Omaha Public Power District 1623 Harney Omaha. Nebraska 68102-2247 402/536-4000 December 9, 1985 LIC-85-552 Mr. Ashok C. Thadani, Project Director PWR Project Directorate #8 Division of PWR Licensing - B Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Dear Mr. Thadani:
NUREG-0737, Item III.D.3.4 Control Room Habitability Pursuant to a telephone conversation of December 4, 1985, between Mr. E.
Tourigny and Mr. H. Gilpin of your staff and OPPD personnel, final resolution of the subject item was discussed.
This letter serves to verify that Stone and Webster (S & W) has perfonned an independent design verification of the doses to the control room operators resulting from direct intake through VA-65 air inlet. This verification utilized S & W's DRAGON computer code and, as described in OPPD's submittal of i
September 23, 1985, utilized the Campe and Murphy methodology, R.G.
1.111 and R.G. 1.109. S & W's calculations resulted in doses less than l
the doses in SRP Section 6.4.
This information should serve to close this issue and allow your staff to issue their SER prior to the restart of Fort Calhoun Station from the current refueling and maintenance outage.
If you should have further questions, do not hesitate to contact us.
Sincerely, n
'gk'm p i
8512160168 851209 PDR ADOCK 05000285 R. L. Andrews PDR F
Division Manager Nuclear Production RLA/DJM/me cc: LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Ave., N.W.
Washington, D.C. 20036 E. G. Tourigny, NRC Project Manager P. H. Harrell, NRC Senior Resiaent Inspector H. Gilpin, NRC b0