. RA s 475-/14 RER
$PLM UNITED STATES OF AMERICA I
NUCLEAR REGULATORY COMMISSION 0
BEFORE THE ATOMIC SAFETY AND LICENSING BOARD DOCKETED USNRC Aarch 7, 2005 (1:08pm)
FFICE OF SECRETARY RULEMAKINGS AND ADJUDICATIONS STAFF In the Mlatter of
)
ENTERGY NUCLEAR VERMONT
)
YANKEE LLC AND ENTERGY NUCLEAR
)
OPERATIONS, INC.
)
(Vermont Yankee Nuclear Power Station)
)
Docket No. 50-271 ASLBP No. 04-832-02-OLA March 2, 2005 VERMONT DEPARTMENT OF PUBLIC SERVICE DISCLOSURE OF 3/2/05 PURSUANT TO 10 C.F.R. § 2.336 Pursuant to 10 C.F.R. § 2.336(a) and (d), the Vermont Department of Public Service
("DPS" or "Department"),. hereby makes the following continuing disclosures.
Documents provided on the enclosed CD 207.
Pump Handbook, Karassik, et. al., Third Edition, 2001, pp. 2.346-2.357.
208.
American Institute of Chemical Engineers Equipment Testing Procedure, Cenlrlifugal Punips (Newltonian Liquiids): A Guide to Peiformnance Evaluation, Third Edition, 2002, pp. 11-16, 44-46.
209.
T. Henshav, Howt MutchA PSHDoes You-r Pumlp Really Requiire?, Pump & Systems Magazine, September 2001, pp. 42-43.
210.
Clhecking hI (Responses to Hoiw Mutch NPSH Does )'our Pumip Really Require?), Pump
& Systems Magazine, January 2002, pp. 8-11.
211.
PurmnpLines, ITT Industries, Fall 2001.
212.
PimnpLines, ITT Industries, Fall 1999.
213.
Pages from Hydraulic Institute Web Site (wlvrv1umps.org) - 1) Nuclear Powver/Cooling Tower, 2) Learning about Pump NPSH Margin, 3) Learn about Cavitation Damage 7ieln P/ote = s-c 9.- 035 5-C a_ o
Factors, 4) Learn about NPSH Margin Ratio Recommendations, printed 2/28/05.
214.
Technical Assistance Related to ISA Issue No. 5, Reliance on Coontaininent Oveipressure for Ensuring Appropriate NPSH, Final Technical Evaluation Report, April 29, 1998.
Documents provided in hard cop' with this Disclosure 215.
NEI Letter of May 28, 2004 Re PWR Containment Sump Evaluation Methodology.
216.
TIe NUREG/CR-6224 Head Loss Correlation, Graham Wallis 9/03/2004.
217.
Flowil Through a Conmpressible Porous Afat: Analysis of the Data Presented in Series 6 Tests Reported by LANL in LA-UR-04-1227, Graham Wallis 9/3/2004.
218.
The ANSI/ANS Standard 58.2-1988: Two-Phase Jet Model, Graham Wallis 8/31/2004.
219.
Prelinmnai)y Reviews of Head Loss Prediction Across Sumnp Screens, Sanjoy Bannerjee.
220.
Comnmients on GSI-191 Modelsfor Debris Generation, V.H. Ransom 9/14/2004.
221.
Safety Evalutationfor NEDO-326896, Rev. 0, "Utility Resolution Guidance Documnent for ECCS Suction Strainer Blockage," 8/20/1998.
222.
NUREG/CR-6398, SEA 95-554-06-A:9, Experiniental Investigation of Sedintentation of LOCA-Generated Fibrous Debris and Sludge in BWUR Suppression Pools, Prepared by F.J. Souto, D.V.Rao of Science and Engineering Associates, Inc.
223.
NUREG/CR-6367, SEA 95-554-06-A:8, Experinmental Study of Head Loss and Filtration for LOCA Debris, Prepared by D.V. Rao, F.J. Souto of Science and Engineering Associates, Inc.
224.
LA-UR-03-6415, Los Alamos National Laboratory, Smnall-Scale Experimlents: Effects of Chenmical Reactions on Debris-Bed Head Loss.
225.
NRC Regulatory Information Conference, Power Uprates Panel: State Perspective, March 8, 2005, Slides of Bill Sherman - VT Department of Public Service.
Respectfully submitted, Sarah Hof np Director for blic Advocacy Vermont Department of Public Service
- UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of
)
)
Docket No. 50-271 ENTERGY NUCLEAR VERMONT
)
YANKEE LLC AND ENTERGY NUCLEAR
)
ASLBP No. 04-832-02-OLA OPERATIONS, INC.
)
(Vermont Yankee Nuclear Power Station)'
)
CERTIFICATE OF DISCLOSURE
- 1.
My name is William K. Sherman. I am employed by the Vernont Public Service Department ("Department") in the position of State Nuclear Engineer. I have held this position since November, 1988. My duties include ongoing State regulatory oversight of the Vermont Yankee Nuclear Power Station ("Vermont Yankee"), as well as advising the Department and other State agencies on issues related to Venrnont Yankee and nuclear power.
- 2.
To the best of my knowledge, information and belief, the Department's Discovery Disclosures, dated March 2, 2005, transmit all materials required to be disclosed pursuant to 10 C.F.R. § 2.336 that were identified as relevant to the admitted contentions through a search of the infonnation and documentation under the Department's possession, control and custody as of the date of this certification.
'William K. Sherman State Nuclear Engineer Subscribed and sworn to before me this 2nd day of March, 2005.
Susan Pittsley Notary Public My commission expires February 10, 2007
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of ENTERGY NUCLEAR VERMONT YANKEE LLC AND ENTERGY NUCLEAR OPERATIONS, INC.
(Vermont Yankee Nuclear Power Station)
.)
Docket No. 50-271
)
ASLBP No. 04-832-02-OLA
)
CERTIFICATE OF SERVICE I hereby certify that copies of the Vermont Department of Public Service Disclosure of 3/2/05 Pursuant to 10 C.F.R. § 2.336 and Certificate of Disclosure in the above captioned proceeding has been served on the following by deposit in the United States Mail, first class, postage prepaid, and where indicated by asterisk by electronic mail (of the material in the Department's possession in electronic format), this, 2nd day of March, 2005. Hard copies of the enclosures and the electronic disk (with the same material that people receive by electronic mail) are only being sent to the Parties: Counsel for Entergy and Counsel for NRC Staff, with a courtesy copy to Counsel for NEC.
Alex S. Karlin, Chair*
Administrative Judge Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: ask2tnrc.eov Lester S. Rubenstein*
Administrative Judge Atomic Safety and Licensing Board Panel 4270 E. Country Villa Drive Tuscon, AZ 85718 E-mail: lesrrraicomcast.net Dr. Anthony J. Baratta*
Administrative Judge Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: aib50mnrc.uov Office of the Secretary*
ATTN: Rulemaking & Adjudications Staff Mail Stop: 0-16 Cl U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: HEARINGDOCKETrcinrc.gov Atomic Safety and Licensing Board Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001
- Office of Commission Appellate Adj.
Mail Stop 0-16 Cl U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001
Jay E. Silberg, Esq.*
Matias Travieso-Diaz, Esq.*
Douglas J. Rosinski, Esq.
Shaw Pittman, LLP 2300 N St., NW Washington, DC 20037-1128 jav.silber£?Shbawpittman.com matias.travieso-diazi)shaw"pittman.com Brooke Poole, Esq.*
Robert Weisman, Esq."
Marissa Higgins, Esq.*
Office of the General COuLInSel Mail Stop 0-15 D21 U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 bdp(jnrc.jov nfnwl)nrc.uov Mch56Dnrc.uov Anthony Z. Roisman, Esq.*
National Legal Scholars Law Firm 84 East Thetford Rd.
Lyme, NH 03768 aroisman(ivallev.iet Jonathan M. Block, Esq.*
94 Main Street P.O. Box 566 Putney, VT 05346-0566 jonb(nasover.nct Raymond Shadis*
New England Coalition P.O. Box 98 Shadis Road Edgecomb, ME 04566 shadis~prexar.com John M. Fulton, Esq.*
Assistant General Counsel Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 ifultol (awentergv.com Chris Wachter*
Atomic Safety and Licensing Board Panel Mail Stop T-3F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 CmaV(wnrc.zov Jonathan Rund*
Atomic Safety and Licensing Board Panel Mail Stop T-3F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Jmr3Qnrc.aov Respectfully submitted, DirtSarah Hofil c
Director for ulic Advocacy