ML20088A869
| ML20088A869 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 03/30/1984 |
| From: | Gerrets T LOUISIANA POWER & LIGHT CO. |
| To: | Jay Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| 96, W3K84-0776, W3K84-776, NUDOCS 8404130247 | |
| Download: ML20088A869 (2) | |
Text
.
1 LOUISIANA P O W E R & L i G H T! P O BOX 6008. NEW ORLEANS. LOUIS!ANA 70174 142 ORARONDE STREET
. (504) 366 2345 g
UTIUTIES SYSTEM March 30, 1984 W3K84-0776 Q-3-A35.07.96 bh[ h)}
fP~
d I Mr. John T. Collins Regional Administrator, Region IV
,LI1 U. S. Nuclear Regulatory Commission AER - 9 lggf
- L 611 Ryan Plaza Drive, Suite 1000 6
Arlington, Texas 76012
_g i
REFERENCE:
LP&L letter W3K84-0431 dated March 9, 1984
Dear Mr. Collins:
SUBJECT:
Waterford SES Unit No. 3 Docket No. 50-382 Significant Construction Deficiency No. 96
" Failure of CVCS Pumps Train "A" to Start on SIAS" Third Interim Report The above referenced letter indicated submittal or a Final Report on March 30, 1984.
At the present time, closure of the above item is pending receipt of a new qualified latching relay and completion of the supporting documentation reviews.
The Final Report will provided to the USNRC on April 20, 1984.
Very truly yours.
T. F. Gerrets Corporate Quality Assurance Manager TFC:CNH:VBR cc: Director Office of Inspection & Enforcement U. S. Nucicar Regulatory Commission Washington, D.C.
20555 kO y
O u07s\\o
[
--CY
[
f o
I ~
Mr. John T. Collins I
LMarch 30, 1984 l
W3K84-0776 Page 2 cc:' Director Office of Management l
Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.
20555
- Mr. E. L. Blake Shaw, Pittman, Potts & Trowbridge
-1800 M Street, N.W.
Washington, D.C.
20036 i
Mr. W..M. Stevenson Monroe & Lemann
[
1424 Whitney Building
?
New Orleans, Louisiana 70130 Mr. W. A. Cross 7910 Woodmont Avenue l
Suite 1200
)
Bethasda, Maryland 20814 Y
l 4
h k
1
.. S L;
?
F t.
..i L3.s
'(
F
.