Third Interim Significant Const Deficiency Rept Re Switchgear Breaker Position Switch Operator.Corrective Action Not Completed.Final Rept by 820131
ML20039G584
Person / Time
Site: Waterford Entergy icon.png
Issue date: 01/05/1982
From: Mclendon G
ARKANSAS POWER & LIGHT CO., LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, W3K81-0480, W3K81-480, NUDOCS 8201180461
Download: ML20039G584 (1)


Text

r I 0UISIANA f 342 onanoNoE S1nur P O W E F1 & L I G H T / P O BOX 6008

  • NEW CRLEANS. LOutSIANA 70174
  • 1504) 366 2345

'$E0N5'YSYE U

January 5, 1982 G D. McLENDON Senior Vice President W3K81-0480 Q-3-A35.07.27 e

  • A 6

Mr. John T. Collins , Regional Administrator, Region IV gg B U. S. Nuclear Regulatory Commission -

611 Ryan Plaza Drive, Suite 1000 f; gygg 7 Arlington, Texas 76012 s It mm mauw enamas

% 8EaEE umuts u

SUBJECT:

Waterford SES Unit No. 3 710c p Docket No. 50-382 Third Interim Report Significant Construction Deficien 6 "Switchgear Breaker Position Switch Operator Defect"

REFERENCE:

Interim Report W3K81-0312 dated 8/31/81

Dear Mr. Collins:

In the referenced interim report, LP&L committed to submit a final report on Significant Construction Deficiency No. 27 by December 31, 1981.

Work is in progress, but corrective action has not been completed.

A final report on this item will be submitted by January 31, 1982.

If there are any questions, please let us know.

Very truly yours,

. & Rt';L GDMcL:WMM:ncd

1) Director Of fice of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555
2) Director Of fice of Management g Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C. 20555 p

S de 8201180461 820105 PDR ADOCK 05000382 PDR S