Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Third Interval Snubber Program, Revision 1". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20054H900  + (Third Interim Significant Const Deficiency Rept 37 Re Resistance Temp Detectors Failure.Requests Extension Date for Submittal of Final Rept Until 820806 Due to Mfg Shipping Delays)
  • ML20073S376  + (Third Interim Significant Const Deficiency Rept 53 Re Possible Failure of GE Type Hfa Relays.Submittal of Final Rept Delayed Until 830615 Due to Plant Testing)
  • ML20084H745  + (Third Interim Significant Const Deficiency Rept 102 Re Failure to Install Dowels & Shear Blocks.Initially Reported on 840405.Corrective Action Completed.Final Rept Will Be Submitted on 840511)
  • ML20084B357  + (Third Interim Significant Const Deficiency Rept 90 Re Overstressed Electrical Conduit.Independent Testing Under Evaluation.Final Rept Will Be Submitted by 840525)
  • ML20039D307  + (Third Interim Significant Const Deficiency Rept 30 Re Changeout of ASTM A193 Stainless Steel Bolts on Motor Control Ctr Bus Bars.Bolting Matl Acquisition Problem Remains Unresolved.Final Rept Will Be Submitted by 820115)
  • ML20079H172  + (Third Interim Significant Const Deficiency Rept 83 Re Heat Tracing Design Defects Identified During Functional Testing. Corrective Action Scheduled for Completion in mid-Feb 1984. Final Rept Will Be Submitted on 840302)
  • ML20088A869  + (Third Interim Significant Const Deficiency Rept 96 Re Failure of Chemical & Vol Control Sys Pumps Train a to Start on Safety Injection Actuation Signal.Final Rept Will Be Provided by 840420)
  • ML20039G584  + (Third Interim Significant Const Deficiency Rept Re Switchgear Breaker Position Switch Operator.Corrective Action Not Completed.Final Rept by 820131)
  • W3P84-2552, Third Interim Significant Const Deficiency Rept 114 Re Possible Damage to safety-related Equipment Due to Water Hammers.Next Rept Delayed Until 840921  + (Third Interim Significant Const Deficiency Rept 114 Re Possible Damage to safety-related Equipment Due to Water Hammers.Next Rept Delayed Until 840921)
  • ML20080L867  + (Third Interim Significant Const Deficiency Rept 76 Re Damage to Pressurizer Heaters During Hot Functional Testing. All 30 Pressurizer Heaters Replaced.Welding & NDE Testing Performed Per ASME Code.Next Rept by 831014)
  • ML20083N857  + (Third Interim Significant Const Deficiency 97,re Diesel Generator B Turbocharger Failure.Corrective Action & Documentation Review Scheduled to Be Completed in mid- Apr 1984.Final Rept Will Be Submitted on 840427)
  • ML20095H958  + (Third Interim Significant Const Deficiency Rept 108 Re Failure to Comply W/Fsar Safe Shutdown Commitment.Initially Reported on 840719.Verification of Corrective Action Supporting Documentation Incomplete.Final Rept by 840831)
  • ML20062E588  + (Third Interim Significant Const Deficiency 33 Re Chilled Water Piping Supports.Corrective Action Not Completed.Final Rept Expected by 821001)
  • ML20024B789  + (Third Interim Significant Deficiency Rept Rdc 64(83) Re Linear Indications in Bracket Welds for Main Steam & Recirculation Sys Pipe Whip Restraints.Initially Reported on 821228.Completion of Corrective Actions by 841215)
  • ML071980142  + (Third Interval ASME Section XI Relief Requests, North Anna, Unit 1 Relief Request CMP-023, North Anna, Unit 2 Relief Request CMP-024)
  • ML041550387  + (Third Interval ASME Section XI Relief Requests Revision to North Anna Unit 1 Relief Requests NDE-1 and NDE-2 Withdrawal of North Anna Unit 2 Relief Requests NDE-2 and NDE-3)
  • ML20127N432  + (Third Interval ISI Program)
  • ML20086B375  + (Third Interval ISI Program 930901 - 030831, Rev 1)
  • ML20207F026  + (Third Interval Inservice Insp Program Plan for Ccnpp,Units 1 & 2)
  • ML020990380  + (Third Interval Inservice Inspection Program Revised Relief Request SPT-001 for North Anna Power Station)
  • ML18347A498  + (Third Interval Inservice Inspection Program for Class 1, 2 & 3 Components and Their Supports)
  • ML021550341  + (Third Interval Inservice Inspection Program Relief, Risk-Informed Inservice Inspection (ISI) Program)
  • ML023190089  + (Third Interval Inservice Inspection Program Relief Request No. RR-RI-ISI-2; Risk Informed Inservice Inspection (ISI) Program)
  • NL-07-0153, Third Interval Inservice Testing (IST) Program Update  + (Third Interval Inservice Testing (IST) Program Update)
  • L-2009-035, Third Interval Relief Requests 31 and 32  + (Third Interval Relief Requests 31 and 32)
  • ML20126L211  + (Third Joint Rept Re Status of Negotiations for Settlement Proceedigns.Doe Compiled site-specific Data & Draft Guidance for Procedures Governing Submission & Review of Applications.W/Certificate of Svc.Related Correspondence)
  • ML20083Q380  + (Third Joint Rept of Limerick Ecology Action,Applicant & NRC on Status of Negotiations Re Onsite Emergency Planning Contentions & Limerick Ecology Action Dismissal of Particular Contentions.Certificate of Svc Encl)
  • ML18348B152  + (Third Joint Status Report)
  • ML19327B708  + (Third Joint Status Rept & Joint Motion to Extend Discovery.* Consultants Retained by NRC Will Not Be Available for Deposition Until After 900101 & NRC & Util Have Agreed to Defer Depositions of Util Witnesses.W/Certificate of Svc)
  • ML19332D517  + (Third Joint Status Rept & Joint Motion to Extend Discovery.* W/Certificate of Svc.Served on 891115.Granted for Board on 891106)
  • ML20101K059  + (Third Listing of Board Notifications of Documents Contained in Joint Mailgram Exhibit 1(c) on Which ASLB Intends to Rely in Findings.Svc List Encl.Related Correspondence)
  • ML20107J088  + (Third Motion for Summary Disposition Re Lack of Independence &/Or Credibility of Cygna)
  • ML20070U173  + (Third Motion for Summary Disposition of New England Coalition on Nuclear Pollution Contention 1.F. Interrogatories Show Contention Withdrawn & W/O Basis.W/ Certificate of Svc.Related Correspondence)
  • ML19340C446  + (Third Motion to Compel Production of Documents Directed to Util.Contains Response Opposing Util 801023 Motion for Protective Order.Request Need Not Be as Narrowly Drawn as Contention.W/Certificate of Svc.Related Correspondence)
  • ML25177C602  + (Third Nuclear Safety Culture Assessment of the NIST Center for Neutron Research)
  • ML081050643  + (Third Order Relating to the Service and Contents of Westcans Reply Dated February 15, 2008)
  • L-2014-274, Third Overall Integrated Plan Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order EA-12-049)  + (Third Overall Integrated Plan Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order EA-12-049))
  • ML20091M373  + (Third Part 21 & Deficiency Rept,Item 110 Re Potential Defect in Tdi Piston Skirt Castings.Initially Reported on 821216. Skirts to Be Removed & Sent to Vendor for Test.Next Rept to Be Submitted by 841218)
  • ML20087M549  + (Third Part 21 & Deficiency Rept,Item 95 Re Shop Welding Defects in Seismic I Pipe Hangers Supplied by Bergen- Patterson & Item 72 Re Undersized Skewed Tee Fillet Weld on Hangers.Final Rept by 841201)
  • ML20138D490  + (Third Partial Initial Decision LBP-85-49 on Emergency Planning & Safety Contentions.Served on 851211)
  • ML20128C617  + (Third Partial Response to Case Fifth Set of Interrogatories & Requests to Produce Re Credibility.Response Restricted to Requests Re Validity or Reliability of Tests & Samples. Affidavits & Certificate of Svc Encl.Related Correspondence)
  • ML20207Q077  + (Third Partial Response to FOIA Request Re Allegations in Connection W/Sser 22 (NUREG-0675) Concerning Operation of Facility.Forwards App C Documents.Documents Also Available in PDR)
  • ML20134N796  + (Third Partial Response to FOIA Request for Documents.Records Identified in App G Available in Pdr.Records Identified in App H Available in PDR & Encl)
  • ML20134B481  + (Third Partial Response to FOIA Request for Documents.Records Identified in App G Available in Pdr.Records Identified in App H Available in PDR & Encl)
  • IA-96-298, Third Partial Response to FOIA Request for Documents.Records Identified in App G Available in Pdr.Records Identified in App H Available in PDR & Encl  + (Third Partial Response to FOIA Request for Documents.Records Identified in App G Available in Pdr.Records Identified in App H Available in PDR & Encl)
  • ML20133B352  + (Third Partial Response to FOIA Request for Documents.Records in App F Already Available in Pdr.App G Records Encl & Being Released in Entirety)
  • ML20133B354  + (Third Partial Response to FOIA Request for Documents.Records in App F Already Available in Pdr.App G Records Encl & Being Released in Entirety)
  • ML20151W777  + (Third Partial Response to FOIA Request for Documents.App C Documents Encl & Available in Pdr.Addl Records Referred to Dept of Commerce & Doi for Review & Direct Response)
  • ML20044A047  + (Third Partial Response to FOIA Request for Records.App E Records Encl & Available in Pdr.App F Records Withheld (Ref FOIA Exemption 5))
  • ML20248G116  + (Third Partial Response to FOIA Request for Documents.Records in App C Will Be Available in Pdr.Records Withheld in Part (Ref FOIA Exemption 6))