r I 0UISIANA f 342 onanoNoE S1nur P O W E F1 & L I G H T / P O BOX 6008
- NEW CRLEANS. LOutSIANA 70174
- 1504) 366 2345
'$E0N5'YSYE U
January 5, 1982 G D. McLENDON Senior Vice President W3K81-0480 Q-3-A35.07.27 e
A 6
Mr. John T. Collins, Regional Administrator, Region IV gg B
U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 f;
gygg 7
Arlington, Texas 76012 s
It mm mauw enamas 8EaEE umuts u
SUBJECT:
Waterford SES Unit No. 3 710c p
Docket No. 50-382 Third Interim Report Significant Construction Deficien 6
"Switchgear Breaker Position Switch Operator Defect"
REFERENCE:
Interim Report W3K81-0312 dated 8/31/81
Dear Mr. Collins:
In the referenced interim report, LP&L committed to submit a final report on Significant Construction Deficiency No. 27 by December 31, 1981.
Work is in progress, but corrective action has not been completed.
A final report on this item will be submitted by January 31, 1982.
If there are any questions, please let us know.
Very truly yours,
. & Rt';L GDMcL:WMM:ncd
- 1) Director Of fice of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555
- 2) Director Of fice of Management g
Information and Program Control U. S. Nuclear Regulatory Commission p
Washington, D. C. 20555 S de 8201180461 820105 PDR ADOCK 05000382 S