Answer to Applicants' Motion for Summary Disposition Regarding the Effects of Gaps in the form of Affidavit of CASE Witness Mark Walsh

  • From the 15.1 Log. All other numbers are from the 15.3 Log.

Page 10 of 55

k ASLB LOG PHASE 4 JANUARY 24, 1986 SUBJECT ORIGIN DATE LOG N0. DESCRIPTION Effects of. Gaps ' CASE 12 14 85 341 CASE's Response to Applicants' 11/12/85 Changes to Affidavits in Support of Applicants' Motions for Sunnary Disposition and Affidavit of CASE Witness Jack Doyle (pp. 35-37)

  • Electrical Issues
  • TUGC0 08 05 85 291 CPSES Docket Nos. 50-445 and 50-446 Breaker Coordination Study Electrical Issues
  • TUGC0 09 19 85 343 Letter to NRC Regarding Electrical Raceway Support. System QA File: CP-85-31, SDAR-192 Electrical Issues
  • TUGC0 10 10 85 397 Letter to NRC Regarding Control Board Separation Material QA File: CP-85-38, SDAR-200 FSAR* TUGC0 10 15 85 409 Letter to NRC Regarding FSAR Amandment 56 Description Fire Protection
  • NRC 06 07 85 225 Summary of Meeting between NRC Staff and TUGC0 to Discuss the Comanche Peak Fire Protection Program Fire Protection
  • TUGC0 06 26 85 263 Letter Regarding Docket Nos. 50-445 and 50-446 on Fire Protection
  • From the 15.1 Log. All other numbers are from the 15.3 Log.

Page 11 of 55

4 ASLB LOG PHASE 4 JANUARY 24.-1986

! SUBJECT ORIGIN DATE LOG NO. DESCRIPTION Fire Protection

  • TUGC0 08 09 85 297 CPSES Fire Protection
QA File
CP-85-25 SDAR-186 1

Fire Protection

  • TUGC0 10 01 85 378 Letter to NRC Regarding Fire Protection QA File: CP-85-25, SDAR-186

! Fire Protection

  • NRC 10 24 85 436 Letter to TUGC0 Regarding Issuance of

,' Supplement No.12 to NUREG-0797 Friction Forces TUGC0 05 16 84 80 Applicants' Motion for Summary Disposition 74 Regarding _ Consideration of Friction Forces i

118.1 in the Design of Pipe Supports With Small Thermal Movements and Affidavit of John C.

Finneran, Jr. Regarding Consideration of Friction Forces in the Design of Pipe Supports With Small Thermal Movements 4

Friction Forces CASE 08 06 84 118.2 CASE's Answer to Applicants' Statement of i Material Facts As to Which There Is No I Genuine Issue Regarding Consideration of Friction Forces in the Design of Pipe Supports with Small Thermal Movements in the form of Affidavit of CASE Witnesses Jack Doyle and Mark Walsh-Friction Forces TUGC0 09 19 84 118.3 Applicants' Reply to CASE's Answer to Applicants' Motion for Summary Disposition Regarding Consideration of Friction Forces and Affidavit of John C. Finneran, Jr. in Support of Applicants' Reply to CASE's Answer to Applicants' Motion for Summary Disposition Regarding Consideration of Friction Forces

  • From the 15.1 Log. All other numbers are from the 15.3 Log.

i Page 12 of 55

ASLB LOG PHASE 4 JANUARY 24,1986 SUBJECT ORIGIN' DATE LOG NO. DESCRIPTION i

Friction Forces CASE 10 ,01 84 118.4 CASE's Answer to Applicants' Reply to CASE's Answer to Applicants' Motion for Summary Disposition Regarding Consideration

! of Friction Forces in the form of Affidavit of CASE Witness Mark Walsh i

Friction Forces

  • CASE 06 13 85 221 Further Clarification of CASE's Position Regarding Applicants' use of 3 S, Friction Forces CASE 12 14 85 341 CASE's Response to Applicants' 11/12/85 Changes to Affidavits in Support of Applicants' Motions for Summary Disposition and Affidavit of. CASE Witness Jack Doyle (pp.25-26)

General ASLB 02 10 84 114 Telephone Conference Transcript Partici pants: ASLB, TUGCO, NRC, CASE General CASE 02 16 84 7 CASE's Expected Findings of Fact for 2/20-24/84 Hearings General NRC 02 28 84 18 Telephone Conference Transcript

Participants:

ASLB, MRC, TUGCO, CASE, State of Texas General ASLB 03 15 84 29 Memorandum (Clarification of Open Issues) 32 1

  • From the 15.1 Log. All other numbers are from the 15.3 Log.

Page 13 of 55

ASLB LOG l PHASE 4 JANUARY 24. 1986 SUBJECT ORIGIN DATE LOG NO. DESCRIPTION l

l General . NRC 03 18 84 53 Telephone Conference Transcript

Participants:

.ASLB, TUGCO, NRC, CASE, Cygna, State of Texas General CASE 03 22 84 31 CASE's Comments on 3/21/84' Meeting with Cygna i

General NRC 03 30 84 34 Telephone Conference Transcript

Participants:

ASLB, TUGCO, NRC, CASE, Cygna, State of Texas General NRC 04 19 84 93 NRC Staff Response to CASE's Motions Regarding Board's 3/15/84 Memorandum General NRC 06 05 84 57 NRC Staff's Response to Applicants' Motion to Obtain Access to Information Regarding Investigations at Comanche Peak or for Alternative Relief General NRC 06 06 84 189 Telephone Conference Transcript

Participants:

NRC. TUGCO, CASE BNL .

General NRC 06 08 84 190 Transcript of Meeting between TUGC0 and NRC Regarding Summary Disposition General NRC 06 20 84 180 Transcript of Meeting

Participants:

NRC, TUGCO, Ebasco i

  • From the 15.1 Log. All other numbers are from the 15.3 Log.

.Page 14 of 55

ASLB LOG

- PHASE 4 C JANUARY 24, 1986 SUBJECT ORIGIN BATE LOG NO. DESCRIPTION General * - NRC 08 06 84 79 Transcript of Discussion on Motions for Summary Disposition Filed by Applicant

Participants:

TUGCO, NRC, CASE

. General NRC 08 08 84 185 Transcript of Meeting on Question on Summary Dispositions Filed by Texas Utilities on Comanche Peak

Participants:

TUGCO, NRC l: General NRC 08 23 84 187 Transcript of Meeting between TUGC0 and NRC on Motions for Summary Disposition

Participants:

NRC, Bishop et al., TUGCO, CASE, REA

'$ General TUGC0 09 24 84 188 Applicants' Responses to NRC Questions

, Regarding Applicants' Motions for Summary Disposition from Meetings on 8/8-9/84 and 8/23/84 General NRC 11 21 84 112 NRC Enforcement Interview and Telephone Conference Transcript

Participants:

NRC,

TUGCO, Cygna, CASE, Ebasco, Dallas area media General CASE 12 18 84 116 Memorandum (Reopening Discovery; Misleading Statement)
  • From the 15.1 Log. All other numbers are from the 15.3 Log.

Page 15 of 55 4

ASLB LOG PHASE 4 JANUARY 24, 1986 SINK 1ECT ORIGIN DATE LOG NO. DESCRIPTION General - ASLB 12 18 84 214 Memorandum (Reopening Discovery; Misleading Statement)

General

  • NRC 01 28 85 145 Response to GAP letter of 12/30/84 1 Regarding CPRT,' Cygna's Phases 3 and 4 Audit, and NRC Controls over CPSES Actions General
  • NRC 02 21 85 160 Transcript of Meeting between TUGC0 and CASE Concerning Hearing and Licensing Issues General
  • NRC 04 22 85 200 Board Notification No.85-043 - Recent '

Letters between Cygna, the Applicants and the NRC Staff Relating to Comanche Peak General

  • NRC 04 25 85 203 Board Notification No.85-039 - Sunsaary of Meeting between CASE. Texas Utilities and the NRC Staff Relating to the Concerns of Messrs. Walsh and Doyle Regarding the Comanche Peak Plant and Transcript of Discussion on 03/23/85 l

Participants:

NRC, CASE, CPRT General

  • CASE / Lawyers 05 28 85 222 Requests for Documents for Review and for Public Inspection Justice l

l l

l

!

  • From the 15.1 Log. All other numbers are from the 15.3 Log.

Page 16 of 55

ASLB LOG

.PNASE 4 JANUARY 24, 1986 SUBJECT ORIGIN DATE LOG NO. DESCRIPTION General - TUGC0 05 29 85 168 Applicants' Memorandum Regarding Supplemental Document Production General

  • NRC 05 30 85 223 Memorandum (Clarification of LBP 85-16)

General CASE 06 10 85 169 CASE's Answer in Opposition to Applicants'

6/10/85 Motion to Extend Time General TUGC0 06 10 85 171 Applicants' Motion to Extend Time General NRC 06 10 85 172 NRC Staff Response to CASE Request for Immediate Order Directing Staff to Preserve Documents

, General CASE 06 11 85 173 CASE's Opposition to Applicants' Motion to Extend Time to File Their " Current Management Views" Brief l General NRC 06 12 85 165 Memorandum (Request for an Extension of i Time)

General
  • Bishop, et al. 06 17 85 251 Response to CASE Discovery Requests et al.

i (Partial list)

)

General

  • CASE 06 24 85 259 Letter to Robert Wooldridge Regarding i

Discovery Requests I

i

  • From the 15.1 Log. All other numbers are from the 15.3 Log.

i Page 17 of 55

)

ASLB LOG PHASE 4 JANUARY 24, 1986

' ~

SUBJECT ORIGIN DATE LOG 19. DESCRIPTION ~

General - NRC 06 24 85 213 Board Notification and CASE's Motions: for Discovery Regarding the MAC Report and Issues Raised by the MAC Report and/or for Hearings and/or Evidentiary Depositions General NRC 06 28 85 209 Third Supplement to NRC Staff Response to CASE's Request for Admissions General NRC 06 28 85 217 Applicants' Current Management Views and i Management Plan for Resolution of All

Issues

! General TUGC0 07 03 85 211 Applicants' Second Partial Response to Ripe Discovery Requests General TUGC0 07 05 85 178 Applicants' First Partial Response to Ripe Discovery Requests-

! i General

  • CASE 07 06 85 244 CASE's Response to Applicants' 6/28/85 Current Management Views and Management i Plan for Resolution of All Issues General TUGC0 07 08 85 179 Applicants' Response in Opposition to CASE's Motion for Inunediate Hearings, ,

Evidentiary Depositions, and/or Discovery i

! Regarding the MAC Report 1

l i

i

  • From the 15.1 Log. All other numbers are from the 15.3 Log.

Page 18 of 55 i

I

ASLB LOG PHASE 4 JANUARY 24, 1986 SUBJECT ORIGIN DATE LOG NO. DESCRIPTION General -

NRC 07 11 85 208 NRC Staff Response to CASE's Motions for Discovery on the MAC Report General

  • Bishop, et al. 07 15 85 273 Letter Regarding Appeal Board Decision in the Diablo Cany6n Proceeding (ALA8-814)

General CASE 07 22 85 220 CASE's Response to the Alleged Mootness of Docket 2 Issues and Proposed Schedule for Docket 2 General CASE 07 22 85 224 CASE's Response to the Alleged Mootness of Docket 2 Issues and Proposed Schdule for Docket 2 General ASLB 07 23 85 215 Memorandum and Order (Motions Related to the MAC Report)

General TUGC0 08 13 85 231 Applicants' Response to CASE's Motion to Compel July 3,1985 Discovery General

  • TUGC0 08 14 85 305 Letter to NRC Regarding CPSES Docket Nos.

50-445 and 50-446 Clarification of Breaker Coordination Study General

  • NRC 08 14 85 307 Letter to W.G. Counsil (TUGCO) Regarding Request for Additional Information Concerning Protection from Jet Impingement Outside Containment i

l

!

  • From the 15.1 Log. All other numbers are from the 15.3 Log.

Page 19 of 55

ASLB LOG

. PHASE 4 JANUARY 24, 1986 l

i

SUBJECT ORIGIN DATE LOG NO. DESCRIPTION ,

l ...

General - TUGC0 08 16 85 247 Current Status of Discovery i General NRC 08 16 85 232 Memorandum (Current Status of Discovery) l General
  • NRC 08 22 85 328 Letter to ASLB Regarding NRC Staff Intentions Regarding Two CASE Proposals and i One CASE Motion
General TUGC0 08 28 85 251 Applicants' Motion for Clarification and/or
Reconsideration of August 16, 1985 i Memorandum and Order (Current Status of

! Discovery) j General

  • TUGC0 08 30 85 323 Letter to NRC Regarding CPSES Containment 1 Isolation Valves General TUGC0 09 03 85 252 (1) Applicants' Response to CASE's Motion
for Board to Order Applicants to Supply

! Documents to Board; (2) Motion for l Immediate. Board Order for Applicants to i Preserve Evidence and Offer of Proof in .

Support Thereof; (3) CASE's Offer of Proof of Lack of Independence of. Applicants' Latest Plan (CPRT Plan); and (4) CASE's Proposal Regarding Design / Design QA Issues in Response to Applicants' 6/28/85 Current

! Management Views and Management Plan for Resolution of All Issues t

f i

  • From the 15.1 Log. All other numbers are from the 15.3 Log.

Page 20 of 55 i

i

'ASLB LOG PHASE 4 i

JANUARY 24,1986 SUBK CT ORIGIN DATE LOG NO. DESCRIPTION General * . CASE 09 04 85 383 CASE's Request for Document Production General TUGC0 09 25 85 420 Applicants' Memorandum in Support of Motion

! for Modification with Respect to the-i Board's Memorandum of 8/29/85 and i Applicants' Motion for Modificaton with l Respect to the Board's Memorandum of i 8/29/85 (Proposal for Governance of This

! Case)

! General TUGC0 10 21 85 271 Applicants' Petition for Directed l Certification of Licensing Board Order of October 2, 1985

General
  • CASE 10 26 85 277 CASE's (Main Docket) Response to Board's i 10/15/85 Request Regarding Discovery Matters General NRC 11 08 85 289 Memorandum (Withdrawal of Written Filings lg
Motion) and Order 1

General NRC 11 25 85 303 Memorandum (Reconsideration of Misrepresentation Memorandum) and Order ,

j General TUGC0 12 05 85 334 Applicants' Statement of Continuing Intent to Withdraw Motions for Summary Disposition

\g I

t I

  • From the 15.1 Log. All other numbers are from the 15.3 Log.

1 I Page 21 of 55 i

4

ASLB LOG PHASE 4 i JANUARY 24. 1986

[ SUBJECT ORIGIN DATE LOG NO. DESCRIPTION Generic Stiffness TUGC0 05 21 84 75 Applicants' Motion for Sumary 121.1 Disposition Regarding Use of Generic Stiffnesses Instead of Actual Stiffnesses in Pjping Analysis and Affidavit of R.C.

Iotti and John C. Finneran, Jr. Regarding Use of Generic Stiffnesses Instead of Actual Stiffnesses in Piping Analysis Generic Stiffness CASE 12 14 85 341 CASE's Response to Applicants' 11/12/85 Changes to Affidavits in Support of Applicants' Motions for Summary Disposition and Affidavit of CASE Witness Jack Doyle (pp. 33-34)

Generic Stiffnesses CASE 08 25 84 121.2 CASE's Partial Answer to Applicants' Statement of Material Facts As to Which There Is No Genuine Issue Regarding Applicants' Use of Generic Stiffnesses

! Instead of Actual Stiffnesses in Piping Analysis in the form of Affidavit of CASE Witnesses Jack Doyle and Mark Walsh Independent Assessment Program

  • CASE 04 11 84 19 Proposed Stipulations and Other Matters Independent Assessment Program CASE 10 20 84 107 CASE's Third Motion for Summary Disposition Regarding Lack of Independence and/or
Credibility of Cygna in the form of Affidavit of CASE Witness Jack Doyle and Which There Is No Genuine Issue Regarding Lack of Independence and/or Creditillity of Cygna
  • From the 15.1 Log. All other numbers are from the 15.3 tog.

I Page 22 of 55 i

ASLB LOG PHASE 4 JANUARY 24, 1986 SWJECT ORIGIN DATE LOG NO. DESCRIPTI M

~

Independent Assessment Program CASE 02 07 84 52 Testimony of CASE Witness Mark A. Walsh (Revised) ,

Independent Assessment Program TUGC0 02 16 84 6 Applicants' Expected Findings of Fact j.' Regarding Independent Assessment Program for Comanche Peak Steam Electric Station i

- Independent Assessment Program CASE 02 29 84 17 CASE's Motion Regarding CASE's Summary of Cross-Examination Areas Supplied to Cygna

, on 2/22/84

. Independent j Assessment Program CASE 03 05 84 25 Affidavit of Jack Doyle (Corrections to His

Testimony at February Hearings)

Independent 4

Assessment Program

  • CASE 03 13 84 7 Additional Questions Related to Prefiled Testimony of Nancy H. Williams Independent .

Assessment Program

  • CASE 03 15 84 8 Additional Questions Related to Prefiled Testimony of Nancy H. Williams
  • From the 15.1 Log. All other numbers are from the 15.3 Log.

Page 23 of 55

. .-_ - . . .. - = - . - - .. _ - .

ASLB LOG PHASE 4 JANUARY 24, 1986 SUBJECT MIGIR DATE LOG W. OESCRIPTION f

4 Independent -

Assessment Program

  • CASE 03 15 84 9 Letter Regarding Proposed Stipulations Independent Assessment Program
  • CASE 03 29 84 14 CASE Request for Additional Information
Regarding Prefiled Testfomony of Nancy H.

WillIans Independent i Assessment Program

  • CASE 03 31 84 15 Clarification - Doyle No.16 - Regarding i Prefiled Testimony of Nancy H. Williams 1

Independent Assessment Program

  • CASE 04 07 84 18 Outstanding Document Requests Regarding Prefiled Testimony of Nancy H. Williams Independent Assessment Program Cygna 04 12 84 28.1 Testimony of Nancy H. Williams in Response to CASE Questions of 2/22/84 to Cygna '

Energy Services l

l Independent l Assessment Program

  • CASE 04 18 84 21 Letter Regarding Cross-Examination l Documents and 0ther Matters i

4 Independent 4

Assessment Program NRC 04 19 84 48 Transcript of NRC Meeting with Cygna Energy i

Services on Independent Assessment Program I

i

  • From the 15.1 Log. All other numbers are from the 15.3 Log.

l Page 24 of 55

)

)

l

ASLB LOG PNA5E 4 JANUARY 24,1986

$UBJECT (RIGIN DATE LOG NO. DESCRIPTION Independent-Assessment Program CASE 04 27 84 51 .Wnded Testimony of CASE Witness Jack Doyle Independent -

Assessment Program CASE 04 27 84 94 Amended Testimony of CASE Witness Jack

!, Doyle Independent Assessment Program CASE 11 02 84 106 CASE's Answer to, and Motions Regarding, Applicants' Motions to Set Schedule for l Briefs Addressing Cygna Phase 3 Issues and l- for Expedited Responses l Independent i

Assessment Program TUGC0 11 27 84 108 Applicants' Answer to CASE's Third Motion for Summary Disposition I

Independent

Assessment Program Cygna 12 07 84 109 Cygna Response in Opposition to CASE's
Third Motion for Summary Disposition Regarding Lack of Independence and/or Credibility of Cygna j

Independent Assessment Program Cygna 12 07 84 110 Affidavit of Cygna Witness Nancy H.

Williams in Opposition to CASE's Third Motion for Sununary Disposition

  • From the 15.1 Log. All other numbers are from the 15.3 tog.

Page 25 of 55

ASLB LOG PHASE 4 JARBARY 24. 1986 S SDBJECT ORIGIN DATE LOG W. DESCRIPTION P

l Independent -

Assessment Program NRC 01 10 85 115 Transcript of NRC Meeting with Cygna Energy Services on Comanche Peak Steam Electric I

Station Independent Assessment Program (Phase 3)

Independent Assessment Program

  • NRC 04 22 85 207 Transcript of Meeting between Cygna and NRC Staff on 04/19/84

!. Independent i Assessment Program

  • NRC 04 22 85 207 Board Notification No.85-044 - Meetings

].

between Cygna and the NRC Staff Relating to 1 Comanche Peak i

Independent I Assessment Program NRC 05 21 85 160 Transcript of Meeting on Phase 4 Electrical / Mechanical Systems Review Scope

Participants:

NRC, Cygna Independent .

Assessment Program

  • NRC 05 30 85 217 Board Notification No.85-060 - Sumary of Meeting on 4/26/85 between NRC and Cygna to

, Brief MRC Management on Comanche Peak i Independent Assessment Program Effort 1

Independent Orrick, Assessment Program

  • et al. 08 23 84 63 Response to Peter Bloch of ASLB Regarding Independent Assessment Program - Phase 3 i Design Control Review-j .
  • From the 15.1 Log. All other numbers are from the 15.3 Log.

Page 26 of 55 i

4

i: ASLB LOG PNRSE 4 JANUARY 24, 1996 SWJECT ORIGIN DATE LOS NO. DESCRIPTION t

i i

Interrogatories CASE 02 02 84 50 CASE's Sixteenth Set of Interrogatories and i Requests to Produce to Applicants 1 '

Interrogatories CASE 05 30 84 57_ CASE's Partial' Answer to Applicants' Ninth Set of Interrogatories to CASE and Requests i to Produce 1

I Interrogatories TUGC0 06 07 85 170 Applicant's Report Regarding Status of Replies to CASE Interrogatories j

Interrogatories CASE 06 24 85 212 CASE's Interrogatories to Applicants and Requests to Produce Re: the MAC Report and

- Issues Raised by the MAC Report i Interrogatories TUGC0 06 28 85 166 Applicants' Second Partial Response to CASE's Fifth Set of Interrogatories Re:

Credibility Interrogatories TUGC0 07 01 85 210 Applicants' Third Partial Response to CASE's Fifth Set of Interrogatories Re:

Credibility 1

Interrogatories CASE 07 29 85 225 Motion to Compel Responses to Interrogatories Filed July 3,1985 f

}

Interrogatories CASE 07 29 85 222 CASE Interrogatories Regarding the CPRT i

!

  • From the 15.1 Log. All other numbers are from the 15.3 Log.

Page 27 of 55 4

ASLB LOG PNASE 4 JANUARY 24, 1986 SWJECT WIGIN DATE LOG NO. DESCRI MION Interrogatories CASE 08 07 85 228 CASE's Request for Supplementation of

! Applicants' Answers to Previous CASE's Discovery Requests Interrogatories

  • CASE 08 07 85 301 Interrogatory 5' of CASE's 6/24/85 i Interrogatories to Applicants and Requests to Produce Re: the MAC Report and Issues

, Raised by the MAC Report Interrogatories TUGC0 08 13 85 230 Applicants' Answer to CASE's Interrogatories Regarding Premature Implementation of CPRT l Interrogatories TUGC0 08 19 85 254 Applicants' Response to CASE F Interrogatories Regarding the CPRT Interrogatories TUGC0 08 19 85 239 Applicants' Response to CASE

Interrogatories Regarding the CPRT Interrogatories CASE G3 30 85 245 CASE Interrogatories Regarding Premature rec'd - no date given Implementation of CPRT for when it was generated l Interrogatories
  • Ropes & Gray 10 22 85 427 Letter to NRC Regarding Applicants' l Response to CASE's 08/27/85 Interrogatories
to Applicants and Requests to Produce and

. Request for Protective Order i

l 1

  • From the 15.1 Log. . All other numbers are from the 15.3 Log.

j Page 28 of 55 i

i 1

ASLB LOG PMASE 4 JANUARY 24. 1986

$UBJECT ORIGIN DATE LOG NO. DESCRIPTION Local Displacements j and Stresses TUGC0 06 18 84 82 Applicants' Motion for Summary Disposition 74 Regarding Consideration of Local 120.1 Displacements and Stresses and Affidavit of John C. Finneran, Jr. Regarding Consideration of Local Displacements and i Stresses 1 Local Displacements and Stresses TUGC0 06 18 84 71 Affidavit of John C. Finneran, Jr.

I Regarding Consideration of Local Displacements and Stresses local Displacements

  • and Stresses TUGC0 06 20 84 72 Applicants' Statement of Material . Facts As To Which There Is No Genuine Issue Regarding Consideration of Local
Displacements and Stresses Local Displacements and Stresses CASE 08 25 84 125.2 CASE's Answer to Applicants' Statement of 1

Material Facts As to Which There Is No

Genuine Issue Regarding Consideration of Local Displacements and Stresses in the form of Affidavit of CASE Witness Jack Doyle i
  • From the 15.1 Log. All other numbers are from the 15.3 Log.

Page 29 of 55

ASLB LSE PNASE 4 JANBARY 24,1996

$UBKCT ORIGIN DATE LOG NO. DESCRIPTIMI Local Displacements and Stresses TUGC0 09 28 84 125.3 Applicants Reply to CASE's Answer to Applicants' Motion for Summary Disposition Regarding Local Displacements and Stresses and Affidavit of John C. Finneran, Jr. In Support of Applicants' Reply to CASE's Answer to Applicants' Motion for Summary Disposition Regarding Local Displacements local Displacements and Stresses CASE 10 03 84 125.4 CASE's Answer to Applicants' Reply to CASE's Answer to Applicants' Motion for Sununary Disposition Regarding Local Displacements and Stresses in the form of Affidavit of CASE Witness Jack Doyle MAC Report

  • Worsham, et al. 05 29 85 257 Letter to the ASL8 Regarding Supplementation of Applicants' Response to CASE's Request for Production MAC Report CASE 07 22 85 219 CASE Motion to Compel Response to Interrogatories and Document Production Request Related to MAC Report MAC Report CASE 07 22 85 221 CASE's Motion to Compel Answers to CASE's 6/24/85 Interrogatories to Applicants and Requests to Produce Re: the MAC Report and Issues Raised by the MAC Report
  • From the 15.1 Log. All other numbers are from the 15.3 Log.

Page 30 of 55

ASLB LOG PHASE 4 JANUARY 24,1906

~

SUBJECT ORIGIN DATE LOG IW. DESCRIPTION MAC Report - CASE 08 05 85 227 CASE's Motion for Reconsideration of Board's 7/22/85 Memorandum and Order (Motions Related to the MAC Report)

MAC Report TUGC0 08 14 85 238 Applicants' Res>onse to CASE's Motion for Reconsideration of Board's 7/22/85 Memorandum and Order (Motions Related to the MAC Report)

MAC Report

  • NRC 08 16 85 316 Board Notification No. 85-076: Update of Board Notification 85-067 Regarding Office of Investigation Efforts on the Facts Surrounding TUGCO's Withholding of a 1978 Management Analysis Company (MAC) Report Mac Report TUGC0 12 10 85 297 Applicants' Supplemental Responses to

) CASE's Interrogatories Re: the MAC Report and Issues Raised by the MAC Report (Third Supplement)

Management Plan CASE 05 09 85 205 CASE's Proposed Case Management Plan (Docket 2)

Management Plan CASE 05 09 85 207 CASE Memorandum in Support of its Case Management Plan and in Opposition to Applicant's Case Management Plan (Docket 2) l l

l

  • From the 15.1 Log. All other numbers are from the 15.3 Log.

Page 31 of 55

A KB LOS PHASE 4 o JANUARY 24, 1986

$UBKCT, ORIGIN DATE ~ LOG NO. DESCRIPTION

~

,) .; . -

'N Management Plan NRC 05 10 85 2 06 NRC Staff Comments on Applicants' Proposed Case Management Plan l Management Plan CASE i 05 13 85 161 CASE's Answer to Applicants' 4/26/85 Proposed Case Management Plan-I

Management, Plan CASE 07 29 85 223 CASE's Initial Response to Applicants' 6/28/85 Current Management Views and Management Plan for Resolution of All Issues 1

Management Plan NRC 08 02 85 229 NRC Staff Response to Applicants' Statement of Current Views and Proposed Case Management Plan Mechanical Systems

  • NRC 08 06 85 292 NRC Staff Evaluation of Comanche Peak Unit 1 Inservice Testing Program for Pumps and Valves Mechanical Systems

QA File: CP-85-23 SDAR-184

Mechanical Systems
  • TUGC0 09 30 85 375 Letter to NRC Regarding Containment i'

Isolation Valves QA File: CP-85-22. SDAR-183 i

i i

J q

  • From the 15.1 Log. All other numbers are from the 15.3 Log.

Page 32 of 55

.or

ASLB LOG PHASE 4 JANBARY 24. 1986 SUBK CT ORIGIN DATE LOG IW. DESCRIPTION 1

Mechanical Systems

  • TUGC0 10 10 85 400 Letter to NRC Regarding Qualification of Plant Temperatures QA File: CP-85-43. SDAR-205 Mechanical Systems
  • TUGC0 10 14 85 4 06 Letter to NRC Regarding the Impact' of HELB

. Temperatures on Qualified Equipment.Dutside Containment QA File: CP-84-12. SDAR-136 Mechanical Systems

j QA File: CP-85-32. SDAR-193 L

iI NRC Inspection

Report
  • NRC 09 20 85 384 Letter to NRC Regarding NRC Inspection 85-C2 dated 9/11/85 1

i NRC Inspection Report NRC 09 26 85 267 Letter to ASLB Regarding NRC Inspection l Report 85-03/85-02 dated 9/17/85  ;

I OBE/SSE CASE 12 14 85 341 CASE's Response to Applicants' 11/12/85

' Changes to Affidavits in Support of

Applicants' Motions for Summary Disposition i and Affidavit of CASE Witness Jack Doyle (pp 37-40) 1 i

I 1

l

  • From the 15.1 Log. All other numbers are from the 15.3 Log.

} Page 33 of 55 I

I

ASLB LOG PHASE 4 JANUARY 24,1986

~

$UBJECT ORIGIN DATE LOG NO. DESCRIPTION OBE/SSE Loading TUGC0 05 16 84 122.1 Applicants' Motion for Summary Disposition 80 Regarding Alleged Errors Made in Determining Damping Factors for OBE and SSE Loading Conditions and Affidavit of Robert C. Iotti Regarding Alleged Errors Made in Determining Damping Factors for OBE.and SSE Loading Conditions and Applicants' Statement of Material Facts As to Which There Is No Genuine Issue Regarding Appilcants' Consideration of Damping Factors for OBE and SSE Loading Conditions OBE/SSE Loading CASE 08 04 84 122.2 CASE's Answer to Applicants' Statement of

- Material Facts As to Which There Is No Genuine Issue Regarding Applicants' l Consideration of Damping Factors for OBE and SSE Loading Conditions in the form of Affidavit of CASE Witness Mark Walsh OBE/SSE Loading TUCCO 09 20 84 122.3 Applicants' Reply to CASE's Answer to l Applicants' Motion Regarding Alleged Errors I Made in Determining Damping Factors for OBE and SSE Loading Conditions and Affidavit of Robert C. Iotti in Support of Applicants' l Reply to CASE's Answer to Applicants' Motion Regarding Alleged Errors Made in Determining Damping Factors for OBE and SSE Loading Conditions

  • From the 15.1 Log. All other numbers are from the 15.3 Log. )

Page 34 of 55

ASLB LOG ,

PHASE 4 JANUARY 24. 1986 SUBJECT ORIGIN DATE LOG NO. DESCRIPTION OBE/SSE Load.ing CASE 10 02 84 122.4 CASE's Answer to Applicants' Reply to CASE's Answer to Applicants' Motion Regarding Alleged Errors Made in Determining Damping Factors for DBE and SSE l l Loading Conditions Pipe Clamps NRC 11 24 82 9 Board Notification No.82-105 - Alleged Design Deficiency l Pipe Clamps TUGC0 11 04 83 11 Applicants' Brief Regarding Relevance of l Board Notification 82-105A and Affidavit of John C. Finneran, Jr. Regarding Analysis of Stiff Pipe Clamps Addressed in Board

Notification 82-105A Pipe Clamps CASE 11 04 83 12 CASE's Assessment of Applicability of Board Notification 82-105A to Comanche Peak Steam Electric Station Pipe Clamps NRC 11 04 83 14 NRC Brief on Board Notification 82-105A and Affidavit of W. Paul Chen on the SIT Report and Stiff Pipe Clamps and Affidavit of David Terao on Stiff Pipe Clamps Piping / Pipe Support Design
  • From the 15.1 Log. All other numbers are from the 15.3 Log.

Page 35 of 55

ASLS LOG PHASE 4 JANUARY 24, 1986 SUBJECT ORIGIN DATE LOG NO. DESCRIPTION -

Piping /Pi pe -

Support Design TUGC0 11 12 85 292 Affidavit of Rovert C. Iotti and John C.

Finneran, Jr. in Response to Board Request for Information on Variation of Field Configurations'of Supports Utilizing

.' Cinched-Down U-Bolts Piping / Pipe

Support Design
  • TUGC0 08 30 85 325 Letter to NRC Regarding CPSES Docket Nos.

50-445 and 50-446 Pipe Support Design Piping / Pipe Support Design NRC 06 11 84 184 Telephone Conference Transcript

Participants:

NRC, CASE, TUGCO, Ebasco l Piping / Pipe

Support Design ASLB 10 18 84 105 Memorandum and Order (More Detail on Individual Pipe Supports)

Piping / Pipe Support Design NRC 02 26 85 --- Transcript of Meeting between TUGC0 and NRC Regarding CPSES - Piping and Support Design

Participants:

TUGCO, NRC. TERA ETGC, Battelle Columbus, CASE, Teledyne, Cygna, Dallas area media

  • From the 15.1 Log. All other numbers are from the 15.3 Log.

Page 36 of 55

ASLB LOG PNASE 4 JANUARY 24,1986 SUBJECT ORIGIN DATE LOG NO. DESCRIPTION Piping / Pipe-Support Design NRC 02 26 85 135 Transcript of Meeting between TUGC0 and 147 the NRC Regarding Comanche Peak Steam Electric Station - Piping and Support Design

Participants:

NRC TUGCO. TERA, ETGC, Battelle Columbus, CASE, Teledyne, Cygna, Gibbs & Hill, Ebasco, RLCA, Bishop et al., Iarpell, Dallas area media Piping / Pipe Support Design NRC 02 27 85 148 Transcript of Meeting between TUGC0 and the 3' NRC Regarding Comanche Peak Steam Electric

': Station - Piping and Support Design

Participants:

NRC TUGCO, TERA, RLCA,

- Gibbs & Hill Ebasco, Bishop et al.,

Iarpell, Enerex, Cygna. ETGC, Battelle Columbus, CASE. Teledyne, Dallas area media l Piping / Pipe

! Support Design

  • NRC 03 11 85 165 Board Notification No.85-026 - Summary of Meeting between MRC and TUGC0 Concerning the Design of Piping and Pipe Supports at Comanche Peak

,' Piping / Pipe Support Design NRC 07 03 85 ---

Use of ASME Code Edition and Addenda for CPSES Units 1 and 2

  • From the 15.1 Log. All other numbers are from the 15.3 Log.

Page 37 of 55

ASLB LOG PHASE 4 JANUARY 24,1986 SUBJECT ORIGIN DATE LOG NO. DESCRIPTION

< Piping / Pipe.

Support Design

Piping / Pipe Supports

  • Bishop, et al. 11 04 85 438 Letter to ASLB Regarding (1) U-bolt Support

. Configurations Used in Applicants' Tests and (2) Corrections to Applicants' Affidavits Supporting the Motions for Sumary Disposition Regarding Piping and Support Design QA/QC CASE 00 00 00 102 CASE's Statement of Material Facts As to Which There Is No Genuine Issue Regarding

. CASE's First Motion for Summary Disposition Regarding Certain Aspects of the Implementation of Applicants' Design and QA/QC for Design QA/QC NRC 12 28 83 1 Memorandum and Order (Quality Assurance for 15 Design)

QA/QC TUGC0 02 03 84 19 Applicants' Plan to Respond to Memorandum and Order (Quality Assurance for Design)

QA/QC NRC 02 06 84 2 NRC Staff Response to CASE's Motion for Reconsideration of Board's 12/28/83 Memorandum and Order (Quality Assurance for Design)

  • From the 15.1 Log. All other numbers are from the 15.3 Log.

Page 38 of 55

ASLB LOG PHASE 4 JANUARY 24, 1986 SUBJECT ORIGIN DATE LOG N0. DESCRIPTION 1

QA/QC - NRC 02 23 84 22 Transcript of Hearing

Participants:

ASLB, TUGCO, NRC, CASE, State of Texas. Texas PUC QA/QC CASE 03 05 84 24 CASE's Answer to Applicants' Plan to Respond to Memorandum and Order (Quality Assurance for Design)

QA/QC NRC 03 09 84 26 NRC Staff Coments on Applicants' Plan to Respond to Memorandum and Order (Quality Assurance for Design)

QA/QC NRC 03 13 84 27 Supplement to Applicants' Plan to Respond to Memorandum and Order (Quality Assurance for Design)

QA/QC NRC 04 06 84 40 NRC Staff Comnents on Supplement to Applicants' Plan to Respond to Memorandum and Order (Quality Assurance for Design)

QA/QC CASE 04 12 84 47 CASE's Response to Applicants' Plan to Respond to Memorandum and Order (Quality Assurance for Design)

QA/QC TUGC0 07 03 84 81 Applicants' Motion for Sumary Disposition 117.1 Regarding A11egatons Concerning Quality Assurance Program for Design of Piping and Pipe Supports for Comanche Peak Steam Electric Station and Affidavit of D.N.

Chapman, J.C. Finneran, Jr.t D.E. Powers, R.P. Deubler, R.E. Ballard, Jr. and A.T.

Parker Regarding Quality Assurance Program for Design of Piping and Pipe Support for Comanche Peak Steam Electric Station

  • From the 15.1 Log. All other numbers are from the 15.3 Log.

Page 39 of 55

ASLB LOG PHASE 4

. JANUARY 24, 1986 SUBJECT ORIGIN DATE LOG N0. DESCRIPTION QA/QC* NRC 07 13 84 47 Special Review Team Report QA/QC CASE 10 01 84 101 CASE's First Motion for Summary Disposition Regarding Certain Aspects of the Implementation of Applicants' Design and QA/QC for Design in the form of Affidavit of CASE Witness Jack Doyle i: QA/QC CASE 10 06 84 103 CASE's Motion and Offer of Proof Regarding CASE's First Motion for Summary Disposition Regarding Certain Aspects of the Implementation of Applicants' Design and QA/QC for Design QA/QC CASE 10 18 84 117.3 CASE's Partial Answer to Applicants' Statement of Material Facts As to Which There Is No Genuine Issue Regarding Applicants' Quality Assurance Program for Design of Piping and Pipe Supports for Comanche Peak Steam Electric Station in the form of Affidavit of CASE Witness Jack Doyle and CASE's Motion for Additional Time and CASE's Second Partial Answer to Applicants' Statement of Material Facts As to Which There Is No Genuine Issue Regarding Applicants' Quality Assurance Program for Desigri of Piping and Pipe Supports for Comanche Peak Steam Electric Station in the form of Affidavit of CASE Witness Mark Walsh

  • From the 15.1 Log. All other numbers are from the 15.3 Log.

Page 40 of 55

ASL8 LOG PHASE 4 JANUARY 24,1986 SUBJECT ORIGIN DATE LOG NO. DESCRIPTION QA/QC NRC 01 15 85 183 Transcript of Meeting with TUGC0 Concerning the Motion for Summary Disposition on QA/QC Program for Design of Piping and Pipe Supports for Comanche Peak Partic'-  : NRC. TUGC0 QA/QC* NRC 03 04~ 85 168 Letters Regarding Panel to Prepare NRC Staff Position on Cesanche Peak Hearing Contention No. 5 - Working Charter QA/QC NRC 03 05 85 152 CPRT Efforts in Responding to the NRC Technical Review Team Findings (Board Notification No.85-029)

QA/QC MRC 03 06 85 117.2 Board Notification No.85-022 - Summary of Meeting between the NRC Contention 5 Panel and CASE and TUGC0 Concerning Comanche Peak Steam Electric Station QA/QC* NRC 03 08 85 163 Board Notification No.85-023 - Panel to Prepare NRC Staff Position on Comanche Peak Hearing Contention No. 5 - Working Charter QA/QC TUGC0 05 19 85 --- Supplementation of Applicant's Response to CASE's Request for Production (MAC Report)

  • 'From the 15.1 Log. All other numbers are from the 15.3 Log.

Page 41 of 55

ASLB LOG PHASE 4

. JANUARY 24. 1#86 SUBJECT ORIGIN DATE LOG NO. DESCRIPTION QA/QC -

CASE 08 15 85 236 CASE's Proposal Regarding Design / Design QA Issues in Response to Applicants' 6/28/85 Current Management Views and Management Plan for Resolution of All Issues QA/QC* NRC 08 27 85 354 Board Notification No. 85-081: Allegations Concerning Westinghouse Analyses and QA 4

QA/QC CASE 11 04 85 299 CASE's (Main Docket) Answer to Applicants 10/21/85 Petition for Directed Certification of Licensing Board Order of

' October 2, 1985 Richmond Inserts CASE 00 00 00 130.2 CASE's Answer to Applicants' Motion for ,

Summary Disposition Regarding Richmond Inserts and CASE's Answer to Applicants' Statement of Material Facts Relating to Richmond Inserts As to Which There Are No i Material Issues in the form of Affidavit of CASE Witnras Mark Walsh Richmond Inserts TUGC0 06 01 84 57 Affidavit of John C. Finneran, Jr., Robert C. Iotti and R. Peter Deubler Regarding Design of Richmond Inserts and Their Application to Support Design and Attachments

  • From the 15.1 Log. All other numbers are from the 15.3 Log.

Page 42 of 55

- -- _- - - - - - _ - - - . _ _ - - - - - _ _ _ . - _ _ . _ _ _ - _ - - - - a

ASLB LOG PHASE 4 JANUARY 24, 1986 SUBJECT ORIGIN DATE LOG 18. DESCRIPTION I

4 Richmond Inserts TUGC0 06 02 84 57 Applicants' Statement of Material Facts Relating to Richmond Inserts As to Which There Are No Material Issues Richmond Inserts TUGC0 06 02 84 130.1 Applicants' Motion for Summary Dispositon 57 Regarding the Design of Richmond Inserts and Their Application to Support Design and *

'! Affidavit of John C. Finneran, Jr., Robert

, C. Iotti, and R. Peter Deubler Regarding Design of Richmond Inserts and Their l;, Application to Support Design

'12 14 85 4

Richmond Inserts CASE 341 CASE's Response to Applicants' 11/12/85

! Changes to Affidavits in Support of Applicants' Motions for Summary Disposition and Affidavit of CASE Witness Jack Doyle (pp 53-54)

Safety Factors TUGC0 05 20 84 77 Applicants' Motion for Summary Disposition 119.1 of CASE's Allegations Regarding Safety Factors and Affidavit of J.C. Finneran, Jr., R.C. Iotti and R.D. Wheaton Regarding Safety Factors Safety Factors CASE 08_ 24 84 119.2 CASE's Partial Answer to Applicants' Statement of Material Facts As to Which There Is No Genuine Issue Regarding Safety Factors in the form of Affidavit of CASE Witnesses Mark Walsh and Jack Doyle

  • From the 15.1 Log. 'All other numbers are from the 15.3 Log.

Page 43 of 55

ASLB LOG PHASE 4 JANUARY 24. 1986

SUBJECT ORIGIN DATE LOG NO. DESCRIPTION Safety Factors TUGC0 11 01 84 119.3 Applicants' Reply to CASE's Partial Answer to Applicants' Motion for Sumary Disposition Regarding Safety Factors Section Property -

Values TUGC0 05 18 84 57 Applicants' Motion for Sumary Disposition 128.1 of CASE Allegation Regarding Section Property _ Values Section Property values TUGC0 05 18 84 -- Applicants' Motion for Sumary Disposition of CASE Allegation Regarding Section Property Values and Affidavit of J.C.

Finneran and R.C. Iotti Regarding CASE's Allegation Involving Section Property Values Section Property Values CASE 08 12 84 128.2 CASE's Answer to Applicants' Motion for Summary Disposition Regarding CASE i

Allegations Regarding Section Property .

Values s

, Section Property i values TUGC0 11 09 84 128.3 Applicants' Reply to CASE's Answer to Applicants' Motion for Sumary Dispositon

! Regarding Section Property Values and Affidavit of John C. Finneran, Jr.

i Regarding Information Related to Section

. Property Values

  • From the 15.1 Log. All other numbers are from the 15.3 Log.

Page 44 of 55 i

ASLB LOG PHASE 4 JANUARY 24. 1986 SUBJECT ORIGIN DATE LOG NO. DESCRIPTION Seismic -

Interactions

  • TUGC0 10 01 85 379 Letter to NRC Regarding Mon-Seismic to Seismic Interactions QA File: CP-85-33, SDAR 1.95 Stability TUGC0 00 00 00 67 Applicants' Statement of Faterial Facts As to Which There Is No Genuine Issue Regarding Stability of Fipe Supports Stability TUG 00 06 17 84 68 Affidavit of John C. Finneran, Jr.

Regarding Stability of Pipe Supports and Piping Systems Stability TUGC0 06 17 84 66 Applicants' Motion for Summary Disposition Regarding Stability of Pipe Supports Stability TUGC0 06 17 84 129.1 Applicants' Motion for Summary Disposition Regarding Stability of Pipe Supports and Affidavit of John C. Finneran, Jr.

Regarding Stability of Pipe Supports and Piping Systems Stability CASE 10 15 84 129.2 CASE's Motions and Answer to Applicants' Motion for Summary Disposition Regarding Stability of Pipe Supports and CASE's Answer to Applicants' Statement of Material Facts As to Which There Is No Genuine Issue Regarding Stability of Pipe Supports in the form of Affidavit of CASE Witnesses Mark Walsh and Jack Doyle

  • From the 15.1 Log. All other numbers are from the 15.3 Log.

Page 45 of 55

~

ASL8 LOG PHASE 4 JANUARY 24, 1986 SUBJECT ORIGIN DATE LOG NO. DESCRIPTION Stability CASE 12 14 85 341 CASE's Response to Applicants' 11/12/85 Changes to Affidavits in Support of Applicants' Motions for Sumary Disposition and Affidavit o~f CASE Witness Jack Doyle (pp. 15-18)

TRT* NRC 09 18 84 85 Request for Additional Information Regarding Electrical /I&C, Civil / Structural, Testing and Letter Regarding TRT and Request for Additional Infomation TRT* NRC 09 21 84 93 Board Notification No.84-160 - Summary of Meeting Between NRC Technical Review Team and TUGC0 Transcript of Meeting between NRC and TUGC0 on 09/18/84 TRT* GAP 09 26 84 92 TRT & QA/QC Questions / Comments TRT* NRC 10 26 84 120 Board Noti fication No.84-174 - Summary of Meeting between NRC Technical Review Team and TUGC0 and Transcript of Meeting on 10/19/84

Participants:

NRC. TUGCO TERA. Dallas Times Herald TRT* NRC 11 02 84 121 Board Notification No.84-175 - Summary of Meeting between NRC Technical Review Team and TUGC0 and Transcript of Meeting on 10/23/84

Participants:

NRC, TUGCO, GAP, CASE, Dallas media

  • From the 15.1 Log. All other numbers are from the 15.3 tog.

Page 46 of 55

ASLB LOG PHASE 4

' JANUARY 24,1986 SUBJECT ORIGIN DATE LOG NO. DESCRIPTION TRT* NRC 12 10 84 136 Request for Additional Information:

Coatings, Mechanical, Miscellaneous TRT* NRC 01 08 85 153 QA/QC Review Results TRT* GAP 01 08 85 151 TRT & QA/QC Questions / Comments TRT NRC 06 28 85 --- Third Supplement to NRC Staff Response to CASE's Request for Admissions

TRT* Bishop, et al 07 17 85 274 ' Cross-Referenced Chart Between Unresolved Issues and Applicants' Response TRT Electrical Issues
  • NRC 03 11 84 166 Board Notification No.85-027 - Summary of Meeting between NRC and TUGC0 Concerning Status of the CPRT Efforts in Responding to i

the NRC Technical Review Team Findings in the Electrical / Instrumentation Area TRT Electrical Issues NR 02 28 85 137 Meeting between TUGC0 and the NRC Regarding Co.nanche Peak Steam Electric Station -

Applicants' Program Plan - TRT Electrical Issues

Participants:

NRC, TUGCO, SRT, Gibbs &

Hill, W. Stroupe & Associates. ENERGEX, CASE. TPOL, TERA, Dallas Mornir.g News

  • From the 15.1 Log. All other numbers are from the 15.3 Log.

Page 47 of 55

ASL8 LOG PNASE 4 JANUARY 24, 1986

$UBJECT ORIGIN DATE LOG NO. DESCRIPTION l

l TRT Response Team

  • NRC 03 19 85 179 Board Notification No.85-029 - Summary of Meeting between MRC and TUGC0 Concerning
l. Status of CPRT Efforts in Responding to the ll NRC Technical Review Team Findings U-Bolts Westinghouse 05 17 84- 87 Comanche Peak Steam Electric Station U-Bolt Support / Pipe Test Report i

U-Bol ts CASE 05 23 84 57 Applicants' Motion for Summary Disposition of CASE's Allegations Regarding U-Bolts Acting as Two-Way Restraints and i Attachments

U-Bolts TUGC0 05 23 84 131.1 Applicants' Motion for Summary Disposition of CASE's Allegations Regarding U-Bolts

. Acting as Two-Way Restraints and Affidavit of R.C. Iotti and J.C. Finneran, Jr.

Regarding U-Bolts Used as One-Way Restraints Acting as Two-Way Restraints U-Bol ts TUGC0 06 29 84 87 Applicants' Motion for Summary Disposition 132.1 of CASE's Allegations Regarding Cinching Down of U-Bolts and Applicants' Statement of Material Facts As To Which There Is No Genuine Issue Regarding Consideration of Cinching U-Bolts and Affidavit of Robert C.

Iotti and John C. Finneran. Jr. Regarding Cinching Down of U-Bolts i

i

  • From the 15.1 Log. All other numbers are from the 15.3 Log.

Page 48 of 55

ASLS LOG PHASE 4 JANUARY 24, 1986 SUSJECT ORIGIN DATE LOG NO. DESCRIPTION U-Bolts -

CASE 08 19 84 131.2 CASE's Answer to Applicants' Motion for Summary Disposition of CASE's Allegations Regarding U-Bolts Acting as Two-Way

Restraints in the form of Affidavit of CASE
Witness Mark Walsh U-Bolts Ebasco 09 13 84 97 Transcript of Discussion between Cygna.

Energy Services and TUGC0 and Ebasco Services, Inc.

Participants:

TUGC0, Ebasco, Cygna, CASE CASE's Answer to Applicants' Statement of U-Bol ts CASE 10 01 84 104 Material Facts As to Which There Is No Genuine Issue Regarding Consideration of Cinching Down of U-Bolts in the form of Affidavit of CASE Witness Jack Doyle U-Bolts CASE 10 08 84 132.2 CASE's Answer to Applicants' Motion for Summary Disposition Regarding Consideration of Cinching Down of U-Bolts in the form of Af fidavit of CASE Witness Jack Doyle U-Bol ts* NRC 05 08 85 212 Bosrd Notification No.85-053 - Summary of Meeting Between NRC Staff and Texas Utilities on Comanche Peak Concerning Applicants' U-Bolt Torque Sample on Unit 2

  • From the 15.1 Log. All other numbers are from the 15.3 Log.

Page 49 of 55

i ASLB LOG PHASE 4 JANUARY 24. 1986 SUBJECT ORIGIN DATE LOG NO. DESCRIPTION 0-Bolts * . NRC 08 20 85 317 Board Notification No. 85-077- Staff's Determination of Applicants' Potential Material False Statement on U-Bolt Sample l U-Bolts

  • CASE 08 26 .85' 319 Letter to ASLB Regarding NRC Staff's Determination of Applicants' Potential
Material False Statement on U-Bolt Sample (Board Notification No.85-077)

U-Bol ts* CASE 08 26 85 321 Latter to ASLB Regarding NRC Staff's 8/20/85 Board Notification No.85-077 Determination of Applicants' Potential Material False Statement on U-Bolt Sample U-Bolts

  • NRC 08 26 85 321 NRC Staff's 8/20/80 Board Notification No.85-077 - Staff Determination of Applicants' Potential Material False Statement on U-Bolt Sample U-Bol ts* Bishop, et al. 11 04 85 438 Letter to ASLB Regarding (1) U-bolt Support Configurations Used in Applicants' Tests -

and (2) Corrections to Applicants' Affidavits Supporting the Motions for i Summary Disposition Regarding Piping and Support Design U-Bolts TUGC0 11 12 85 292 Affidavit of Rovert C. Iotti and John C.

Finneran, Jr. in Response to Board Request l fcr Information on Variation of Field Configurations of Supports Utilizing

~

Cinched-Down U-Bolts 1

  • From the 15.1 Log. All other numbers are from the 15.3 Log.

Page 50 of 55

. - _ . . -. _= . _ .

~ASL8 LOG PHASE 4 JANUARY 24. 1986 SUBJECT ORIGIN DATE LOG NO. DESCRIPTION U-Bol ts -

CASE 12 14- 85 341 CASE's Response to Applicants' 11/12/85 i Changes to Affidavits in Support of .

Applicants' Motions for Summary Disposition and Affidavit of CASE Witness Jack Doyle .,

, (pp 18-25) '

Upper Lateral Restraint TUGC0 00 00 00 84 Applicants' Statement of Material Facts As To Which There Is No Genuine Issue Regarding the Upper Lateral Restraint Beam Upper Lateral Restraint TUGC0/Ebasco 05 20 F4 85 Affidavit of Robert C. Iotti Regarding Upper Lateral Restraint Bean Upper Lateral Restraint TUGC0 05 20 84 123.1 Applicants Motion for Summary Disposition 83 Regarding Upper Lateral Restraint Beam and Affidavit of Robert C. Iotti Regarding Upper Lateral Restraint Beam i Upper Lateral Restraint CASE 08 27 84 123.2 CASE's Partial Answer to Applicants' Statement of Material Facts As to Which There Is No Genuine Issue Regarding the i

Upper Lateral Restraint Beam in the form of i Affidavit of CASE Witnesses Jack Doyle and l Mark Walsh

  • From the 15.1 Log. All other numbers are from the 15.3 Log.

Page 51 of 55 l

a

ASLB LOG PHASE 4 JANUARY 24 0 1986 SUBJECT ORIGIN DATE LOG NO. DESCRIPTION 4

Upper Lateral Restraint TUGC0 10 26 84 123.4 Applicants' Reply to CASE's Answer to Applicants' Motion for Summary Disposition Regarding the Upper Lateral Restraint Beam and Affidavit of Robert C. Iotti in Support of Applicants' Reply to CASE's Answer to Applicants' Motion for Summary Disposition Regarding the Upper Lateral Restraint Beam Upper Lateral Restraint CASE 11 05 84 123.3 CASE's Answer to Applicants' Reply to i CASE's Answer to Applicants' Motion for Summary Disposition Regarding the Upper Lateral Restraint Beam and Affidavit of

  • CASE Witness Jack Doyle Upper Lateral Restraint NRC 11 13 84 181 Prehearing Briefing Transcript

Participants:

TUGCO, NRC, BNL, Ebasco, Gibbs & Hill Upper Lateral Restraint NRC 12 05 84 182 Transcript of Meeting on the Texas Utilities Motion for Sommary Disposition on the Upper Lateral Restraint

Participants:

NRC, BNL, TUGC0

  • From the 15.1 Log. All other numbers are from the 15.3 Log.

Page 52 of 55

ASLB LOG PHASE 4 JANUARY 24,1986 StBJECT ORIGIN DATE LOG IW. DESCRIPTION -

Upper Lateral Res traint* TUGC0 08 09 85 298 CPSES Upper Lateral Restraint Embedment Design QA File: CP-85-26 SDAR-187 Upper Lateral Restraint CASE 12 14 85 341 CASE's Response to Applicants' 11/12/85 Changes to Affidavits in Support of Applicants' Motions for Summary Disposition and Affidavit of CASE Witness Jack Doyle (pp. 40-50)

Valves NRC 10 17 85 264 Summary of 9/17/85 Meeting - NRC/TUGC0 Discussion of the Potential Deviation from

- FSAR Commitment on Stress Allowables for Active Valves

! Val ves*. TUGC0 12 05 85 469 CPSES Docket Nos 50-445 and 50-446 Request for Additional Information Walsh/Doyle Allegations CASE 08 22 83 177 CASE's Proposed Findings of Fact and Corclusions of Law (Walsh/Doyle Allegations)

Walsh/Doyle Allegations CASE 02 07 84 3 Testimony of CASE Witness Mark A. Walsh

  • From the 15.1 Log. All other numbers are from the 15.3 Log.

Page 53 of 55 6

ASLB LOG

, PHASE 4 JANUARY 24. 1986 SUBJECT ORIGIN MTE LOG NO. DESCRIPTION Walsh/Doyle -

Allegations CASE 02 07 84 4 Testimony of CASE Witness Jack Doyle Walsh/Doyle Orrick,

, Allegations

  • et al. 12 07 84 116 Letter to William Horin Regarding Walsh/Doyle Allegations
Welding Issues TUGC0 03 19 85 140 Applicants' Reply to CASE's Motion to Stay Ruling Regarding CASE's Motion for Reconsideration of Licensing Board's Memorandum (Concerning Welding Issues)

Welding Issues TUGC0 04 01 85 154 Applicants' Objection to CASE's .

4 supplementation of Its Motion for Reconsideration of Licensing Board's Memorandum (Concerning Welding Issues)

Welding Issues

  • TUGC0 06 24 85 258 Letter Regarding Docket Nos. 50-445 and 50446/ Visual Weld Acceptance Criteria Welding Issues
  • NRC 07 25 85 279 Letter Regarding Visual Weld Acceptance Criteria for Structural Welding at Nuclear Power Plants (VWAC)

Welding Issues CASE 08 15 85 237 CASE's 0/15/85 Supplement to CASE's 1/7/85 Motion for Reconsideration of Boards 12/18/84 Memorandum (Concerning Welding Issues)

  • From the 15.1 Log. All other numbers are from the 15.3 Log.

Page 54 of 55

ASLB LOG PHASE 4 JANUARY 24, 1986 SUBJECT ORIGIN DATE- LOG NO. DESCPIPTION Welding Issues

  • TUGC0 10 03 05 421 Letter to NRC Regarding Visual Weld Inspection ,

1

  • From the 15.1 Log. All other numbers are from the 15.3 Log.

3 Page 55 of 55

.__ _ _ _ _ _ - _ _ - _ _ _ _ _ _ -