S LOUISIANA 242 ounoNoe sineer POWER & LIGHT P o Box 6008 = NEW onLEANS. LoulSIANA 70174. (504) 366-2345
===sW April 5, 1984 W3K84-0813 Q-3-A35.07.97 Mr. John T. Collins Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012
REFERENCE:
LP&L letter W3K84-0432 dated March 1, 1984
Dear Mr. Collins:
&mc ~_--
i
$0
,[h
SUBJECT:
Waterford SES Unit No. 3 y
APR I 3 m ln Docket No. 50-382 Significant Construction Deficiency No. 97
" Diesel Generator "B" Turbocharger Failure" 2./g y
Third Interim Report The above referenced letter indicated submittal of the Final Report to the USNRC on April 6, 1984.
At the present time, corrective action and the documentation review is scheduled to be completed in mid April, 1984. The Final-Report will be submitted to the USNRC on April 27, 1984.
Very truly yours, T. F. Gerrets Corporate Quality Assurance Manager TFG:CNH:VBR cc: Director-Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C.
20555 8404190309 840405 PDR ADOCK 05000
_S e
LE-27 3
.a
a Mr. John T. Collins April 5, 1984 W3K84-0813 Page 2 cc: Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.
20555 Mr. E. L. Blake Shaw, Pittman, Potts & Trowbridge 1800 M Street, N.W.
Washington, D.C.
-20036 Mr. W. M. Stevenson Monroe & Lemann 1424 Whitney Building New Orleans, Louisiana 70130 Recor's Center d
Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 Mr. W. A. Cross 7910 Woodmont Avenue Suite 1200 Bethasda, Maryland 20814 a:
- L
.-