i

$ l * !. O

.h e o

Document Sectl0n N FORM ATION ONL N C. R. Nuclear SURVEILLANCE PROCEDURE SP-530 FLORIDA PC'4ER CORPORATION CRYSTAL RIVER UNIT 3 DEMONSTRATION OF AUXILIARY SUILDING OVERHEAD CRANE (FHCR-5)

INTERLOCK OPERABILITY Decket #4JC2 9

9 7.'u!077236 0//7 P:?:_f/5/_2fff 2GBfit:

.y0":l.~C.Y U :5T 71E REVIE'a D 3Y:

Plant Review Co=nittee fu h W.L hA.

r

/!b!)b Date Meeting No.

hd"!

APPROVED BY:

Nuclear Plant Superintendent 8003ISON

/ /;22 /7[

,/.

Date g

...d 1.0 SURVEILLANCE REQUIREMENTS Interlocks which normally prevent the auxiliary building over-head crane (TECR-5) from traveling over the fuel assembly storage portion of spent fuel pool "P" shall be demonstrated OPERA 3LE.

This demonstration shall be performed during the modes and at the frequencies. indicated below.

1.1 Technical Specification Reference i

Technical Qurv.. Req 'd Modes Surv.

Freq.

Specification During Modes Notes Freq.

Notes 4.9.7.l' 1,2,3,4,5,6 41,42 W

40 Surveillance Frequency Designation:

0 W-Weekly Modes Notes:

41-Fuel Assemblies in Spent Fuel Pool 42-Spent Fuel Overhead Crane (FHCR-5) in Use Frequency Notes:

40-Establish Surveillance' Prior to Ascending into Applicable Mode (Prior to placing crane in service with Fuel in Storage Pool) 2.0 ACCEPTANCE CRITERIA 2.1 The crane travel interlocks have successfully stopped any motion of the Auxiliary Building Spent Fuel Crane (FHCR-5) which would have caused its hoist hooks to be positioned over any part of spent fuel pool "B" (excluding the cask pit).

NOTE:

If the above Acceptance Criteria cannot be met, refer to the " Action Statement" of 3.9.7 of the Technical Specifications.

Page l' SP-530 Date 1/6/76-

,b,'i

3.0 REFERENCES

NEEDED TO DO PROCEDURE 3.1

- Enclosure 1, Crane Orientations and Directions 3.2 Data. Sheet I (Enclosure 2) 3.3 FP-601, Fuel Handling Equipment Operations 4.0 SPECIAL CONDITIONS OR REQUIRE}!ENTS 4.1 This demonstration of interlock operation shall be perfomed with NO crane load.

4.2 If bri,dge or trolley is stopped by limit switch action, it vill be necessary to reverse whatever motion was responsible by depressing the appropriate reversal push button.

4.3 Ihe "NCN-RESTRICTED" push button overrides limit switches and while depressed allows entry into the restricted area.

5. 0 '

EQUIPMENT REQUIRED None 6.0 PROCEDURE 6.1 Start up the overhead crane (FHCR-5) in accordance with FP-601, Fuel Handling Equipment Operations.

-6.2.

With the crane well away (south) of the southern wall of spent fuel pool "B", operate the bridge, trolley, and hoist controls to verify that.they are operating nomally.

6.3

. Perform the following steps to demonstrate the operation of 1

the crane's interlocks.

Refer to Enclosure 1 for orientation and directions.

6.3.1-Run the trolley forward and position it approximately 2 ft.

from the west end stops.

Page 2.

SP-530 Date 1/6/76-

..,e,

1

-w..-

.,.. _ ~

4 y

6.3.2 Depress the " BRIDGE FORWARD" push button and run the bridge north at fast speed until it is stopped by the actuation of a limit switch (LS-2). Verify that the main hoist hook centerline is not over the spent fuel pool storage rack and document this on Data Sheet I.

.6.3.3 Depress the " TROLLEY FORWARD" push button. Verify the trolley

. does not mo e forward.

6.3.4-Depress the " TROLLEY REVERSE" push button. Verify that the trol' ley moves in re. verse.

6.3.5 Continue moving the trolley in reverse and position it approxi-mately 2 ft. from the trolley east end stops.

6.3.6 Depress the " BRIDGE, REVERSE" push button and verify the bridge will move in reverse.

6.3.7 Depress the " BRIDGE FORWARD" push button and move the bridge forward until it is stopped by the actuation of a limit switch (LS-1); document this on Data Sheet I.

6.3.8 Depress the " TROLLEY FORWARD" push button and move the trolley forward until it is stopped by the actuation of a limit switch (LS-3).

Lower the main hoist hook as necessary to verify that it is over the spent fuel cask storage pit; document this on Data Sheet I.

CAUTION:

Care should be exercised to insure that the hook does not come in contact with the water in the cask storage pit.

6.3.9 Return the hook to its storage position.

Page 3 SP-530 Date 1/6/76-

6.3.10 Depress and maintain depressed the "NON-RESTRICTED" push button.

Move the bridge forward to approximately 2 ft. from the north end stops, then move the trolley forward until it has passed the west wall of the cask storage pit.

Release the "NON-RESTRICTED" push button.

,6.3.11 Return the trolley to the cab side of the bridge, then return the bridge to its normal storage area or the desired work area.

6.4 There is no restoration required.

6.5.

Notify the Shift Supervisor of the completion and results of this Surveillance Procedure.

]

Page 4 SP-530 Date 1/6/76

ENCLOSURE 1

~

I e s

~I;'U,)\\.'k\\'\\\\\\ (\\.) h.\\x h

\\(N

'\\\\\\

-Qi;\\.y\\\\ \\\\\\\\\\'N\\\\\\\\y\\\\\\\\11 s\\ \\

dA

\\

\\

\\ \\\\\\\\

\\',

\\ s \\

'\\

Sl'l::Tr FUEL

', \\.Il I.?s'f \\ U '.L

\\k \\

'1,d!.'\\, \\

\\\\\\s.y' O \\ \\ ' -\\

\\.,'g'\\ \\\\YL POOL "A" g\\

, ys \\\\

\\

s

,.. s s

' \\ \\ 'kY '\\\\. \\\\.

.,. '. N i

t LS-1

\\

i CASK

't s-

-\\

s \\g \\

g.

s li, i 's

.., \\

PJT e

\\.,~

\\

3..\\.'..'. '.\\ \\..\\. \\.\\'.\\ \\,,

l-

.Ll

<- s-I LS-2 +

+ LS-3

,.2 TROLLTY FORIUJ1D DIRECTIO:s*

p 3

-t 3

<3 H

5v

.g 15RIDGC TORT.'.'aD DI'.;ECTIO::

1 e

l I

)'

1 i

)

CR.\\NK liR11)Gl' T::.\\C*;S

\\\\\\

1::i)LC.\\Ti.S 1.F.STi:1CTE0 i:U:A Cl'w'st:l'. l'i.11::.T.',Titi;; A::n 1111'.!:t"c:.:s Page 5 SP-530 Date 1/6/76

ENCLOSURE 2 DATA SHEET I AUXILIARY BUILDEO OVERHEAD CRANE (E"dCR-5)

INTERLOCK DEMONSTRATION TEST EQUIPMEST $0.

NONE PROCEDURE 1CTION INITIALS /DATE STEP 6.3.2 The crane is stopped (by LS-2) with its hooks not over the spent fuel pool storage racks.

/

6.3.7-The crane is stopped (by LS-1) with its hooks not over the spent fuel pool storage racks

/

6.3.8 The crane is stopped (by LS-3) with its hooks not over the spent fuel pool storage racks

/

COMMENTS:

PERFORMED BY:

DATE:

Page 6 SP-530 Date 1/6/76