Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19224B617 + (Surveillance Procedure Exception & Deficiency List Taken 790311 & Completed &/Or Justified 790327)
- 05000366/LER-1979-088-03, Surveillance Procedure HNP-2-3353E Not Completed Due to Failure of Charcoal Filter Deluge Sys to Operate Automatically.Caused by Water Pressure Fluctuations.Water Supplies Changed + (Surveillance Procedure HNP-2-3353E Not Completed Due to Failure of Charcoal Filter Deluge Sys to Operate Automatically.Caused by Water Pressure Fluctuations.Water Supplies Changed)
- 05000498/FIN-2007007-04 + (Surveillance Procedure Lacked Check for Timing of Chiller Loading on the Bus)
- 05000456/FIN-2012007-02 + (Surveillance Procedure Not Followed)
- ML19210D085 + (Surveillance Procedure SP-412,Revision 2, ECCS & Containment Spray Sys Leak Rate Test)
- ML19210D089 + (Surveillance Procedure SP-429,Revision 0, Waste Gas Sys Leak Rate Test)
- ML19319D232 + (Surveillance Procedure SP-434,Revision 2, Fuel Storage Pool Missile Shields)
- ML102730401 + (Surveillance Procedure SP-47-011B, Revision 17, Reactor Coolant Temperature and Pressurizer Pressure Instrument Channel 2 (White) Calibration)
- ML19319D222 + (Surveillance Procedure SP-530, Demonstration of Auxiliary Bldg Overhead Crane (FHCR-5) Interlock Operability)
- ML19319D223 + (Surveillance Procedure SP-531,Revision 2, Spent Fuel Handling Bridge Interlock Surveillance)
- ML19319D227 + (Surveillance Procedure SP-532,Revision 3, Reactor Bldg Main & Auxiliary (FHCR-1 & FHCR-2) Fuel Handling Bridges Electrical Interlock Surveillance)
- ML19319D238 + (Surveillance Procedure SP-601,Revision 4, Procedure for Load Testing Slings & Lifting Fixtures)
- ML19319D240 + (Surveillance Procedure SP-670,Revison 3, Reactor Bldg Fuel Handling Bridges (FHCR-1 & 2) Load Test)
- ML19319D173 + (Surveillance Procedure SP-671,Revision 4, Spent Fuel Handling Bridge Load Surveillance)
- ML19319D171 + (Surveillance Procedure SP-672,Revision 2, Procedure for Load Testing New Fuel Elevator)
- ML19309A643 + (Surveillance Procedure Sp 205.05 Entitled, Liner Plate Surveillance-Reactor Bldg)
- ML18046B081 + (Surveillance Procedure for Containment Bldg Post-Tensioning Sys)
- ML20062G323 + (Surveillance Procedure,06-OP-1P41-M-003, Standby Svc Water Loop B Functional Test,Safety-Related, Revision 11)
- ML19224B414 + (Surveillance Procedures 239-244 Not Required Because No Filter Changeout Occurred Prior to 790328)
- ML18081A820 + (Surveillance Procedures SP(O)4.7.1.2a & B,Revision 3,for Auxiliary Feedwater Sys)
- ML20236V211 + (Surveillance Program Testing Methodology)
- ML052000328 + (Surveillance Program for Channel-Control Blade Interference)
- Regulatory Guide 1.119 + (Surveillance Program for New Fuel Assembly Designs)
- ML20082Q204 + (Surveillance Rept SOS-108-91, Licensed Operator Requalification Program)
- ML20136C677 + (Surveillance Rept of RCS Valve RC-RV-2 from Mechanical Maint Dept.Work Requests Encl)
- ML20077M121 + (Surveillance Requirements & Limiting Conditions for Operation Re RCS Leakage)
- ML19309B109 + (Surveillance Requirements Review for Primary Coolant Sys Helium Circulators, Revision 1)
- ML19309B111 + (Surveillance Requirements Review for Secondary Coolant Sys, Revision 1)
- ML17299A352 + (Surveillance Requirements for Emergency Diesel Fuel Oil Sys in Nuclear Power Plants)
- ML20082L857 + (Surveillance Requirements for Emergency Diesel Fuel Oil Sys in Nuclear Power Plants, Prepared for Snupps)
- 05000324/LER-1982-052-03, Surveillance Revealed Makeup Demineralized Water Tank Inventory Below Stds.Caused by Isolated Fire Protection Water Tank Makeup Supply Due to Planned Maint.Makeup to Tank Restored + (Surveillance Revealed Makeup Demineralized Water Tank Inventory Below Stds.Caused by Isolated Fire Protection Water Tank Makeup Supply Due to Planned Maint.Makeup to Tank Restored)
- 05000260/LER-2078-001, Surveillance Samples Were Taken from Charcoal in Unit 2 Primary Containment Purge System Following Maintenance Outage + (Surveillance Samples Were Taken from Charcoal in Unit 2 Primary Containment Purge System Following Maintenance Outage)
- ML20108D086 + (Surveillance Specimen Program Evaluation for Grand Gulf Nuclear Station)
- B130180, Surveillance Specimen Program Evaluation for River Bend Station + (Surveillance Specimen Program Evaluation for River Bend Station)
- ML20234E258 + (Surveillance Summary Rept of Bodega Bay,Ca Area)
- ML19249C687 + (Surveillance Task Index for TMI-1)
- 05000334/LER-2009-001, Surveillance Test Inadvertently Violates Technical Specification 3.6.1 for Containment Operability + (Surveillance Test Inadvertently Violates Technical Specification 3.6.1 for Containment Operability)
- 05000321/LER-1981-109-03, Surveillance Test Indicated HPCI Steam Line Pressure Switches N001A & N001D Actuated at 103 & 105 Psig,Respectively,Contrary to Tech Specs.Caused by Setpoint Drift.Barksdale Switches Recalibr + (Surveillance Test Indicated HPCI Steam Line Pressure Switches N001A & N001D Actuated at 103 & 105 Psig,Respectively,Contrary to Tech Specs.Caused by Setpoint Drift.Barksdale Switches Recalibr)
- TSTF-411 + (Surveillance Test Interval Extensions for Components of the Reactor Protection System - WCAP-15376-P)
- 05000324/FIN-2009004-03 + (Surveillance Test Performed on Incorrect Loop of RHR)
- 05000331/FIN-2010004-01 + (Surveillance Test Procedure did not Include Appropriate Acceptance Criteria)
- 05000333/LER-1980-046-03, Surveillance Testing Revealed Shutdown Cooling Permissive Switches Set in Excess of 75 Psig Limit.Caused by Procedural Error.Instruments Recalibr & Returned to Svc + (Surveillance Testing Revealed Shutdown Cooling Permissive Switches Set in Excess of 75 Psig Limit.Caused by Procedural Error.Instruments Recalibr & Returned to Svc)
- ML19254B014 + (Surveillance Testing of Communications Equipment Radiological Ref 55)
- 05000461/FIN-2011003-03 + (Surveillance Testing of Control Room Ventilation System)
- Information Notice 1989-32, Surveillance Testing of Low-Temperature Overpressure-Protection Systems + (Surveillance Testing of Low-Temperature Overpressure-Protection Systems)
- ML20054C463 + (Surveillance of Containment Structure Interior & Exterior Surfaces)
- ML19209B675 + (Surveillance of Feedwater Pump Turbines Required by Tech Specs,As of 790609)
- ML19221A184 + (Surveillances Required by Tech Specs Being Performed as of 790328)
- ML19221A188 + (Surveillances Required by Tech Specs Not Being Performed as of 790328)
- ENS 55379 + (Surveillence Frequency Exceeded for Ice Condenser Temperature)