ML20095H958
| ML20095H958 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 08/10/1984 |
| From: | Gerrets T LOUISIANA POWER & LIGHT CO. |
| To: | Jay Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| 108, W3K84-1880, NUDOCS 8408290139 | |
| Download: ML20095H958 (2) | |
Text
-
v Louisiama P OW E R & L1 G H T/Waterford 3 SES/P. O. Box B/Killona, LA 70066 00uS$$NU August 10, 1984 W3K84-1880 Q-3-A35.07.108 Mr. John T. Collins Regional Administrator, Region IV U. S. Nuclear Regulatory Commission
. h@@Q]%
611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012 4
REFERENCE:
LP&L letter W3K84-1658 dated July 19, 1984 AUG 20m
Dear Mr. Collins:
I
SUBJECT:
Waterford SES Unit No. 3 Docket No. 50-382 Significant Construction Deficiency No. 108
" Potential Failure to Comply With FSAR Safe Shutdown Commitment" Third Interim Report The above referenced letter indicated submittal of the Final Report to the USNRC on August 10, 1984.
At the present time, corrective action is completed, however, verification of supporting documentation is scheduled to be completed in mid August 1984. The Final Report is scheduled to be submitted to the USNRC on August 31, 1984.
Very truly yours, T. F. Gerrets Corporate Quality Assurance Manager TFG:CNH:VBR cc: Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C.
20355
/
B408290139 840810
/
PDRADOCK05000g 3D S
p-6-
.w ;;,
k TO:
Mr. John T. Collins
-August 10, 1984-V3K84-1880 Page.2 cc:- Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.
20555 Mr. E. L. Blake Shaw, Pittman, Potts & Trowbridge 1800 M Street, N.W.
Washington, D.C.
20036 Mr. W. M. Stevenson Monroe & Lemann 1424 Whitney Building New Orleans, Louisiana 70130 Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500
. Atlanta, Georgia 30339 Mr. W. A. Cross 7910 Woodmont Avenue Suite 1200 Bethesda, Maryland 20814 1
i
,