SURVEILLANCE OF CONTAINMENT STRUCTURE INTERIOR AND EXTERIOR SURFACES 1.0 PURPOSE
.1 To provide guidelines for an annual visual examination of the containment structure's accessible interior and exterior surfaces.
.2 To provide guidelines for a visual inspection of the containment structure's accessible interior and exterior surfaces prior to any integrated leak test.
.3 To determine at the frequency specified in 1.1 and 1.2 if there is any evidence of deterioration which may affect either the containment structural integrity or leak-tightness.
2.0 REFERENCES
.1 Rancho Seco Unit 1, Technical Specifications, Section 4.4.1.4.
.2 Surveillance Standard AP 205.04.
--.)
'~
.3 Rancho Seco Unit 1, Structural Integrity Test STP-006.
.4 Deleted.
.5 Report on Inward Bulges of Containment Liner Plate At Rancho Seco Nuclear Generating Station by Bechtel Corporation, dated i
June 6, 1972.
~
3.0 LIMITS AND PRECAUTIONS
.1 This inspection should nor= ally be scheduled during an outage or refueling shutdown to minimize the need of sending an inspector into the containment during reactor operation.
.2 The discovery of any significant deterioration shall be accompanied by corrective action in accordance with acceptable procedures. Any 1
corrective action shall be reported as part of the. test results.
4.0 PROCEDURE
.1 Visual Examination of the containment structure's accessible l1 exterior surfaces.
s SP 205.04-1 Rev. 1 8204210125 820324 DR ADOCK 05000312 PDH w-
- +-
g
,,e-
e--
y--_-
-.--rw
A
]
m 4.0 PROCEDURE (Continued)
.3 Any indications of strain concentration shall be shown on a sketch of the area where present.
.4 The areas to be inspected are outlined and nunbered on
,.1 and are as follows:
.1 Area 1 - Grade level - area surrounding the equipment hatch.
.2 Area 2 - Grade level - area surrounding the emergency hatch.
.3 Area 3 - Grade level - area in the vicinity of the A Main Steam Line.
.4 Area 4 - Grade level - area in the vicinity of the B Main Steam Line.
'5 Area 5 - Grade level - area in the vicinity of the electrical penetrations.
.6 Area 6 - +20 ft. level - area in the vicinity of purge inlet and outlet and electrical penetrations.
.7 Area 7 - +20 ft. level - area in the vicinity
N of electrical penetrations.
.s
~
.8 Area 8 - +40 ft. level - area in the vicinity of the personnel hatch.
.9 Area 9 - +40 ft. level - area in the vicinity of the plant exhaust.
.10 Area 10 - -20 ft. level - mechanical penetration area in West Decay Heat Cooler Room.
(Particular attention should be glven to area surrounding penetration 48).
.11 Area 11 - -20 ft level - mechanical penetration area in East Decay Heat Cooler Room.
.12 Area' 12 - -37 ft level - area in vicinity of Rx Building E=ergency Sump Line to B Decay-Heat Pump Suction.
.13 Area 13 - -37 ft. level - area in vicinity of Rx Building Emergency Sump Line to A Decay Heat Pump Suction.
.5 All observations and results shall be recorded on.3.
.2 Visual Examination of containment structure's accessible interior l1 surfaces.
.1 General Visual Examination of Interior Surfaces.
SP 205.04-3 Rev. 1
q l
s.j o
4.0 PROCEDURE (Continued)
.1 This section of the inspection shall consist of a walk around the interior of the reactor building at all accessible levels.
.2 In addition to the specific areas to be inspected in Section 4.2.2.'particular attention should be given to-
.'......ar.e.as whe're ' penetrations 'are loc'aEe'd.
~
fall
.3 Using binoculars visually inspect the interior surface of the dome.
P' articular attentioli 'shsuld be given 'to th6Wid!OhYrY'YhEsEny headers 'and upp[e'r' domey ' #
ciY$iWitii E Ee~ fist'dnid Q ~
~"
.... + - -
.4 Anyevidenceofvisuallinerplatedeformation, corrosion,Y or any other development which might affect the struc-
'i tural integrity of the containment building shall be noted on Enclosure 6.4.
.2 Visual Examination of specific areas for indication of strain concentrations.
.1 Re=ove any grease or foreign material from the area to be examined.
.2 "Dite'iiiiiie if"hnf'EtidEnce?of stiain'cAnie'n'trdiloiis"are 7
~
~
ffe's'e~nF(Ce'?!d'tiMn~cE6Eent'Fitl'o'ds'Glil' B'e'"inlicat edf g'IAEd.~.difniEEiEd".. IIii'e'r~c~ribTiflig~diiir.p6d'dibip' faints
~ -.. -
_ ~... ~ - -- - - --.--
g
.3 Any indication of strain concentration shall be shown on a sketch of the area where present.
.4[s The areas for strain concentration-inspection are located a
where discontinuities occur and are as follows:
s
- \\
.1 3 ft. above and below the horizontal center line 1
extending 10 ft. east of the east edge of the J
personnel lock.
y>----
m "T
.2 2 ft. radius around electrical. penetration No. 7.
W
}
. _p
.3 Upper half of mechanical penetration No. 40 (main j
steam extending from edge of penetration to 6 ft.
j out from edge).
'i i
.4 2 ft. radius about mechanical penetration No. 20 (HP Injection).
.5 All observations and results shall be recorded on.5.
SP 205.04-4 p,ev. 1
)
5.0 ACCEPTANCE CRITERIA j
.1 Enclosures 6.2, 6.3, 6.4, and 6.5 are completed in their entirety.
.2 Any abnormal conditions noted which may either affect the contain-ment's structural integrity or leak-tightness shall be accompanied i
by corrective actions in accordance with approved procedures. Any corrective action shall be reported as part of the test results.
.3 Any,,ske t,ch_es ieqdif sd* By;Sfction;4 Q. 2 4dnd 32. 2. 3,,sha).1 b,e, don,e k paper and ' attached'tb' Enc 1'o~sures 6.37 6.0 ENCLOSURES
.1 Specific Areas of Exterior Surfaces to be Inspected.
.2 Results of General Visual Inspection of Exterior Surfaces.
.3 Results of Specific Area Inspection of Exterior Surfaces.
.4 Results of General Visual Inspection of Interior Surfaces.
.5 Results of Specific Area Inspection of Interior Surfaces.
. s,
)
l I
I l
SP 205.04-5 Rev. 1 I
I
~
ZNCLOSURE 6.1 SE"qFIC AREAS OF EXTERIOR SUPSACES.TO BE INSPECTED Page 1..of 5 g
(Areas 1 thr
}h5)
. ~
O O
t e
oM
~~
O c
R O
3 m
L.
(
b 9,
d l \\
^
e l
e f
N_
,y_
C
-A e
m J "1 2
O
=
_J.,
y
(
s //
o\\\\
c 5
i,
/
F3 C- -
s1 O
/
N O
,I
,i, -]
=
lY
~
- D o
a 1
a
(
Q j
~
0,/
j 9
N
/
q' 'O r
c J
- +
g' i-
~.x 1 "'n c
'Secass Loe 2
I i
T
-/"
4,]
t e
v v
=~
i W
a u
m-w
' =.
l n
}
,)
1 Q\\
sh
)._
t
~
ELEV. O Pr.
SP 205.04-6
q
'- )
Paga 2 of 5 ENCLOSURE 6.1 (Continued)
SPECIFIC AREAS OF EXTERIOR SURFACES TO BE INSPECTED (Areas 6 and 7) l e
3 1
)]w v
[J f
f1
~
/o O\\\\
I\\
'4[,t c
es rs o
i
)
1
_c--
t o
[] 1 g
of c
(T"uL i
o k
[h rJ U
t o
I
(
N 9"
h<
h
,a e
0 g
C
~h.F
]
l._m I
I I-I
_a L
D y
_t 0 0 N
i O
I 1
g g
t GII
,j
, __.)
L 16'
-l l
l l
l i
EEV. 20 Fr.
SP 205.04-6a
Page 3 of 5
.q ENCLOSURE 6.1 (Continued)
SPECIFIC AREAS OF EXTERIOR SURFACES TO BE INSPECTED (Areas 8 and 9) s x
x, j
af 5
l I
I L
_'I
(
J l
4
_ j
.=4 10 6 4
N\\
4/
o\\
.\\
~
1 9
3r O
=1-t r-e
-t_
o u
n L
O e
h-a O
l
\\-
iH
,m 'l g_ [o d
g T3 arl N
t l.
J -Q 0
I l
r w 's a
I I
a nR r
i g
7 sT) hu
.t i
J i
n a
a c.:,
i i
f l
l I
'l p
ELEV. /.0 FT.
SP 205.04-6b
Page 4 of 5
,7 ENCLOSURE 6.1 (Continued)
SPECIFIC AREAS OF EXTERIOR SURFACES TO BE INSPECTED (Areas 10 and 11) m r
m m
O O
5 W
b G
l x
v,V,v V,,V U
n n
a
~[""' Lc L
c t,
OO I
I F 7[
U_
l 1
lN!
J
(#
.J s-sf
/
o o
0 ai 5
m
+
/
oNN
\\
~ J o
5 f
\\
O o
00 O
o
'll
. qs o
r g
NN
//
x
(
3 0 3
+
6
/
carn o o
gr 5 E D'
I I
y --
=
DI O%J 0 lSNW NSAE % IL phov &
C t d Yt h MO 4y4 A& dd. ) *(of ELEV. -20 Pf.
SP 205.04-6c
TD Page 5 of 5 ENCLOSURE 6.1 (Continued)
SPECIFIC AREAS OF EXTERIOR SURFACES TO BE INSPECTED (Areas 12 and 13)
\\
m n
a
=;
l/
6
-C
'[
im * '= W y g g d
n i
i i
iv.-,...
EP a
gngc-gg 4 i.
%D k,h
. g:w$5)
/
g M
Pc b=s-jlA. iiiF 2
/
r re,,
M 9
1 a
=
,m
~h
-@=
e I
rIiF61irlij e
[~
' w_
)I l
(
Cl3 e
b s;
- c.:
4.J LJ s
_ Li LJ i
.g f
1 l
e SP 205.04-6d
(')
f^)
^
ENCLOSURE 6.2 RESULTS OF GENERAL VISUAL INSPECTION OF EXTERIOR SURFACES
.1 WALK AROUND INSPECTION
/
' Observations and Results C [Y s
U//-[I Inspector:
Date:
.2 REACTOR BUILDING DOME INSPECTION gg g,y Observations and Results @ N r(e K
// 3.f TLC L t=me f.e.6 C/mrg V/f?H g asg - Lects
&?ocao w it> &
ca Wa g-n2A-ren a
- sL S 8, dL L dem a.a C70/+M l127wf6f.!
h?m * *TCc r?;1rL c, dim?tJA.
G
~
~I N
@ na f.e!,,).
Inspector:
(4/
Date:.5'/[-N
~
TENDON ACCESS GALLERY INSPECTIOlN
/.
.3
~
3/ i U' ' ' r 1-Observations and Results d % /. % d,0 6. 6 ', d i.
a.
1 h 2
i P AAhlx b Y 3\\_2[2, f 9 I R. C E,>-i;, (~t,4,.
r; LLC 79 q~1 % ((,
- c e sumi.r reu
&_ O 8 C
6 C LOJ ? TJ cfd m ef G I6 C4Lch
~
t ~ ?c, c o c y.
CT4 C t4a:EO u g q,m { c c, ap, &g j fp y,?,' g.fr m ela Q q f f
/'
Inspector: Al W Date: 3 -//-[/
L
'~/
it
~
-....)"
Corrective Action if Required: dt75 U dem Zr5n IG p,
$m an &as h laed' emel 7 bas cle/5. ~as cc4%/.,nir<!
124.uct\\ 3 -t sc 2.
@ Mb aN w /b Ain L U U < c la>r j s > -7 l :!, 0 -4 2. d k m n G / L L & psesb [q.
-~.
/
'7.h A Technical Support Dare: 4-/e-C Reviewed by,
7 SP 205.04-7
m,s
'~
Page 1 of 3 ENCLOSURE 6.3 RESULTS OF SPECIFIC AREA INSPECTION OF EXTERIOR SURFACES
.1 AREA 1 - GRADE LEVEL - area surrounding the equipment hatch.
Observations and Results ML Inspector:
/4 Date: J-I/ -j/
-r g
.2 AREA 2 - GRADE LEVEL - area surrounding the emergency hatch.
Observations and Results c6b t dd der FM 78
//4&/[
S/A?aL Willld SsM.n.
Inspector:
/
Date: 3 -(/ -#[
j 1
.3 AREA 3 - GRADE LEVEL - area in the vicinity of the A Main Steam Line.
Observations and Results
- (M Inspector
- [
Date: 3 -//- /
{
.4 AREA 4 - GRADE LEVEL - area in the vicinity of B Main Steam Line.
-ck Observations and Results Inspector: [f/ N Date: 3 '//
v
.5 AREA 5 - GRADE LEVEL - area in the vicinity of the electrical penetrations.
Observations and Results g3 S~!!'
Inspector: /U Date:
SP 205.04-8
i
,7
]
Page 2 of 3 ENCLOSURE 6.3 (Continued) RESULTS OF SPECIFIC AREA INSPECTION OF EXTERIOR SURFACES
.6 AREA 6 - +20 FT. LEVEL - area in the vicinity of purge inlet and outlet and electrical penetrations.
Observations and Results Date:
3 "/[-((
Inspector:
[./.
1
.7 AREA 7 - +20 FT LEVEL - area in the vicinity of electrical penetrations.
Observations and Results WA droatJD GG( ( /L Cm 6 6llrCrPLat ( V D P TT=sf tDO A *TED ~~ ! bdL~ (EM /Y '
&l Il y 12Ab <
IN Rhr
$63*/
/
I!/" !
Inspector: 4/
Date:
.8 AREA 8 - +40 Fr. LEVEL - area in the vicinity of the personnel hatch.
Observations and Results 6r ar_
/7&ddl/dd D
6(h[d.
c fyrbh
&n M /Olh // 12 >< f l0 W/?ht SG32) i
/
/
~
Inspector:
(A/ /
Date: h //"((~
V
.9 AREA 9 - +40 FT. LEVEL - area in vicinity of the plant exhaust.
Observations and Results 6 [I i
.10 AREA 10 - -20 FT. LEVEL - mechanical penetration area in West Decay Heat Cooler Room.
Observations and Results h ( 6 JG
/,gfa g6et (2/3 j
f 4.< s nLod cAtt,cn 5
L) Ad / ED.
m a o l u d c d P 1,. x t,, i n.:. a OK v1ptv SG3??
Inspector:
6/
Date: 3 - /' 7/
SP 205.04-8a
1 s
Page 3 of 3 ENCLOSURE 6.3 (Continued) RESULTS OF SPECIFIC AREA INSPECTION OF EXTERIOR SURFACES
.11 AREA 11 - -20 FT. LEVEL - mechanical penetration area in East Decay Heat Cooler Room.
Observations and Results d
-(4(5 d th m
3 -(('/((
Inspector:
b)
Date:
y-
.12 AREA 12 - -37 FT. LEVEL - area in vicinity of Rx Building F;:tergency Sump Line to 3 Decay Heat Pump Suction.
Observations and Results db 3"//d/
Inspector:
4)W Date:
r I
.13 AREA 13 - -37 FT. LEVEL - area in vicinity of Rx Building Emergency Sump Line to A Decay Heat Pump Suction.
,[j)
Observations and Results Inspector:
Date: '3 "//-N Corrective Action if Required:
i Reviewed by Technical Support Date:
SP 205.04-8b
-n,.
^.
ENCLOSURE 6.4 RESULTS OF GENERAL VISUAL INSPECTION OF INTERIOR SURFACES
.1 WALK AROUND INSPECTION Observatiom and Results ALA 74 6 u %/dn-7A L L% AG cc,ws YAC,f hisn kb D.'.v0E.? A 2,4A W /,s f A6 /% e&^~ - 9/s A n.JerfA&d42, Q &
NCR kVR/YTc5N-COR V ATTACH '
Pfd[
Inspector:
k Date:
y./
.2 PENETRATION AREA INSPECTION Observatiom and Results (9[
~
Inspector: /J Af w Date: f [
.3 REACTOR BUILDING DOME INSPECTION m
Observations'and Results O
3 dY/
Inspector:
Date:
Corrective-Ac tion-if-Required-:
a u
- g Reviewed by /
Technical Support Date: */- / / - f/
SP 205.04-9
.q s
ENCLOSURE 6.5 RESULTS OF SPECIF17 AREA INSPECTION OF INTERIOR SURFACES
.1 3 ft. above and below the horizontal centerline extending 10 ft. east of the east edge of the personnel lock.
Observations and Results O Inspector: M Date:.3 8
.2 2 ft. radius around electrical penetration No. 7.
Observations and Results 8 k Date:.I 5 N Inspector:/v
.3 Upper half of mechanical penetration No. 40 (main steam) extending from edge of penetration to 6 f t.
out from edge.
Observations and Results 8 4)/f Date: 5 5 " S/
Inspector:
.4
'2 ft. radius about mechanical penetration No. 20 (HP injection)
Observations and Results O[<
)~ [
Inspector: h Date:
Corrective Action if Required:
Reviewed by/
M Technical Support Date: 4-//-F/
SP 205.04-10
O
.h-
.-.. -.__-.. //.._&f^m.
Y hf.h GA/7M'/ &
4'ec W + i b' ykcin--fL2
.40'YCC W., Svt DeNC W-.-..
02 CORRORION- /?EMCt&D eX__CL.EAlv/NG... ECN.329 & )2.9_?_
2 A?- &ab L,4 YPl;@?..Yt-
, /W)E t
2 $.-f. Y E bk..n.MMG-l?
y 1jY KM hs CORROSION _ RGM OVAL- !._PNN7'/N G f
ex rG a-
/N 9RQGREB-C ecN_3J9 2.
3J99 a
M / ( w'g
$WF
/
NC_R__WR[E'I'GNj-_CQ P_Y--bT_TACHSD Lf_
-/%_Y %
fA_f/' /
m,
/dWuck_.waaract;. coRY_AMCHED D7 nr JnY[ep;xshZb An.he w&-u
- > ~&' &
L6fRN.-_563.37 G
6m*
e w e mmh e-4 me-
=-
e.ee eh--.ew.
.gir p -
w..
4m.w-em-e. emes._
e
.e we ems.
.eemem
-ee_.i w.-
(
l
O RANCHO SECO NONCONFORMING REPORT NO.
S _)JJ K CUALITY CLASS T
SYSTEM Rnneent Coneninmnt Etti1 Af ne PREPARED BY R. Thomas 369-LOCATION EOC: Admin Bldg.
EQUIPMENT l.O. NO.
UNK EQUIPMENT NAME COntainTnt Tendon Access Gallery DATE 4-10-81 PURCH ASE ORDER NO. N/A CCN/DCN NO.
N/A "1 "# F '"" * >
WORK REQUEST NO. N/A II.
DESCRIPTION OF NONCONFORMANCE Cracks in the Reactor Building Tendon Access Gallery have not been =arked or mapped, thereby preventing a determination Of crack growth and propagation.
I fl A.
CESIGN REVIEW AND 10 CFR Section 50.59 review required.
11 8. COGNIZANT ENGINEER ASSIGNED YES C NO 0 SIG N A TU R E DATE
- ill, OlSPOSITION (cfreck onel ACCEPT C REJECT C REPAIR C REWORK C REPLACE C OR AWING NO.
IV.
OtSPOSITION INSTRUCTIONS AND TECHNICAL JUSTIFICATION TR ANSMITT AL NO.
THIS DISPOSITION WILL REQUIR E:
A Drawing Change A Retest of the System / Unit Test No. Uf applicable /
Yes C No C Ye. C No CC G NIZ A NT E NGIN F E R DATE V.
ENGlNEERING REVIEW BOARD trequired on all accept,r*pasr dispositions)
DATE M AN AGER. NUCLE AR OPER ATIONS SMUD C AO DATE M A N AG E R, GE N E R ATf ON E N GIN E E RING OATE VI.
SCHEDULING OFFICE of applicable)
Work Requests ECN/DCN Vit.
REPAIR / REWORK / REPLACE COMPLETE ard ACCEPTABLE DATE INJPECTOR Vill. RETEST COMPLETE and ACCEPTABLE TEST RESULTS APPROVED BY DATE IX A.
CAUSE IXB.
CORRECTIVE ACTION i
+
e
---.NL M D fq
~ _ _ _ _
l RANCHO SECO NONCONFORMING REPORT SYSTEM Reactor Containment Building PREPARED BY R. Thomas 369 LOCATION E & OC, AD BLDG EQUIPMENT 1.D. NO.
EQUlPMENT NAME Containment Building Steel Liner Plate DATE 4-10-81 ECN/DCN NO.
N/A PURCHASE ORDER NO. N/A "I Jppucaod/
- WORK REQUEST NO.
N/A 11.
DESCRIPTION OF NONCONFORMANCE 1.
Evidence of corrosion has buen found on the in liner plate adjacent to the concrete abutment. of both stairwells inside the Reactor Building.
This corrosion is most evident at the icwer level of the building.
2.
Evidence of corrosion has been found on the E=ergency Hatch Penetration Tube protrusion into the Reactor Building.
II A.
DESIGN REVIEW AND 10 CFR Section 50.59 review required.
11 8. COGNIZANT ENGINEER ASSIGNED YES O NO O s,,,,,,,,,
om lit.
DISPOSITION (check one)
ACCEPT O REJECT C REPAIR C REWORK C REPLACE C IV.
DISPOSITION INSTRUCTIONS AND TECHNICAL JUSTIFICATION DR AWING NO.
THIS DISPOSITIO N wtLL R EQUIRE:
A Drawmg Change A Retest of the System / Unit Test No. (if applicable)
Yes C No O Yes O No COGNIZ A t.T E NGlN E E R OATE V.
ENGINEERING REVIEW BOARD (required on all accept lrepatr dispositions)
DATE M AN AGER. NUCLE AR OPER ATIONS MMuO G AO DATE MANAGER, GEN E R ATION E N GIN E E R(N G DATE VI.
SCHEDULING OFFICE raf applicable)
Work Requests ECN/DCN Vll.
REPAIR / REWORK / REPLACE COMPLETE and ACCEPTABLE INSPECTOR OATE Vlil.
RETEST COMPLETE and ACCEPTABLE TEST RESU LTS APPROV ED BY 7 ATE IX A.
CAUSE I X 8.
CORRECTIVE ACTION
ANCHO GECO WORK REQUEST PRESS FIRMLY USING ONL' ALLPOINT PEN OEPT.
ST ATu.
Eau M2NT..o.
Sv5 TEM m = m-
- 1. (WOR x R E..u; T NO.
I I
.ir "56337 i
UlPMENT N AME
?dE A C70R 2LJ /L D / /\\1(;
P =lD m tvin i= L.
G,OA TiiMG SL194>10 m 4TIAT40N OATE
- N 4T4 ATION TIM E EQUlP.MHS.
P & 10 / E.10 L STO R Y O d-/0-Si iGCC
/Y/A O&LEM i H EQUEST h= R30/MiU f=l__
Dl_ A T5nP/V1 GQA Ti/VG 3 /195>02T0 T/-ild! /
V_J T Ti-f i=
RS A CTOR 2LJ/L D /iVG A Rl=
RL/ STY ft ll
/
"/Keuxug
^'
' N sDCN NO.
ECNIOCNREQ*D NPRD NCR Q A CLAS5 S E H I A L.4 Z E D NO.
- lD R N O.
YES O NO N YES O NO O gfg g
gjj SPECtION H EQ'D P R O C E D U R E 15)
TEST R EQ'D YES O NO 8 YEs O NO 8 g
- .g (GINJERfMG REQUJREMENTS
'n/U TIiU( JE TG M0/U/ TOR S U P 90/4 T G 50 9 CO D h OG/0/U Ob1
, /\\J A / U l v i J A L__
2A 3 /G. 3/DETl fir A S>EA=
Vvr-stcm Exi-1iP/ 7
=x Cf=M / VE Copp0G/Otu(ThAT iAini / C H INQUl O
//'A Q A / 9 T /~1 2 S U M C
- T/?UCTUl@A L iluTt=Gl?iTY /C' A Ll_n VVEL3 TO CO/U tim JEEl tjujLi f l<knx ENG4NEER Pnt J/
P n
E
/VE Ar Q N ' D r ) R />\\s G Y H E /4U Ot JTAD2.
O T IG N
.O.1 F U N CT iO N CLEAH ANCE RWP EST*D EST*O EST*D SU PER ViSO R R E PA B R CREW MAN
, TIM E SIZE HOURS 4
3 R R ECTIV E ACTIO N/ WOR K PE R FORM ED Iw
?>
I l
C Cf t'
l l
C l
l E
C l
l l
O l
O O
l R EC ALIBR ATION OUE EST EQUIPM ENT l 5ERI AL NO.
Q A T E (MOs D As V R)
TIM E 4HH sMIN)
{
- WOR x PERFOM MED B Y I
SIZE
. HOURS R ESPONSISLE FO H EM A N e5PECTOR h 5Nf FT SUPERVISOR I
NGIN EERING R EQUIR EME NTS COMPLETED C
l l1 C
C
.O;l
- c lu
IA,NCHO,SECO WORK REQUEST
.m.
PRESS FIRMLY. USING ONL 'ALLPOINT PEN mi=en' C%oR K R EQu E;T No.
DEPT.
sTATua EwuiPMENT i.D.
sv5 TEM 56333 I
i JulPMENT N AME
?f=A L_
BETin/ c=t=/\\/
Pl=4CTOM b
A U X /L I AR Y
&Llit.!Ji/ \\lG tiTa A flON D AT E (MITI A TION s' I M E
' EG u lP. N R S.
' P & ID i E. 8 D HISTORY 4 ~ E - 21 0 GCC jy /A 90.LEM f R EQUEST 3/=4 /-
92'TVV2E/M iM 4 r TC 2 F
A l J X/L_ / J, R Y dUi L f )/ / MC-CRACKt=D f IsvA RI>2 D AT
~.?O FT' WVG ll u 4 l > EA in
'D s= C
@.XJS. Cd - 6 C A TTACHQQ)
//
- " f /flyasu' pm C MIDGN NO.
ECNIDCN REQ *D NPRD NCH Q A C LA S5 hEHI A L8Z ED NO.
MID R NO.
'" O
'" O
" O
/Y /A ht/A lu /A iM /h TEST R EQ'O 45PECTION R EQ'O PROC E DU R E (5)
YES O NO Si YEs O NO 8 jg' f p NG4N EERING REQUIREM EN TS E AIR DEPOR9)Sh/
GEDLACM AS REQ UiRED.
f/
/ / '
-V
/\\
l lwWA E NGI N E E FV
.C T G O N s.O.g P U NCT IO N CLE AH ANCE
'RwP EST'O
~EST*D EST'D SU PER V 650H REPAlR CREW MAN TIME SIZ E NOURS
(
a e
l l
l O
f EST EQUIPM ENT
TIME (HHtMIN)
SIZE e HOURS t,
RE.PONsBcE,0 EMA~
~.PE CTO R
?I si
- ANCHO SECO WORK REQUEST PRESS FIRMLY. USING ON
' BALLPOINT PEN lC" CNOR K REQU EdT NO.
OEPT.
ST ATUs EG u er M_N T 4.0.
S y sT EM e
56332 I
l JU4PMENT M AME A
MAL B E TVjc=E=/u Pl=A CTCP RuiLDirvG AOx 211/LDiivn 44 T A ATION DATE 8 NIT 8 A TION TIME E Q U I P. M H S.
P & 10 s C.10 N ISTO R Y W 8/
69dC
/V //1 tOaLEM p REQUEST s
Tr=A L Rl= TL',/t=2^)
Rc=ACTOP A L)X/ L i4 R Y
&UiL L3hvG sa
't,) A C K E D A T -JO ST L E V El_
uO MPA P ( 9/= = S 9.x G C~ S ]
[7"~ T "W" / /w
= w ON sOCN NO.
ECN/DCN R EQ'O NPRO NCH u A CLASS bE HI A LAZ EO NO.
M tO R NO.
YESO NO @
YES C NO C TEST R Ed *D 45PECTION R EQ'O PROCE DU R E (Sl vES C NO b YES O NO 3 y/A NGIN3ERING REQUIREM ENTS Ot=9A/R Q L = 5 f_J P 2 / S H PEPLAc2 AS RE=OLJ/SELX
[)
/
\\/ /
/
E N G 4 N E Er
/ /
/
/ \\
/ /fS W C 18 0 N
.OsFUNCTtON C LE A R ANCE
'HWP EST*D EST*D EST*D SUPERVtbOH R EPA IR CREW MAN TI M E SI Z E NOURS O R N ECTf V E ACTIO N/ WOR K PER FO R M ED N
0 l
l e
l l
5 I
I O
l
'EST EQUIPM ENT l SERI A L NO. O l REC A LtBR ATION OU E WORK PE RFOH MEO e v OATE LMosOAsvH) TIM E (MHsMIN 6 g
jACTUAL
.C L
l
]
f SIZE I MOURS n ESPO NSID LE FO R EM A N eSPECTOR e'
l SHI FT SU PE R VISO R NGIN E EHING H EQUIR FM E NTS COMPLETE D I@
lE il
!e@
~ _.. _ _ _.. _ _ _ _ _
IANCHO SECO WORK REQUEST PRESS FIRMLY, USING ONLV BALLPOINT PEN
,-.s F"'C"'7" F4TT.
WOR K RE6UEdT N g.
D E PT.
(e eUS EQU SPM4NT l.D.
S Y ST E M 56328 I
i:
3U4PMaNT M AM E 2=AcTop raiv 7A liwva=iu r eutenimn peine ips riniv en
=
44T 4 ATaON D ATE INGT6 ATION TIME EQulP.MRS.
P en ID sE.10 N ISTO R Y CNLY
,y7 laiLEM # REQUEST G MCt linD GTRAh>
mR 92iMET/2A TiOsv GQ iG Lanat=
(Fx Tt=9/Ci> S/02)
^
/M
"" W
/ A o
- 4 y e CNIOCN NO.
ECN tDCN REQ'O NPRD NCR Q A C LA.55 S E N t (L4 Z E D NO.
MIDH NO.
~
YEs O NO 3 YES O NO O gg gy 45PICTION R EQ*D PROCEDURZ(5)
TEST R Et3*O Y Ea 0 NO 2 vEs 0 NO E NGINIERING REQUIREM ENTS TiG H T f/M G90Uhlfh STDA l3 FAST 2N293 SS=Cl JRE GTRAD AG DEO U / DEO.
Y
'"X
/fiwd GT AON
'RWP EST*D E ST *D EST*D SU PER VISO R R EPAIR CREW MAN TIME SIZE NOURS
(
O RR ECTIV E ACTION (WOR K PER FO R M ED h
a G
1 I
s 3
i f
e EET EQUIPM ENT k SERI AL NO. O l R EC A LIB R ATIO N OU E O l
lO A TE 4Mo#O Asv R) l TIME (NHsMcN) g WO R K PE R For.M E D a v C U L ACTUAL i
(
l l
f SIZE
! HOURS f
45 PE CTO R R ESPO N54G LE FO R EM A N MG4N E ERING H EQUIR EM E NTS COMPLETE D lSNtFT SUPERVISOR c
c
-l s
D
- AN
'S.ECO WORK REQUEST ]
PRESS FIRMLY, USING ONL ALLPOINT PEN GT Wsif K R EQ U E&T NO.
9EPT.
STATua LG u EPM EN T 4.0.
eYsTEM E
~5633' l
JU6PM EN T N AML
/
2D L SEYl/VLQS/v lDEACTop r A u ><
et 1/i_13/iv C3 4 6 TI A TIO N DATE
' tN 6TI ATION TIME
~ E Q u i P. N H S.
IP & ID s L.AD NISTO R Y J-E-?C l QGoo h//A IOaLEM # R EQUEST
& = 4 /__
L;5'ETVV s=i=/u CE/L liVG AT T IM L=
+.? 0
(__i= !/ 2 /
05 THE a i nc / L /AR Y 20 /LDING AND
'TH E Di=M TC/-P Bi)/l D//\\lG G
De== TED/0/DA TEL)
/fu A/Di= A
> l /h= C GP205.04-LA
\\ T TA CHt=D )
f)
/ /
"7c "
/ Am
>w C N pDCN NO.
ECMIDCN REQ'O NPRD NCR GA CLAS$
Sk R t A L8Z ED NO.
M.O R NO.
YE5 O NO E vES O NO O gg jyjj gg 45PE CTION R EQ'D PROCEDURE (5)
T EST R EQ'D vE5 O NO W YEs O NO W y fp NGINEERING REQUIREMENTS
~
Ot= PAllD Pl=MJD213 H 4E=/Bt A CE AG 926fJ /QE= / D
/
l ENGINEE
~ CLEARANCE RWP EST*D EST'D EST*D SUPER VISOR REPA4R CREW MAN TIM E SIZE NOURS 4
- OnRECTiv E ACTION / WOR M PER FORMED E
a
(
(
t
(
(
~
l I
O l
O l S e. 91 A L N o. O l R ECALIBR ATION DUE TEST EQUIPM ENT gC U L ACTUAL WORM PERFORMED BY DATE(MotOAsvR) T8ME INRfMcN) 5,ZE I MOURS l
l l
R ESPO NS.B LE FOR EM A N NSPECTOR
- Me NEER Ne REQU,REMENTSCOMPLETED S N,,T SU PE R.,50 R
_i
- l C
$l C
w c
- t Of
ANCHO SECO WORK REQUEST PRESS FIRMLY, USING ONLY_ BALLPOINT PEN 3
e
~
F"lC R etT ly4RM REuU EiT NO.
' D E FT.
S.
UJ E U U 4 PM.N T 4.D.
S Y ST E M i4.~56330 l
- UIPMENT N AME Pt= A C tor;>
Col \\LD ltVM E/VT SU (L E.31/\\>C-4 T6 A flON D AT E SM8 TI ATION TeMZ E Q U IP. N R S.
P & ID / E. eD N ISTO R v a - ?, - ? /
/700 N/p rO ALEM i REQUEST 4 t J/Vu=CXli la C9Acr5 im iNALL GUMACc=G Q7 Ti=IvtfiN L CCPG3 M L L_l_c= 9 Y.
O?c=1= :
NCR S - / s &.) )
lJ __ --/
T
/
"lk
/ / f'd pm
!N tDCN NO.
ECN tDCN REQ *D NPRO NCR Q A CLASS SERI AL4 ZED NO.
MID R NO.
YES O NO O vEs O NO O TEST R EQ'O SPE CTI ON R E Q'D PROCEDURE l$)
vEs O NO O YE3 O NO O 1GINEERING REQUIREM ENTS ENG8MEER aT!ON SU PER V 450 R
~ CLEARANCE RWP EST*D EST'O EST*D R E PA I R CREW MAM TIM E SIZE NOURS 3 R R ECTIV E ACTIO NtWOR K PER FOR M ED Q
Q l
\\
s I
l~
I I
)
O O
l RECALIBR ATION DUE O'
l 5E RI A L NO.
EST EQUIPMENT C UAL ACTUAL 1 WOR K PE R FOR MED B Y D A T E (MOsD Ad V R)
TIM E (HRsMINg l.
f SI Z E I NOUR5 R ESPO N54 S LE FO R EM A N GSPECTOR s
lSNlFT SUPER VISO R NGIN E E RING R EQUIR EM ENTS COM PLET'ED C
c l
Ce
"'C"'T' G'NOy K L E u U EST N s.
^'Us LG u sPM EN T a.D.
eY sT EM
' D E PT.
l.
rf 56329 4 U t P %14 N T N h M E o
36A C TOR CQi\\/ T4 flV M L*N Y S(JIL_ D / tVG G TI ATION OATE O N 4 T 8 A TION TIM E EQ U 4 P. M R S.
P & ID p E. g D N ISTO R Y J ~ L.? /
/6CC
/V/4
'O e LEM # R EQUEST l-- lYY)]Y M
l $bY /Y
)
/ /
""W / /w.ol sw
- N tDCN NO.
ECN #DCN R EQ'O NPRD NCR Q A CLASS SE R fALIZE D NO.
MID R NO.
' O "E
*U
" U
^1/4
/M /A
/\\1/ A T E ST R EQD SPICTl N R EQ'D PROCEDURE (Sl YES C NO 8 YEm O NO 2 7 jg 4 GIN 53 RING REQUIREMENTS ri i=AN 5
/@c='IDA /R AS
/vc= Ct= 3 S A /> Y
/M
'"" W
/ M r &
N 2 T RON
.O./ P U N CT is 'N GLE AR ANCE RWP EST*D EST*O EST*D SU PER V ISO R R E PA IR CREW MAN TIM E SIZE HOURS 3RRECTIVE ACTIOMtWOR K PER FORMED s
=e.
e w
a C
C cr 6
C l
C l
l C
I l
l l
O I
O l 5ERI AL NO. O l REC ALIBR ATION OUE EST EQUIPM ENT CTUAL ACTUAL
(
M C f4 E W MAN l
I SIZE
_ HOURS I
R ESPONSIBLE FOR EM AN (5 P E CT O R MGIN EERING R EQUIREMENT5 COMPLETED l 5HIFT SUPER V ISO R
(
l C
i C
l C
C i
C l
.n "I]"!7" A..
IT WOgd R t t u E.uT N,.
D E FT.
- T
.I-hG u aPM EN T t.U.
nV TEM i r 56327 l
I Us PM ENT+N AM E De=taL i dR CC/M T/J /NM t=/\\17 2/ lh D/h/G PE= iud =TPA TiQ/US i/3 lin
.Yl A TION G AT E IMeTI ATION TIME EQ UIP. NHS.
P & IO i E. 80 H ISTC R Y 4 F/
/Mn
/V/A OLLEM / REQ UEST g
.OPiuPTRA T/ Q /UG
//3 r
I i,S A />e=
LE=Ai</ JUG G /26Ad?E
'I=~ X T E= 9 t G R S/QE]
n
/
/]
ORM
/
/
D d. O NgDCM NO.
ECN sDCN R EQ'O NPRD NCR Q A CLA55 S Lh l A ba Z h D N O.
MIDR NO.
ru -
YESO NO N YES O NO C iPECTIgN REQ'O
/v/A
/
A//A TEST R EQ'O PROCEDURE (5)
Y ES O NO 3 YEs 0 NO %
^ /-_ i= A /V E REPA /R Ja,2
/\\tEC ESSA R Y
[)M
'"' W
/ /42-~d
.T IO N O./ F U NCTION
~CLEARAHCE RWP EST*D
' E ST*D EST'D SU PER V ISOR R EPA 4 R CREW MAM TIME 54ZE HOURS 4
)R R ECTIV E ACTION / WOR M PE R FOR M ED b
I ih:C v
IT i
C l
C l
I C
i I
I 7
O l
EST EQUIPMENT
- l 5ER I A E. N O. O l R EC ALIBR ATIO N OU E DATE (MOsO AsV R) TIM E (NR sMIN)
, O R K PE R FOR MED B Y W
CTUAL ACTUAL CREW MAN l
h 58ZE NOURS I
6 R ESPON54BLE FOR EM A N 4 S e< E CT O R I
MGIN EERING R EQUIR EM E NTS COM PLETED h 5Nf FT SUPER VISOR C
I 6
C i
C I
b 1
/ Y-l!
.".,L,,_.'s..
RESULTS OF GENERAL VISUAL INSPECTION OF EXTERIO ENCLOSURE 6.2
.1 WALK AROUND INSPECTION
/$ 8' m.n T. / ^"I
.2/
Observations and Results %.r.a
~
i s
V M/3/./ S A/r, /
1 9 -[- k 7 e e. [ Date:
[(/
Inspector:
tr
.~:
.K.
Q / 2.: ' 'ts./3/, h' C I d ~~'
7)-l = CG
'... f p,w REACTOR BUILDING DOME INSPECTION 3,.;
f.o,.g / r o(hr #
d /r' X b -.
,2 '
Observations and Results f ;de
(
- r. W -n n,.., w i. U //o Y,,, /m t'.,, s1j m.N1.- ; -j.,bh *
- n T/ft
- nJ4 a> 4 s in. '<, 4 Mb
> -r :/ =., -l.
/, r. -,, :.L.;9 I.* ~G e r *. h,n Y,.
%, /_w a.G?n)A, n.n A 2. // 3 W/) !
9-[-I/
Inspector: bd /.9. e,tcN.
S Date:
v-
. 3
TENDON ACCESS GALLERY INSPECTION G
n-c_/
d' r -.,'
Observations and Results /7 d'
-74#
/
/
-/~.'
./
~7 Date:
'7 '-
Inspector:[d % / r Corrective Action if Required:
- pfI.^
~: D l ' Vi /:.. G.,.C s V4C 9 ti.,94'O /?M s ')
7!
IN TSC!=/ 7 i A >= T *:.9 C E y 20.=
e..-
p'% ' %q :--sptoc T u 12'/.-
A~~t~~
L)' '
A I> ' '
/
TVR'S1.% 2 II
^
Date:-
Reviewed by b
~/ ' " ' ' ' ' -
Technical Support SP 205.04-7
i
,i Page 1 of 3
'e 4
ENCLOSURE 6.3 RESULTS OF SPECIFIC AREA INSPECTION OF EXTERIOR SURFACES AREA 1 - GRADE LEVEL - area surrounding the eg'uipment hatch.
'1 Observations and Results d M' f
1 7- [ - 2 /.
m m
U M's
=
~v Date:
Inspector:
es
/.2 AREA 2 - GRADE LEVEL - area surrounding the emergency hatch.
Observations and Results C8' f-[-l /
Date:
Inspector: 1.)b')
7' V
/. 3' AREA 3 - GRADE LEVEL - area in the vicinity of the A Main Steam Line.
YN' Observations and Results l
l 1
I Inspector :/,</Q
/s Date: k-/
/
i g
l l
AREA 4 - GRADE LEVEL - area in the vicinity of B Main Steam Line.
.4 6 /[ '
Observations and Results l
~
'/ 2 - e,/
,../
Date:
Inspector: //]
V AREA 5 - GRADE LEVEL - area in the vicinity of the electrical penetrations.
(
5 Observations and Results 6 k' '
l l
Inspector://l i Date:
..--.w.y,n. - --,-,-
,m
--.-,---m
-.---.4
--w
Page 2 of 3 h'NCLOSURE 6.3 (Continued)
RESULTS OF SPECIFIC AREA INSPECTION OF EXTERIOR SURFACES
/.6 AREA 6 - +20 FT. LEVEL - area in the vicinity of purge inlet and outlet and electrical penetrations.
Observations and Results [N'
- ' Date
- 9. ~
a7 Inspector:
e.7 AREA 7 - +20 FT LEVEL - area in the vicinity of electrical penetrations.
Observations and Resul.ts OM '
i py' 0,$0
'<'/
Date:
76 i//
A
. r e
Inspector:
f I'
/.8 AREA 8 - +40 FT. LEVEL - area in the vicinity of the personnel hatch.
Observations and Results d /( '
Inspector: (,d 4 Date: h.E b!
I
'.9 AREA 9 - +40 FT. LEVEL - area in vicinity of the plant exhaust.
Observations and Results
[-
l i
.10 AREA 10 - -20 FT. LEVEL - mechanical penetration area in West Decay Heat Cooler Room.
Observations and Results
$). n,w -. $ i a r&. :'r J _ja) ; ':
$ A ",. E NCQ
/)G l& ~ {ta:
-3 w t:I T~a N j c.r,..,; u. /
..e y u (.-/ a,f l'.....
.,,,, g,,,a n s, /:, A gs ' WM l =,-
N Oi-T,b,r i.
' b i.~'. i' ~
SI- ~ /-
,~.
,K _
G E-:s. h C-v '
~
.~. ~ = 3 ;
e i
Date:_/-
/
3._/a y Inspector: t,4]
//;,..
- e.. n.
Page 3 of 3 ENCLOSURE 6.3 (Continued)
RESULTS OF SPECIFIC AREA INSPECTION OF EXTERIOR SURFACES
.11 AREA 11 - -20 FT. LEVEL - mechanical penetration area in East Decay Heat Cooler Room.
ObservationsandResults,,d/[
C/gY..,..
'/'- / - h /
Date:
Inspector:
e
/'. '
.12 ' AREA 12 - -37 FT. LEVEL - area in vicinity of Rx Building Emergency Sump Line to B Decay Heat Pump Suction.
Observations and Results dk' 1
Inspector: Ldbb) '. $v k, -8[.
Date:
V
.13 AREA 13 - -37 FT. LEVEL - area in vicinity of Rx Building Emergency Sump Line to A Decay Heat Pump Suction.
Observations and Results O
- - O O /
Inspector:[t/
4 $6 Date:
e' Corrective Action if Required:
Cn AJSc) et.Y ): >, *AT-4:m # -.'
$_,fr}C ! Onclab2
.cQ
.):,.
WT -
.c Yd 7.it >,~
.s. :,.~
l'..r.<d
- ~ - }'s 4 r>~ b.,_ :-
?l-lc'r$.;;
'h) R S b,
3<.
!s * > f,'fa7' p.r, e r'.
/~~~,,}fff i
& }lc~t
,..h$U:*ut e.ho ct.a-o ? h f e..
[ n,
!. I a'.
. :dJ..Y
.yit
/
i~
V
.L w,; 4r&.
/
.?. Gn o TA m n un of / r -,a g'
/
Reviewed by /.
Y' '
. e-Technical Support Date: ^
SP 205.04-8h
\\
RESULTS OF GENERAL VISUAL I!iSPECTION OF I!iTERIOR SUR ENCLOSURE 6.4
.1 WALK AROUND INSPECTION h
Observatiert: and Results Date:[-7(
/
d')
/
Inspector:
- t. '
.2 PENETRATION AREA INSPECTION Observatiomand Results O 2'
/ Date:[-J / -
Inspector:
o REACTOR BUILDING DOME INSPECTION
.3
((
Observations and Results h-) ff'[/
Date:
Inspector: 6 Corrective Action if Required:
- =h
/$/f f.-
. i./l kng, /b:?/ '
.c >./ :s i
/./
a : v. s,
)ls di{.%).: &, A e.e.. '... ; &G-m -G/A.w,.:f f % cl,.f' )
')
/
h/C fl?
ik C. t,>.
(_
- 7. f t
', bl od. //
,5../'b,i!
' ??, I (COA c s-i-= 'r-r)b / // // L. ?-
f\\/EA /)
MT T*A f.A f1 C f- /2 /)?W &h vyciv Z
1
//
Technical Support' Date: /O e -,
Reviewed by N
' / l#3 '
?-
l SP 205.04-9
.:4
.,t i)2I
~~
ENCLOSURE 6.5 RESULTS OF SPECIFIC AREA INSPECTION OF INTERIOR SUltFACES
.1 3 ft. above and below the horizontal centerline extending 10 ft. cast of the east edge of the personnel lock.
Observations and Results
/J d '
I
)
)
.h I Inspector:
6/ -o Date:
e
(:'
. 2.
2 f t. radius around electric penetration No. 7.
Observations and Results s
/2/ 9 A4 c.#
Date:.2 2 ~[
Inspector:
r Upper half of mechanical ponctration No. 40 (main secam) cxtending from
.3 edge of penetration to 6 f t. out from edge.
//!,'
6t %- /
i~
+ Ae.'
Observations and Results n
COCV or ht C 9
.N i b
< *- ; ; ' ; * ? -
n..
,( 7 74 c / b c.
/
O - A' 7 9
[- ) T 3/
^
N/
w <A Date:
Inspector:
V
.4 2 ft. radius about mechanical penetration No. 20 (HP injection)
Observations and Results /7 //
v
,x "Jb*
Inspector:h9 h' A't"-
D, ate: f.
Corrective Action if Required:
l
)
,/*
f.
J-Reviewed by
~\\
Technical Support Date:
em nos.04-10
RAiJCHO SECO
/.
NONCONFORMING REPORT QUALITY CLASS l
NO.
2-h/7 7 I-PREPARED BY R
Thn-ne SYSTEM p qq EQUIPMEfJT 1.0. NO.J Pene t rn e inns Q _ 11. 4R LOCATION Rnnehn hem F Qf' eactor-DUI! ding Pnnn e rn e i nn e DATE ggjo 7 EQUIPMENT NAME o
ECN/DCN NO.
M/A 50.53 LOG NO.
PURCH ASE ORDER NO.
tj /A DI 4'PI 8''/
WORK REQUEST NO.
fj/A II.
DESCRIPTION OF NONCONFORMANCE 1.
Wooden wedges have been inserted between piping and structure at penetration flo. 9 (exterior side).
2.
Wooden wedges have been inserted between piping and structure at penetration f1O. 11 (exterior side).
3 Piping resting On lagging at penetration tio. 48 (exterior side).
II A.
DESIGN REVIEW AND 10 CFR Secteon 50.59 review required.
11 8. COGNIZANT ENGINEER ASSIGNED YES O NO O SIG N a TIJ A 8 DATr til. DISPOSITION tchecA unct ACCEPT C REJECT O REPAIR C REWORK O REPLACE O IV.
DISPOSITION INSTRUCTIONS AND TECHNICAL JUSTIFICATION THIS Of SPOSITIO N w1LL R t.Q UIR E :
A Drawing Change A Retest of the System / Unit Test No. /rf appleabit/
Ye. O No O Yes No O COGNeZ ANT ENG4N E E R DATE V.
ENG1NEER1NG REVIEW BOARD trequered on all accept!repasr disposittons/
M AN AGER[ EsUCMEN DPE R AhoriS~OATE~~ M diiA76ENERAT10N ENGINEEHING DATE SWO Q A D D AT t; VI.
SCHEDULING OFFICE te/ applicactc/
Work Requests ECN/DCN Vll.
REPAIR / REWORK / REPLACE COMPLETE and ACCEPTABLE IN5PECTON DATF Vllt. RETEST COMPLETE and ACCEPTABLE T EST RESULTS APPROVE D BY IX A, CAUSE IXD. CORRECTIVE ACTION QA 5 M6tN E E R DATE GA ENGeNF E M DATE
RANCHO SECO NONCONFORMING REPORT PRS PREPARED BY R_
- Thnmac, SYSTEM EQUIPMENT 1.D. NO.
UNK LOCATION Rancho SeCo ESOC EQUIPMENT NAME Fuel BuiIding DATE 9/30/81 ECN/DCN NO.
M/A PURCH ASE ORDER NO.
y /A
' id dppdWO/C/
WORK REQUEST NO.
N/A II.
DESCRIPTION OF NONCONFORMANCE Horizontal Cracks apprOximately 3 feet apart On Fuel Building wall near B main steam line.
II A.
DESIGN REVIEW AND 10 CFR Section 50.59 review required.
11 8. COGN!ZANT ENGINEER ASSIGNED YES O NO O
,,,,s
,m lit. DISPOSITION (check one)
ACCEPT O REJECT O REPAIR C REWORK C REPLACE O IV.
DISPOSITION INSTRUCTIONS AND TECHNICAL JUSTIFICATION DR AWING MO.
T Hl3 DISPOSITIO N WILL R EQUIR Ef A Drawing Change A Retest of the System / Unit Test No. #f applicable)
Yes O No O Yes No O C O G N 4 Z A N T E N G 1 P4 L E R OATE V.
ENGINEERING REVIEW BOARD (required on all accept l repair dispositions)
M AN AGER. NUCLE AH OPER ATIONS DATE SMUD G AD OATE M,\\ N A G E N, GL N r A ATION E NG4 NE ERING DATE VI.
SCHEDULING OFFICE (if applicable)
Work Requests ECN/DCN Vll.
REPAIR / REWORK / REPLACE COMPLETE and ACCEPTABLE IN5OFCTOR OATF Vllt. RETEST COMPLETE and ACCEPTABLE TEST RESULTS APPROVED BV aATr IX A.
CAUSE IXD. CORRECTIVE ACTION
^*r~c~<w r ATc 2A ( N o. ~ i. a cATE l
RANCHO SECO NONCONFORT.ilNG HEPORT N O.
- - M EO
- ,0UALITY CLASS
,i SYSTEM Auxiliary Buildino PREPARED BY. R. Thomas EQUIPMENT 1.D. NO.
U!lK LOCATION Rancho Seco ESOC EQUIPMENT NAME Decay Heat Room DATE 9/30/81 ECN/DCN NO.
M/A PURCHASE ORDER NO.
fl/A N "#P"" *
WORK REQUEST NO.
Pl/A 11.
DESCRIPTION OF NONCCNFORMANCE 1.
Diagonal Cracks in wall separating decay heat pump rooms adjacent to emergency sump Suction A (near HV 26105).
2.
Cracks in decay heat pump room Ceiling abOve stairs.
3 Cracks in decay heat pump room Ceiling near BWST piping penetrations.
II A.
DESIGN REVIEW AND 10 CFR Section 50.59 review required.
IIB.
COGNIZANT ENGINEER ASSIGNED YES NO O
<,. r. r4 a T u o e r4Tc ill. DISPOSITION (check ones ACCEPT O REJECT REPAIR O REWORK C REPLACE O IV.
DISPOSITION INSTRUCTIONS AND TECHNICAL JUSTIFICATION DR AWING No.
T HIS 015POSITIO N WILL REQUIR E A Drawing Change A Retest of the Systen./ Unit Test No. (if applicable /
Yes O No O Yes No O C OGNIZ A NT E N GIN E E R DATE V.
ENGlNEERING REVIEW BOARD trequnred on all accepttrepasr dispositions /
M AN AGER, NUCLEAH OPEH ATIONS DATE SMUD Q AD OATE M AN AGE R, GE N E R ATION E N G l N E l* R I N G DATE VI.
SCHEDULING OFFICE (sf applicable /
Work Requests ECN/DCN Vil.
REPAIR / REWORK / REPLACE COMPLETE and ACCEPTABLE l
1NSPECTOR OATE Vill. RETEST COMPLETE and ACCEPTABLE TEST RESULTS APPROVED BY nATE IX A, CAUSE IXB. CORRECTIVE ACTION i
l l
l Q
- N NFEH DATE
/JA LN(.INFFM DATE
J,,
RANCHO SF.,p o
NONCONFORMING REPORT p,UALITY CL ASS l
N O.
2
,).
'O I.' SYSTEM PBS PREPARED BY R_
Thnm e EQUIPMENT l.D. NO. _
Z-1 LOCATION Ranchn b r-n C e Of EQUIPMENT NAME C en t3 }Arae n t l_ i n e r-DATE o/30/91 ECN/DCN NO.
N/A PURCHASE ORDER NO.
WORK REQUEST NO.
fl/A II.
DESCRIPTION OF NONCONFORMANCE Evidence Of Corrosion is preSent On liner Coating adjacent to penetration NO. 40.
IIA. DESIGN REVIEW AND 10 CFR Section 50.59 review required.
IIB.
COGNIZANT ENGINEER ASSIGNED YES NO O 5 t r. N A T o J N E OATE lil.
DISPOSITIOfJ tcheck one)
ACCEPT C REJECT O REPAIR O REWORK C REPLACE O IV.
OlSPOSITION INSTRUCTIONS AND TECHNICAL JUSTIFICATION DR AWIPeG NO.
THIS DISPOSITIO N WILL R EQ UIR E s A Drawing Change A Retest of the System / Unit Test No. (if applicable)
Yes C No C Yo. O No C OGN6 Z A NT ENGIN E E R OATE V.
ENGINEERING REVIEW BOARD trequnred on all accepttrepasr dispositions)
M AN AGEH, rf UCLE AH OPEH ATIONS DATE SMUD QAD OATE M A N AG E R, G E N E R A TIO N E NGINE E RING DATE VI.
SCHEDULING OFFICE tif applicable)
Work Requests ECN/DCN Vll. REPAIR / REWORK / REPLACE COMPLETE and ACCEPTABLE INSPECTOH DATE Vllt. RETEST COMPLETE and ACCEPTAOLE l
TEST RESULTS APPHOVED BY IXA. CAUSE lxD. CORRECTIVE ACTION l
l
=#'"6'N'E"
^TE Q A _ E N G t N E E R_ _ _
__ _DATE
_