ML20039D307
| ML20039D307 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 12/21/1981 |
| From: | Lendon G LOUISIANA POWER & LIGHT CO. |
| To: | Jay Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, W3K81-0457, W3K81-457, NUDOCS 8112310510 | |
| Download: ML20039D307 (1) | |
Text
L.O UISI AN A f 242 OuanONOe S1nta POWE R & LIG HT/ P O BOX 6008
- NEW ORLEANS. LOUISIANA 70174 * (504) 366-2345
$E0Issys$
December 21, 1981 G D. McLENDON Senict Vice President W3K81-0457 Q-3-A35.07.30 Mr. John T. Collins, Regional Administrator, Region IV 50 U. S. Nuclear Regulatory Commission Of fice of Inspection and Enforcement gCgyED 611 Ryan Plaza Drive, Suite 1000 g
DECS0198W 9
Arlington, Texas 76012
SUBJECT:
Waterford SES Unit 3 h
E W,,,,p gssues
,, mass a Docket No. 50-382 Third Interim Report g
Significant Construction Deficiency No. 30
" '/
" Change Out of ASTM A193 S.S. Bolts on Motor Control Center Bus Bars"
Reference:
LP&L Letter W3K81-0400 to USNRC dated November 4, 1981
Dear Mr. Collins:
In the referenced letter, LP&L notified the NRC that the Final Report on Significant Construction Deficiency No. 30 would be delayed until December 15, 1981.
l As of this date, a bolting material acquisition problem still exists. Based on final report will be submitted to the NRC by January 15, 1982.
this status, a If you have any questions, please let us know.
Very truly yours, GDMcL:LLB:ned cc:
- 1) Director Of fice of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555
- 2) Director Of fice of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C. 20555 8112310510 811221 PDR ADOCK 05000382
,1 PDR 9 g S
i