Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Surveillance Requirement for ASME Section Xi Pumps". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML19224B617  + (Surveillance Procedure Exception & Deficiency List Taken 790311 & Completed &/Or Justified 790327)
  • 05000366/LER-1979-088-03, Surveillance Procedure HNP-2-3353E Not Completed Due to Failure of Charcoal Filter Deluge Sys to Operate Automatically.Caused by Water Pressure Fluctuations.Water Supplies Changed  + (Surveillance Procedure HNP-2-3353E Not Completed Due to Failure of Charcoal Filter Deluge Sys to Operate Automatically.Caused by Water Pressure Fluctuations.Water Supplies Changed)
  • 05000498/FIN-2007007-04  + (Surveillance Procedure Lacked Check for Timing of Chiller Loading on the Bus)
  • 05000456/FIN-2012007-02  + (Surveillance Procedure Not Followed)
  • ML19210D085  + (Surveillance Procedure SP-412,Revision 2, ECCS & Containment Spray Sys Leak Rate Test)
  • ML19210D089  + (Surveillance Procedure SP-429,Revision 0, Waste Gas Sys Leak Rate Test)
  • ML19319D232  + (Surveillance Procedure SP-434,Revision 2, Fuel Storage Pool Missile Shields)
  • ML102730401  + (Surveillance Procedure SP-47-011B, Revision 17, Reactor Coolant Temperature and Pressurizer Pressure Instrument Channel 2 (White) Calibration)
  • ML19319D222  + (Surveillance Procedure SP-530, Demonstration of Auxiliary Bldg Overhead Crane (FHCR-5) Interlock Operability)
  • ML19319D223  + (Surveillance Procedure SP-531,Revision 2, Spent Fuel Handling Bridge Interlock Surveillance)
  • ML19319D227  + (Surveillance Procedure SP-532,Revision 3, Reactor Bldg Main & Auxiliary (FHCR-1 & FHCR-2) Fuel Handling Bridges Electrical Interlock Surveillance)
  • ML19319D238  + (Surveillance Procedure SP-601,Revision 4, Procedure for Load Testing Slings & Lifting Fixtures)
  • ML19319D240  + (Surveillance Procedure SP-670,Revison 3, Reactor Bldg Fuel Handling Bridges (FHCR-1 & 2) Load Test)
  • ML19319D173  + (Surveillance Procedure SP-671,Revision 4, Spent Fuel Handling Bridge Load Surveillance)
  • ML19319D171  + (Surveillance Procedure SP-672,Revision 2, Procedure for Load Testing New Fuel Elevator)
  • ML19309A643  + (Surveillance Procedure Sp 205.05 Entitled, Liner Plate Surveillance-Reactor Bldg)
  • ML18046B081  + (Surveillance Procedure for Containment Bldg Post-Tensioning Sys)
  • ML20062G323  + (Surveillance Procedure,06-OP-1P41-M-003, Standby Svc Water Loop B Functional Test,Safety-Related, Revision 11)
  • ML19224B414  + (Surveillance Procedures 239-244 Not Required Because No Filter Changeout Occurred Prior to 790328)
  • ML18081A820  + (Surveillance Procedures SP(O)4.7.1.2a & B,Revision 3,for Auxiliary Feedwater Sys)
  • ML20236V211  + (Surveillance Program Testing Methodology)
  • ML052000328  + (Surveillance Program for Channel-Control Blade Interference)
  • Regulatory Guide 1.119  + (Surveillance Program for New Fuel Assembly Designs)
  • ML20082Q204  + (Surveillance Rept SOS-108-91, Licensed Operator Requalification Program)
  • ML20136C677  + (Surveillance Rept of RCS Valve RC-RV-2 from Mechanical Maint Dept.Work Requests Encl)
  • TSTF-078  + (Surveillance Requirement for ASME Section Xi Pumps)