Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- W3P85-2520, Verifies That All Requirements of Condition 16 of License NPF-38 Satisfied Prior to Completion of Phase III of Startup Test Program.Measures Implemented to Support Closure of Each Subsection of License Condition Listed + (Verifies That All Requirements of Condition 16 of License NPF-38 Satisfied Prior to Completion of Phase III of Startup Test Program.Measures Implemented to Support Closure of Each Subsection of License Condition Listed)
- ML20097B901 + (Verifies That All safety-related Active Pumps & Valves Qualified W/Respect to Operability,For Closeout of SER Open Issue 6)
- ML19276H382 + (Verifies That Axial Xenon Oscillation Test Should Be Specific OL Requirement If Concerned Parties Agree)
- L-97-287, Verifies That Containment Structural Integrity & Containment Leakage Rates Are Acceptable by TS SRs 4.6.1.6 & 4.6.1.2, Respectively.Next Periodic ILRT Is Due Before May 2003. Basis of Util Decision Encl,For Info + (Verifies That Containment Structural Integrity & Containment Leakage Rates Are Acceptable by TS SRs 4.6.1.6 & 4.6.1.2, Respectively.Next Periodic ILRT Is Due Before May 2003. Basis of Util Decision Encl,For Info)
- FVY-82-101, Verifies That Design Criteria for NUREG-0737,Item II.K.3.22, Automatic Switchover of Reactor Core Isolation Cooling Sys Suction, Has Been Satisfied + (Verifies That Design Criteria for NUREG-0737,Item II.K.3.22, Automatic Switchover of Reactor Core Isolation Cooling Sys Suction, Has Been Satisfied)
- W3P84-3360, Verifies That Design,Const & Testing Essentially Completed. Unit Ready to Load Fuel.List of Items That Will Be Completed During Low Power Testing & Prior to Exceeding 5% Power Encl + (Verifies That Design,Const & Testing Essentially Completed. Unit Ready to Load Fuel.List of Items That Will Be Completed During Low Power Testing & Prior to Exceeding 5% Power Encl)
- W3P84-1136, Verifies That Design,Const & Testing of Facility Completed Per FSAR & Unit Will Be Ready to Load Fuel by 840530. Activities Which May Not Be Finished by 840530 & Anticipated License Conditions Encl.Granting OL Requested + (Verifies That Design,Const & Testing of Facility Completed Per FSAR & Unit Will Be Ready to Load Fuel by 840530. Activities Which May Not Be Finished by 840530 & Anticipated License Conditions Encl.Granting OL Requested)
- ML13331B160 + (Verifies That ISA Std S67.04, Setpoint for Nuclear Safety Related Instrumentation Used In... Used to Establish Flow Switch Setpoints for Interlocks Between Auxiliary Feedwater Sys Trains a & B,Per Amend Application 156)
- ML18058B082 + (Verifies That Listed Mods Re SG Replacement Project for Main Steam & Pipe Support Analysis Concerns,Delineated in Insp Repts 50-255/90-25 & 50-255/91-202,completed)
- ML19323C885 + (Verifies That No Loss of Offsite Power Events Have Been Experienced,In Response to NRC)
- ML20042A615 + (Verifies That Piping Considered Engine Mounted Is on Single Skid & Is Seismically Qualified)
- ML20054G641 + (Verifies That Planned Actions Discussed W/Nrc on 820427 Remain Unchanged Re Alert & Notification Sys Deficiencies)
- PY-CEI-NRR-1866, Verifies That Requested Actions of NRC Bulletin 93-002,Suppl 1, Debris Plugging of Emergency Core Cooling Suction Strainers Completed + (Verifies That Requested Actions of NRC Bulletin 93-002,Suppl 1, Debris Plugging of Emergency Core Cooling Suction Strainers Completed)
- ML20138F777 + (Verifies That S&W Has Performed Independent Design Verification of Doses to Control Room Operators Resulting from Direct Intake Through Air Inlet VA-65,per NUREG-0737, Item III.D.3.4 Re Control Room Habitability)
- ML20236D358 + (Verifies That SA Mcneil,As NRR Project Manager,Continues to Require Unescorted Access to Plant.Encl Personal Identifying Info Effective Immediately Upon Issuance & Shall Expire 1 Yr from Ltr Date.W/O Encl)
- ML19339C073 + (Verifies That Seal Ring Has Been Removed from Cavity Annulus Area & Is Not Potential Missile Hazard.Concludes That Safety Issue Has Been Satisfactorily Resolved)
- ML20056D055 + (Verifies That Section 106 Compliance Process for Proposed U Enrichment Facility,Homer Vinicity,Claiborne Parish,La Completed to State of La Satisfaction)
- ML20086E529 + (Verifies That Valves (HV-2301 Through HV-2310) Important to Safety Meet Min Wall Thickness Requirements of All Applicable Codes & Stds.W/O Encl Tabulation)
- ML20077P198 + (Verifies Two Items Re Topic 3 on Max Critical Power Ratio Operating Limit W/O EOC-RPT Tech Spec,Per Util 830823 Submittal,In Response to NRC 830831 Request.Analysis Inputs Utilized in FSAR Chapter 15 Transient Analyses)
- ML20066E376 + (Verifies Util Commitment to NRC of Prior to Commercial Operation Per NUREG-0519,Section 6.2.1.1.Util Determining Whether Unit 1 Is in Commercial Svc for Accounting Purposes Due to Demonstrated Power Generation)
- ML20023D087 + (Verifies at Howard Receipt of Four Cassette Tapes of 820730 Discussions Between NRC & at Howard,Sl Marello & T Devine at Region III Ofc in Glen Ellyn,Il)
- 05000416/FIN-2007008-02 + (Verify Continued Operability of RHR Heat Exchanger B Due to Fouling)
- Information Notice 2014-05, Verifying Appropriate Dosimetry Evaluation + (Verifying Appropriate Dosimetry Evaluation)
- ML19323E742 + (Verifying Seismic Design of Nuclear Reactors by Testing)
- ML012340413 + (Verment Yankee, Implementing Procedures to the E-Plan, Change Number 194)
- ML25197A696 + (Vermont (1st) Part 37-71-73)
- ML25197A697 + (Vermont (2nd) Part 37-71-73)
- ML25196A231 + (Vermont (2nd) Part 37-71-73)
- ML050140200 + (Vermont - Issuance of Amendment Missed Surveillances and Associated Changes)
- BVY 13-021, Vermont - Required Response 2 for NTTF Recommendation 2.1: Flooding - Hazard Reevaluation Report + (Vermont - Required Response 2 for NTTF Recommendation 2.1: Flooding - Hazard Reevaluation Report)
- BVY 05-110, Vermont - Supplement to the Annual Radiological Environmental Operating Report for Year 2004 + (Vermont - Supplement to the Annual Radiological Environmental Operating Report for Year 2004)
- ML19169A174 + (Vermont Agreement FRN Week Four)
- ML19169A175 + (Vermont Agreement FRN Week One)
- ML19169A176 + (Vermont Agreement FRN Week Three)
- ML19169A177 + (Vermont Agreement FRN Week Two)
- ML19169A173 + (Vermont Agreement FRN for Public Comment)
- ML18171A236 + (Vermont Attorney General Office Comment Response Letter)
- ML053070344 + (Vermont Department of Public Service Answer to NRC Staff Response to the Atomic Safety and Licensing Boards Order of September 30, 2005, Regarding Vermont Department of Public Services First Motion to Compel)
- ML081990435 + (Vermont Department of Public Service Attendance During Hearings and Nondisclosure Agreement)
- ML14267A525 + (Vermont Department of Public Service Certificate of Service)
- ML050680306 + (Vermont Department of Public Service Disclosure of 3/2/05 Pursuant to 10 C.F.R. § 2.336)
- ML071300483 + (Vermont Department of Public Service Disclosure of 5/3/07 Pursuant to 10 C.F.R. § 2.336)
- ML050970327 + (Vermont Department of Public Service Disclosure of 4/1/05 Pursuant to 10 C.F.R. § 2.336)
- ML063170200 + (Vermont Department of Public Service Initial Discovery Disclosures Pursuant to 10 C.F.R. § 2.336)
- ML052790047 + (Vermont Department of Public Service Motion for Leave to File a Reply Brief in Support of Its Motion to Compel)
- ML052790041 + (Vermont Department of Public Service Motion to Compel Production of Certain NRC Staff Documents (II))
- ML053430095 + (Vermont Department of Public Service Motion to Compel Production of Certain NRC Staff Documents (III))
- ML081890188 + (Vermont Department of Public Service Motion for Modification of the Scheduling Order to Facilitate Full Compliance with 10 CFR Section 2.323(b))
- ML052500437 + (Vermont Department of Public Service Motion to Compel Production of Certain NRC Staff Documents)
- ML061770040 + (Vermont Department of Public Service Motion for Extension of Time and Alternative Dates for Oral Argument and Joint Motion with NEC for Extension of Time for the NRC Staff and NEC Filling Dates on the NEC Petition to Intervene)
- NRC-2014-0169, Vermont Department of Public Service Notice of Intention to Participate, Petition to Intervene, and Hearing Request + (Vermont Department of Public Service Notice of Intention to Participate, Petition to Intervene, and Hearing Request)
- ML061640035 + (Vermont Department of Public Service Notice of Intention to Participate and Petition to Intervene)