|
---|
Category:Letter type:DCL
MONTHYEARDCL-24-095, CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 20232024-11-0606 November 2024 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 2023 DCL-24-103, Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 22024-10-24024 October 2024 Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 2 DCL-24-092, Supplement and Annual Update License Renewal Application, Amendment 12024-10-14014 October 2024 Supplement and Annual Update License Renewal Application, Amendment 1 DCL-24-098, Material Status Report for the Period Ending August 31, 20242024-10-0909 October 2024 Material Status Report for the Period Ending August 31, 2024 DCL-24-091, Response to Request for Additional Information by the Office of Nuclear Reactor Regulation2024-10-0303 October 2024 Response to Request for Additional Information by the Office of Nuclear Reactor Regulation DCL-24-087, License Renewal - Historic and Cultural Resources Reference Documents (Redacted)2024-09-12012 September 2024 License Renewal - Historic and Cultural Resources Reference Documents (Redacted) DCL-24-083, CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated2024-09-0909 September 2024 CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated DCL-24-078, Pre-Notice of Disbursement from Decommissioning Trust2024-09-0303 September 2024 Pre-Notice of Disbursement from Decommissioning Trust DCL-24-082, Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment2024-08-28028 August 2024 Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment DCL-24-077, Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident2024-08-15015 August 2024 Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident DCL-24-075, Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React2024-08-0808 August 2024 Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React DCL-24-079, DC-2024-07 Post Exam Comments Analysis2024-08-0202 August 2024 DC-2024-07 Post Exam Comments Analysis DCL-24-070, License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2024-07-31031 July 2024 License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies DCL-24-071, Core Operating Limits Report for Unit 2 Cycle 252024-07-22022 July 2024 Core Operating Limits Report for Unit 2 Cycle 25 DCL-2024-523, Submittal of Report on Discharge Self-Monitoring2024-07-18018 July 2024 Submittal of Report on Discharge Self-Monitoring DCL-2024-527, Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant2024-07-0101 July 2024 Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant DCL-24-066, Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL2024-06-27027 June 2024 Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL DCL-24-052, Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report2024-05-16016 May 2024 Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report DCL-24-051, One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage2024-05-0808 May 2024 One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage DCL-24-047, 2023 Annual Non-radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Non-radiological Environmental Operating Report DCL-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Radiological Environmental Operating Report DCL-24-048, O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 20232024-04-30030 April 2024 O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 2023 DCL-24-027, 2023 Annual Radioactive Effluent Release Report2024-04-28028 April 2024 2023 Annual Radioactive Effluent Release Report DCL-24-045, Annual Report of Occupational Radiation Exposure for 20232024-04-24024 April 2024 Annual Report of Occupational Radiation Exposure for 2023 DCL-24-042, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-04-17017 April 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations DCL-24-022, Notification of Changes to Decommissioning Schedule2024-04-0202 April 2024 Notification of Changes to Decommissioning Schedule DCL-24-023, Revised Certification of Permanent Cessation of Power Operations2024-04-0202 April 2024 Revised Certification of Permanent Cessation of Power Operations DCL-24-031, Decommissioning Funding Report2024-03-27027 March 2024 Decommissioning Funding Report DCL-24-032, 2024 Annual Statement of Insurance for Pacific Gas and Electric Company’S Diablo Canyon Power Plant2024-03-27027 March 2024 2024 Annual Statement of Insurance for Pacific Gas and Electric Company’S Diablo Canyon Power Plant DCL-24-028, Request for Enforcement Discretion Regarding Compliance with Technical Specification 3.0.3, Limiting Condition for Operation Applicability2024-03-21021 March 2024 Request for Enforcement Discretion Regarding Compliance with Technical Specification 3.0.3, Limiting Condition for Operation Applicability DCL-24-018, License Amendment Request 24-01 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2024-02-28028 February 2024 License Amendment Request 24-01 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) DCL-2024-507, 2023 Annual Report on Discharge Self-Monitoring2024-02-27027 February 2024 2023 Annual Report on Discharge Self-Monitoring DCL-24-020, Nuclear Material Transaction Report for New Fuel2024-02-21021 February 2024 Nuclear Material Transaction Report for New Fuel DCL-24-014, Owners Activity Report for Unit 1 Twenty-Fourth Refueling Outage2024-02-12012 February 2024 Owners Activity Report for Unit 1 Twenty-Fourth Refueling Outage DCL-24-013, Nuclear Material Transaction Report for New Fuel2024-02-0707 February 2024 Nuclear Material Transaction Report for New Fuel DCL-24-010, Nuclear Material Transaction Report for New Fuel2024-01-29029 January 2024 Nuclear Material Transaction Report for New Fuel DCL-2024-502, 2023 Annual Sea Turtle Report for Diablo Canyon Power Plant (DCPP)2024-01-25025 January 2024 2023 Annual Sea Turtle Report for Diablo Canyon Power Plant (DCPP) DCL-2024-501, Sea Turtle Stranding Report (Green Sea Turtle)2024-01-24024 January 2024 Sea Turtle Stranding Report (Green Sea Turtle) DCL-2024-500, Transmittal of the 4th Quarter of 2023 Report on Discharge Self-Monitoring2024-01-18018 January 2024 Transmittal of the 4th Quarter of 2023 Report on Discharge Self-Monitoring DCL-24-008, Schedule Considerations for Review of the DCPP License Renewal Application2024-01-17017 January 2024 Schedule Considerations for Review of the DCPP License Renewal Application DCL-24-009, Nuclear Material Transaction Report for New Fuel2024-01-17017 January 2024 Nuclear Material Transaction Report for New Fuel DCL-24-004, Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2024-01-15015 January 2024 Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b DCL-23-129, Nuclear Material Transaction Report for New Fuel2023-12-27027 December 2023 Nuclear Material Transaction Report for New Fuel DCL-23-122, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-14014 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation DCL-23-128, Emergency Plan Update2023-12-13013 December 2023 Emergency Plan Update DCL-23-125, Core Operating Limits Report for Unit 1 Cycle 252023-12-0606 December 2023 Core Operating Limits Report for Unit 1 Cycle 25 DCL-23-121, Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System2023-11-16016 November 2023 Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System DCL-23-120, License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System2023-11-14014 November 2023 License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System DCL-23-118, License Renewal Application2023-11-0707 November 2023 License Renewal Application DCL-2023-520, Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP)2023-10-19019 October 2023 Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) 2024-09-09
[Table view] Category:Report
MONTHYEARDCL-24-095, CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 20232024-11-0606 November 2024 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 2023 ML24305A1872024-10-31031 October 2024 OEDO-24-00083 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic CDF - Petition Supplement 10-30-2024 DCL-24-103, Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 22024-10-24024 October 2024 Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 2 ML24129A1762024-06-14014 June 2024 National Historic Preservation Act Section 106 Consultation – Results of Identification and Evaluation (Docket Number: 72-026) DCL-24-051, One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage2024-05-0808 May 2024 One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage DCL-24-048, O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 20232024-04-30030 April 2024 O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 2023 OIG-24-A-01, Inspector General’S Assessment of the Most Serious Management and Performance Challenges Facing the U.S. Nuclear Regulatory Commission in Fiscal Year 20242023-11-0303 November 2023 OIG-24-A-01 Inspector General’S Assessment of the Most Serious Management and Performance Challenges Facing the U.S. Nuclear Regulatory Commission in Fiscal Year 2024 ML23130A0052023-06-27027 June 2023 Report to Congress Regarding Diablo Canyon ML22108A1662022-05-0303 May 2022 Enclosure 1 - Assessment Event Inquiry Into the Nuclear Regulatory Commission Oversight of the Auxiliary Feedwater System at Diablo Canyon Nuclear ML22108A2892022-05-0303 May 2022 Enclosure - Response to Representative Carbajal Regarding OIG Report on Diablo ML24289A0962022-03-31031 March 2022 Definition of a Probable Maximum Tsunami at the Diablo Canyon Nuclear Power Plant Site: a Historical Perspective L-22-003, Independent Spent Fuel Storage Installation - License Renewal Application for the Diablo Canyon Independent Spent Fuel Storage Installation2022-03-0909 March 2022 Independent Spent Fuel Storage Installation - License Renewal Application for the Diablo Canyon Independent Spent Fuel Storage Installation DCL-21-071, Federally Listed Species Affects Determination Memorandum2021-10-14014 October 2021 Federally Listed Species Affects Determination Memorandum ML21188A0362021-07-0707 July 2021 Draft PG&E Letter DCL-21-046 - Diablo Canyon Unit 1: Emergency License Amendment Request 21-05, Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System ML20353A3972020-12-18018 December 2020 NRC Response to Public Comment Regarding Spent Fuel Canister Drop from 2019 Regcon DCL-20-102, Nuclear Material Transaction Report for New Fuel2020-12-0909 December 2020 Nuclear Material Transaction Report for New Fuel ML20335A0132020-11-30030 November 2020 NRC Response to Public Watchdogs November 2 ML20328A3012020-11-23023 November 2020 NERC Reliability Standards for the Bulk Electric System of North America Updated July 20, 2020 (Cgnp Public Comments on Diablo Canyon Nuclear Power Plant, Units 1 and 2 - Pre-submittal Meeting of 11/24/2020) ML20239A9562020-08-26026 August 2020 Evaluation of the Potential Piping Degradation Safety Concern on the Auxiliary Feedwater System at Diablo Canyon Unit 1 DCL-19-054, Submittal of Acceptance Report Following the Installation of Structural Weld Overlay, REP-RHR-SWOL for Unit 12019-07-0101 July 2019 Submittal of Acceptance Report Following the Installation of Structural Weld Overlay, REP-RHR-SWOL for Unit 1 ML18254A0402019-01-22022 January 2019 Staff Review of Seismic Probabilistic Risk Assessment Associated with Reevaluated Seismic Hazard Implementation of the Near Term Task Force Recommendation 2.1: Seismic DCL-18-050, Evaluation Documents in Support of Structural Weld Overlay, REP-RHR-SWOL, Unit 22018-09-11011 September 2018 Evaluation Documents in Support of Structural Weld Overlay, REP-RHR-SWOL, Unit 2 IR 05000275/20180052018-08-31031 August 2018 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2018005 and 05000323/2018005) DCL-18-058, Flaw Evaluation of Unit 2, ASME Code Class 2 Charging Pump Discharge Lines: Welds WIC-45A and RB-46-72018-08-0808 August 2018 Flaw Evaluation of Unit 2, ASME Code Class 2 Charging Pump Discharge Lines: Welds WIC-45A and RB-46-7 DCL-18-027, Seismic Probabilistic Risk Assessment for the Diablo Canyon Power Plant, Units 1 & 2 - Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1: Seismic of the Near-Term Task Force Review of Insight2018-04-24024 April 2018 Seismic Probabilistic Risk Assessment for the Diablo Canyon Power Plant, Units 1 & 2 - Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1: Seismic of the Near-Term Task Force Review of Insights ML17024A2072017-12-18018 December 2017 Staff Assessment of Response to 10 CFR 50.54(F) Information Request Flood-Causing Mechanism Reevaluation ML17341A0652017-11-30030 November 2017 Technical Evaluation Report Diablo Canyon Nuclear Power Plant Tsunami Hazard Reevaluation Review ML17334A1052017-11-29029 November 2017 Reactor Coolant System Pressure and Temperature Limits Report ML17229B6172017-08-17017 August 2017 Flaw Evaluation of Residual Heat Removal Suction Weld Joint DCL-17-064, Plant Focused Evaluation Report for External Flooding2017-07-19019 July 2017 Plant Focused Evaluation Report for External Flooding DCL-17-049, Flaw Evaluation of Unit 2 Residual Heat Removal Suction Weld Joint2017-05-18018 May 2017 Flaw Evaluation of Unit 2 Residual Heat Removal Suction Weld Joint DCL-16-117, Reactor Coolant System Pressure and Temperature Limits Report, Revision 152016-11-10010 November 2016 Reactor Coolant System Pressure and Temperature Limits Report, Revision 15 ML16314B0822016-11-0909 November 2016 Criteria for Protection Against Dynamic Effects Associated with a Postulated Rupture of Piping ML16314C6912016-11-0909 November 2016 Enclosure, Statement of the Problem Concerning PWR Primary Coolant System Pipe Rupture DCL-16-124, Implementation of Alternative Source Term Summary of Dose Analyses and Results Revision 52016-11-0909 November 2016 Implementation of Alternative Source Term Summary of Dose Analyses and Results Revision 5 ML16287A7552016-10-0606 October 2016 Technical Assessment Implementation of Alternative Source Terms Summary of Dose Analyses and Results Revision 4 ML16215A1092016-08-0202 August 2016 OEDO-16-00436 - Supplemental Information from Mr. Lochbaum 10 CFR 2.206 Petition on Apparent Violation of 10 CFR 50.9 at Diablo Canyon Nuclear Power Plant ML16169A2652016-05-18018 May 2016 Technical Report, Implementation of Alternative Source Terms Summary of Dose Analysis and Results, Revision 3 ML16146A0952016-04-21021 April 2016 54006-CALC-01, Diablo Canyon Power Plant: Evaluation of Risk Significance of Permanent ILRT Extension. DCL-16-081, 15-0681-RTM-001, Revision 0, System Level Requirements Traceability Matrix (Rtm).2016-03-31031 March 2016 15-0681-RTM-001, Revision 0, System Level Requirements Traceability Matrix (Rtm). ML16238A1042016-03-31031 March 2016 15-0681-RTM-001, Revision 0, System Level Requirements Traceability Matrix (Rtm). ML16019A2242016-02-0101 February 2016 Record of Review, Dispositions to Diablo Canyon Nuclear Plant, Units 1 and 2, Internal Events, Internal Flooding, Seismic, and Fire PRA Facts and Observations DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-861-NP, V&V Design Phase Summary Report Ppsi2016-01-15015 January 2016 Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-861-NP, V&V Design Phase Summary Report Ppsi DCL-16-020, Diablo Canyon, Units 1 and 2 - 9Revision 1 to 93754-12-862-NP, V&V Implementation Phase Summary Report PPSII-IV2016-01-15015 January 2016 Diablo Canyon, Units 1 and 2 - 9Revision 1 to 93754-12-862-NP, V&V Implementation Phase Summary Report PPSII-IV ML16061A4682016-01-15015 January 2016 9Revision 1 to 93754-12-862-NP, V&V Implementation Phase Summary Report PPSII-IV ML16061A4642016-01-15015 January 2016 Revision 3 to 993754-11-861-NP, V&V Design Phase Summary Report Ppsi DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-854-1-NP, Protection Set I, Factory Acceptance Test Report2016-01-14014 January 2016 Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-854-1-NP, Protection Set I, Factory Acceptance Test Report ML16061A4592016-01-14014 January 2016 Revision 3 to 993754-11-854-1-NP, Protection Set I, Factory Acceptance Test Report ML16048A2152015-12-15015 December 2015 Fleet Vehicle-Asset List ML16048A2072015-12-15015 December 2015 Once Through Cooling 2024-06-14
[Table view] Category:Miscellaneous
MONTHYEARDCL-24-095, CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 20232024-11-0606 November 2024 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 2023 ML24129A1762024-06-14014 June 2024 National Historic Preservation Act Section 106 Consultation – Results of Identification and Evaluation (Docket Number: 72-026) DCL-24-048, O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 20232024-04-30030 April 2024 O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 2023 ML23130A0052023-06-27027 June 2023 Report to Congress Regarding Diablo Canyon ML22108A2892022-05-0303 May 2022 Enclosure - Response to Representative Carbajal Regarding OIG Report on Diablo ML22108A1662022-05-0303 May 2022 Enclosure 1 - Assessment Event Inquiry Into the Nuclear Regulatory Commission Oversight of the Auxiliary Feedwater System at Diablo Canyon Nuclear DCL-21-071, Federally Listed Species Affects Determination Memorandum2021-10-14014 October 2021 Federally Listed Species Affects Determination Memorandum ML21188A0362021-07-0707 July 2021 Draft PG&E Letter DCL-21-046 - Diablo Canyon Unit 1: Emergency License Amendment Request 21-05, Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System DCL-20-102, Nuclear Material Transaction Report for New Fuel2020-12-0909 December 2020 Nuclear Material Transaction Report for New Fuel ML20335A0132020-11-30030 November 2020 NRC Response to Public Watchdogs November 2 ML20328A3012020-11-23023 November 2020 NERC Reliability Standards for the Bulk Electric System of North America Updated July 20, 2020 (Cgnp Public Comments on Diablo Canyon Nuclear Power Plant, Units 1 and 2 - Pre-submittal Meeting of 11/24/2020) ML18254A0402019-01-22022 January 2019 Staff Review of Seismic Probabilistic Risk Assessment Associated with Reevaluated Seismic Hazard Implementation of the Near Term Task Force Recommendation 2.1: Seismic IR 05000275/20180052018-08-31031 August 2018 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2018005 and 05000323/2018005) ML17024A2072017-12-18018 December 2017 Staff Assessment of Response to 10 CFR 50.54(F) Information Request Flood-Causing Mechanism Reevaluation DCL-16-117, Reactor Coolant System Pressure and Temperature Limits Report, Revision 152016-11-10010 November 2016 Reactor Coolant System Pressure and Temperature Limits Report, Revision 15 ML16215A1092016-08-0202 August 2016 OEDO-16-00436 - Supplemental Information from Mr. Lochbaum 10 CFR 2.206 Petition on Apparent Violation of 10 CFR 50.9 at Diablo Canyon Nuclear Power Plant ML16019A2242016-02-0101 February 2016 Record of Review, Dispositions to Diablo Canyon Nuclear Plant, Units 1 and 2, Internal Events, Internal Flooding, Seismic, and Fire PRA Facts and Observations ML16048A2072015-12-15015 December 2015 Once Through Cooling ML16048A2152015-12-15015 December 2015 Fleet Vehicle-Asset List DCL-15-102, 10 CFR 71.95 Report Regarding Energy Solutions' Model 8-120B Shipping Cask2015-08-24024 August 2015 10 CFR 71.95 Report Regarding Energy Solutions' Model 8-120B Shipping Cask ML15231A5712015-07-28028 July 2015 Holtec Information Bulletin (HIB) No. 67 (Rev. 0), VCT Restraint Strap Weld Failure ML15160A2612015-07-0101 July 2015 Letter to NMFS Notice of Intent to Reinitiate Scoping Process for Diablo Canyon Power Plant Units 1 and 2 License Renewal Application ML16048A2042015-06-30030 June 2015 Notice of Intent, General Permit to Discharge Storm Water ML16048A2132015-06-22022 June 2015 Permit Renewal No. 49-1 ML15355A2972015-05-31031 May 2015 DCPP Fsaru R22 File a Drawings - Combined - (Redacted) ML15355A0792015-05-31031 May 2015 DCPP Fsaru R22 File B Drawings - Combined (Redacted) RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 2 of 52014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 2 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 ML14189A5432014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 ML14189A5372014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5 ML14189A5332014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5 ML14189A5312014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 2 of 5 ML14189A5002014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 1 of 5 RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 52014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 52014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 52014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 1 of 52014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 1 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 2 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 DCL-14-030, Diablo, Units 1 and 2 - Report of 10 CFR 50.59, Changes, Tests and Experiments, for the Period of January 1, 2012 Through December 31, 20132014-04-17017 April 2014 Diablo, Units 1 and 2 - Report of 10 CFR 50.59, Changes, Tests and Experiments, for the Period of January 1, 2012 Through December 31, 2013 DCL-14-021, Reactor Coolant System Pressure and Temperature Limits Report for Units 1 and 22014-03-25025 March 2014 Reactor Coolant System Pressure and Temperature Limits Report for Units 1 and 2 ML13364A1922014-02-0303 February 2014 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) DCL-13-094, and Humboldt Bay Power Plant, 10 CFR 71.95 Reports Regarding Energysolutions' Model 8-120B Shipping Cask2013-09-30030 September 2013 and Humboldt Bay Power Plant, 10 CFR 71.95 Reports Regarding Energysolutions' Model 8-120B Shipping Cask DCL-12-080, Nonroutine Report of Planned Disturbance of Archaeological Site SLO-22012-08-21021 August 2012 Nonroutine Report of Planned Disturbance of Archaeological Site SLO-2 DCL-12-050, Diablo Canyon, Units 1 and 2, Attachment 16 to DCL-12-050, PGE-12-52 Np, Westinghouse Input to Diablo Canyon Digital Process Protection System Replacement Uncertainty Calculations Summary Lar.2012-06-0606 June 2012 Diablo Canyon, Units 1 and 2, Attachment 16 to DCL-12-050, PGE-12-52 Np, Westinghouse Input to Diablo Canyon Digital Process Protection System Replacement Uncertainty Calculations Summary Lar. ML12170A8402012-06-0606 June 2012 Attachment 16 to DCL-12-050, PGE-12-52 Np, Westinghouse Input to Diablo Canyon Digital Process Protection System Replacement Uncertainty Calculations Summary Lar. DCL-12-023, Third Interval Snubber Program, Revision 12012-02-28028 February 2012 Third Interval Snubber Program, Revision 1 DCL-11-136, Annual Update to the DCPP License Renewal Application and License Renewal Application Amendment Number 452011-12-21021 December 2011 Annual Update to the DCPP License Renewal Application and License Renewal Application Amendment Number 45 DCL-11-073, Diablo Canyon, Unit 2 - Core Operating Limits Report for Cycle 172011-06-18018 June 2011 Diablo Canyon, Unit 2 - Core Operating Limits Report for Cycle 17 ML1116803532011-06-18018 June 2011 Core Operating Limits Report for Cycle 17 ML1109402692011-04-0505 April 2011 Evaluation Regarding the 2009 Steam Generator Tube Inspections Performed During the 15th Refueling Outage (2R15) DCL-10-158, CFR 54.21(b) Annual Update to the DCPP License Renewal Application and Amendment No. 342010-12-29029 December 2010 CFR 54.21(b) Annual Update to the DCPP License Renewal Application and Amendment No. 34 ML1025803172010-08-0202 August 2010 2009 Meteorological Data 2024-06-14
[Table view] |
Text
Pacific Gas and Electric Company James R. Becker Diablo Canyon Power Plant Site Vice President Mail Code 104/6 P. O. Box 56 Avila Beach, CA 93424 805.545.3462 February 28,2012 Internal: 691.3462 Fax: 805.545.6445 PG&E Letter DCL-12-023 U.S. Nuclear Regulatory Commission 10 CFR 50.55a ATTN: Docu ment Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Power Plants (DCPP) Units 1 and 2 Diablo Canyon Power Plant Third Interval Snubber Program. Revision 1
Dear Commissioners and Staff:
In accordance with the provisions of 10 CFR 50.55a(b)(3)(v), Pacific Gas and Electric Company (PG&E) submits Diablo Canyon Power Plant (DCPP) Third Interval Snubber Program, Revision 1. The third 10-year interval began January 1, 2006, for Unit 1 and July 1, 2006, for Unit 2.
DCPP Third Interval Snubber Program, Revision 0, was submitted in December 2010 (PG&E Letter to NRC, DCL-1 0-157, dated December 21,2010). This document has been revised, effective February 06, 2012, to clarify the visual examination method in accordance with IWA-2213 and qualification of the inspectors, along with several other editorial changes that improve clarity.
Visual examinations of snubbers will be performed by individuals specifically qualified for snubber inspection in accordance with DCPP procedures, consistent with the applicable requirements of ASME OM Code, Subsection ISTA-1500, Paragraph (e), 2001 Edition with 2003 Addenda. The attributes of the VT-3 method as described in IWA-2213 are fully implemented in the snubber program procedures. However, the term "VT-3" has been removed from our snubber program implementing procedures, because this qualification is not a requirement of the ASME OM Code.
There are no new or revised regulatory commitments as defined by the Nuclear Energy Institute 99-04, "Guidelines for Managing NRC Commitment Changes,"
dated July 1999, in this submittal.
If you have any questions regarding the information enclosed, or other Inservice Inspection Program for Snubbers, please contact Mr. Nozar Jahangir, Manager, Project Engineering, at (805) 545-6512.
A member of the STARS (StrategiC Teaming and Resource Sharing) Alliance Callaway
I I
I Document Control Desk
&~ February 28,2012 Page 2 PG&E Letter DCL-12-023 Sincerely,
~".tt~ -k-James R. Becker Site Vice President rnttl4231 I SAPN 50403209 Enclosure cc: Diablo Distribution cc/enc: Elmo E. Collins, NRC Region IV Michael S. Peck, NRC Senior Resident Joseph M. Sebrosky, NRR Project Manager Alan B. Wang, NRR Project Manager State of California, Pressure Vessel Unit A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
Enclosure PG&E Letter DCL-12-023 Diablo Canyon Power Plant Third Interval Snubber Program Revision 1
Enclosure PG&E Letter DCL-12-023 Diablo Canyon Power Plant Third Interval Snubber Program Revision 1 Unit 1 USNRC Docket: 50-275 Facility Operating License.: DPR..80 Commercial Operation Date: May 7) 1985 Third Interval Start Date: January 1, 2006 Unit 2 USNRC Docket: 50-323 Facility Operating License: DP~";82 Commercial Operation Date: March 13, 19.86 Thlrd Interval Start Date: July 1,2006 Approval Record Prepared by; _ _ _ _ _-..... &.-~_
.._._~~.--r~=:::::::-_ _ !_.z.;_'1~YI:. . .=z.
.....!.f independent Technical Review: '~"""",.c. /-31-1 z-Approved by: .....Ja~_----=---..........===.~f5~'----:;-._Z_-_b_~---\-"'...:=.-----'---
Enclosure PG&E Letter DCL-12-023 Third Interval Snubber Program (Revision 1)
Diablo Canyon Power Plant
1.0 General
1.1 In order to ensure the required operability of all safety related snubbers for both Units 1 and 2 during a seismic or other event, initiating dynamic loads, the inspection and testing of these snubbers shall be implemented and performed in accordance with the requirements of Equipment Control Guideline (ECG) 99.1, "Snubbers."
1.2 The Snubber Program, as defined within ECG 99.1, establishes visual examination, functional testing and service life monitoring requirements, pertaining to mechanical and hydraulic safety related snubbers.
1.3 The examination boundaries shall include the snubber assembly from pin to pin inclusive. The lSI program owner will be required to complete the surveillance requirements for piping and structural attachments in accordance with appropriate Section XI requirements.
1.4 The Snubber Program described in ECG 99.1 adheres to the requirements of the ASME OM Code, Subsection ISTA and ISTD, 2001 Edition with 2003 addenda, as allowed by 10CFR50.55a(b)(3)(v) in lieu of ASME Section XI, IWF-5200(a) and (b) and IWF-5300(a) and (b).
1.5 Surveillance Test Procedure, STP M-78B, in conjunction with ECG 99.1 includes a snubber service life monitoring program for hydraulic and mechanical snubbers that adheres to the requirements of ISTD-6000.
2.0 Examination, Testing and Service Life Monitoring Requirements:
2.1 Visual examinations and functional testing shall be performed to the extent specified within ECG 99.1.
2.2 Snubbers are grouped into DTPG's by design type, in accordance with ISTD-5252 for testing purposes. The groups at DCPP are as listed below:
Snubber Design Unit 1 Unit 2 Type DTPG Includes DTPG Includes AD40, AD70, AD40, AD70, AS AS AD151 AD151 Anchor Darling AM AD500 AM AD500 AD1600, AD 5500, AD1600, AD AL AL AD12500 5500, AD12500 1
Enclosure PG&E Letter DCL-12-023 Snubber Design Unit 1 Unit 2 Type DTPG Includes DTPG Includes PS 1/4NF, 1/2NF PS 1/4NF, 1/2NF Basic PSA PM 1NF, 3NF, 10NF PM 1NF, 3NF, 10NF PL 35NF,100NF PL 35NF,100NF Paul Munroe M 20x3 LG Bore M 20x3 LG Bore Grinnell G All Sizes G All Sizes Anvil A All Sizes A All Sizes 2.3 The service life of all snubbers shall be monitored and snubbers replaced or reconditioned as required to ensure that the service life is not exceeded between surveillance inspections, during a period when the snubber is required to be operable. The replacement or reconditioning shall be documented and records retained in accordance with DCPP Procedures.
3.0 Examination and Testing Methods:
3.1 Visual examinations shall be performed by individuals qualified in accordance with DCPP procedures. These examinations are conducted in accordance with the attributes as described in IWA-2213 to determine the mechanical and structural condition of the snubber support location and to observe conditions that could affect functional adequacy. Visual examinations and functional testing shall be performed to verify the requirements specified within ECG 99.1 are met in accordance with Subsection ISTD.
4.0 Examination and Testing Frequency:
4.1 Visual examinations and functional testing shall be performed at the frequency specified within ECG 99.1. DCPP currently performs accessible and inaccessible snubber visual examinations during separate refueling outages, which results in approximately one half of the snubber population being examined during each examination campaign.
4.2 Post installation checklists shall be completed whenever new snubbers are installed, reinstallation of existing or swapped snubbers that were functionally tested, or after repairs, replacements or modifications.
4.3 Functional testing requirements for new installations or spares shall be equal to or more stringent than that specified within ECG SR 99.1.
5.0 ASME OM Code Case, OMN-13 5.1 Code Case OMN-13, which allows the extension of the visual examination 2
Enclosure PG&E Letter DCL-12-023 interval, has been implemented for snubber inspections during this interval.
Code Case OMN-13 is approved for use by the NRC in Regulatory Guide 1.192 (June 2003).
5.2 DCPP will continue to perform accessible and inaccessible snubber visual examinations separately, which results in approximately one half of the snubber population for each Unit being examined during a campaign.
However, the interval will be extended as allowed by Code Case OMN-13 for each group, accessible and inaccessible.
6.0 Examination, Testing and Service Life Monitoring Evaluation:
6.1 Snubbers that do not appear to conform to the visual examination requirements of ECG 99.1, shall be reported for evaluation and appropriate corrective action.
6.2 Snubbers that do not appear to conform to the visual examination acceptance requirements and are later confirmed as operable as a result of functional testing may be declared operable for the purpose of establishing the next visual inspection interval, providing that the unacceptable condition did not affect operational readiness.
6.3 Snubbers that do not meet the operability testing acceptance criteria in ECG 99.1 shall be evaluated to determine the cause of the failure and appropriate corrective action taken.
6.4 The service life of a snubber is evaluated using manufacturing input and engineering information gained through consideration of the snubber service conditions and inservice functional test results. A service life monitoring program is included in ECG 99.1 and Surveillance Test Procedure STP M-78B.
7.0 Repair, Replacement and Modification Requirements:
7.1 Repairs, Replacements and Modifications performed on snubbers under this program shall conform, as applicable, to the requirements specified within the ASME Code,Section XI.
8.0 Scheduling
8.1 The visual examinations and functional testing schedules shall be established, tracked and maintained within the DCPP Project Engineering Department.
8.2 The Snubber Program Owner shall identify and track expanded or additional 3
Enclosure PG&E Letter DCL-12-023 testing and/or examinations as required by ECG 99.1 and Subsection ISTD.
9.0 Reports and Records:
9.1 Reports and records for snubber visual examinations and functional testing shall be maintained for all snubbers included within the Snubber Program.
9.2 Applicable records and reports, as required for repair and replacements, shall be maintained for snubbers.
9.3 Records of the service life of all hydraulic and mechanical snubbers listed in this program, including the date at which the service life commences or expires, and associated installation and maintenance records will be maintained.
4