ML20039D307

From kanterella
Jump to navigation Jump to search
Third Interim Significant Const Deficiency Rept 30 Re Changeout of ASTM A193 Stainless Steel Bolts on Motor Control Ctr Bus Bars.Bolting Matl Acquisition Problem Remains Unresolved.Final Rept Will Be Submitted by 820115
ML20039D307
Person / Time
Site: Waterford Entergy icon.png
Issue date: 12/21/1981
From: Lendon G
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, W3K81-0457, W3K81-457, NUDOCS 8112310510
Download: ML20039D307 (1)


Text

L.O UISI AN A f 242 OuanONOe S1nta POWE R & LIG HT/ P O BOX 6008

  • NEW ORLEANS. LOUISIANA 70174 * (504) 366-2345

$E0Issys$

December 21, 1981 G D. McLENDON Senict Vice President W3K81-0457 Q-3-A35.07.30 Mr. John T. Collins, Regional Administrator, Region IV 50 U. S. Nuclear Regulatory Commission Of fice of Inspection and Enforcement gCgyED 611 Ryan Plaza Drive, Suite 1000 g

DECS0198W 9

Arlington, Texas 76012

SUBJECT:

Waterford SES Unit 3 h

E W,,,,p gssues

,, mass a Docket No. 50-382 Third Interim Report g

Significant Construction Deficiency No. 30

" '/

" Change Out of ASTM A193 S.S. Bolts on Motor Control Center Bus Bars"

Reference:

LP&L Letter W3K81-0400 to USNRC dated November 4, 1981

Dear Mr. Collins:

In the referenced letter, LP&L notified the NRC that the Final Report on Significant Construction Deficiency No. 30 would be delayed until December 15, 1981.

l As of this date, a bolting material acquisition problem still exists. Based on final report will be submitted to the NRC by January 15, 1982.

this status, a If you have any questions, please let us know.

Very truly yours, GDMcL:LLB:ned cc:

1) Director Of fice of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555
2) Director Of fice of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C. 20555 8112310510 811221 PDR ADOCK 05000382

,1 PDR 9 g S