List of results

  • ML19254D257  + (Submits Followup to .Parties Should Have Opportunity for Second Round of Meetings on 791018 & 19 Prior to Prehearing Conference)
  • ML18081A801  + (Submits Followup to 790921 Commitment to Meet Auxiliary Feedwater Pump Test Requirement by 800101.Commitment Revised,Due to Extended Plant Outage.Will Perform Test as Soon as Possible After Return to Power)
  • ML19210C870  + (Submits Followup to 791019 Rept of Inadequate Pipe Restraint on Spent Fuel Pool Cooling Sys.Plant Presently in Cold Shutdown.Will Complete Corrective Action Before Mode Change)
  • ML19250C303  + (Submits Followup to 791019 Telcon.Facility Selected at Random for Implementation of Craftsmen Interview Program to Be Included in Insp Program.Interviewing Will Commence After 791115.Requests Util Cooperation)
  • ML19257A771  + (Submits Followup to 791126 Notice of Intent to Participate in Proceeding on Behalf of Util Waste Mgt Group.San Diego Gas & Electric Co Is No Longer Member & Should Be Deleted from List of Participants)
  • ML19310A242  + (Submits Followup to 800516 Rept Re Discovery of Auxiliary Bldg Wall,Inadequately Connected to Interfacing Structural Elements.Detailed Rept W/Corrective Action & Possible Similar Conditions Will Be Provided)
  • ML20002A626  + (Submits Followup to 801024 Telcon Commenting on Draft 3 of Revision 2 to Reg Guide 1.97 Re Environs radioactivity- Exposure Rate.Restates That Instruments to Measure Type C & E Variables for Environs Monitoring Are Readily Available)
  • 05000293/LER-1981-058, Submits Followup to 811109 LER 81-058/01T-0.Corrective Actions:Carbon Dioxide Fire Suppression Sys in Cable Spreading Room Will Include Mods or Replacement w/Halon-1301 Sys.Fire Patrols Initiated  + (Submits Followup to 811109 LER 81-058/01T-0.Corrective Actions:Carbon Dioxide Fire Suppression Sys in Cable Spreading Room Will Include Mods or Replacement w/Halon-1301 Sys.Fire Patrols Initiated)
  • ML17319B591  + (Submits Followup to 820907,17 & 24 Ltrs Re Emergency Relief Requests from Tech Spec 3.5.2.Repairs of North Safety Injection Pump Completed within Alloted Relief Time Granted by Amend 62.Amend Fee Encl)
  • ML16341B984  + (Submits Followup to 830609 & 10 Telcons Re Resolution of Issue of Appropriate Intake Temp to Be Used in Component Cooling Water Sys post-accident Heat Removal Analysis.Draft Should Be Submitted Prior to 830701 Submittal)
  • ML20093N218  + (Submits Followup to 840523 & 0705 Ltrs Re Position That NRC Exhibits pro-applicant Bias.Position Based on Denton & Util 840417 Notes.Board Action Requested.W/O Encls)
  • ML20141G814  + (Submits Followup to 860211 Request for Intervenor Status in Proceeding.Concerns Re Facility Radiological Emergency Response Plan Listed.Served in Feb 1986)
  • ML20151G268  + (Submits Followup to 880411 Telcon Re 880408 Routine Test of Containment Isolation Dampers.Stuck Relay Replaced on 870605 Due to Leaking Seals.Dampers Will Be Tested Weekly for Next Month & on Random Basis for Following 3 Months)
  • ML20151L743  + (Submits Followup to 880610 Telcon Re Preferred Method for Searching hand-carried Packages Prior to Entry Into Protected Area.Acceptable Manner to Meet Performance Objectives Is to Use Equipment to Search Packages)
  • ML20154M807  + (Submits Followup to 880915 & Previous Meetings Re NRC Comments on Documents Previously Submitted.Listed Revised Documents,Incorporating Resolutions to Comments,Including App F to NUMARC 87-00,encl)
  • BSEP-89-0608, Submits Followup to 890328 Response to Violation Noted in Insp Repts 50-324/89-02 & 50-325/89-02.Clearance Ctr Being Developed to Change Stated Responsibilities  + (Submits Followup to 890328 Response to Violation Noted in Insp Repts 50-324/89-02 & 50-325/89-02.Clearance Ctr Being Developed to Change Stated Responsibilities)
  • ML20246J762  + (Submits Followup to 890824 Request for Temporary Waiver of Tech Spec Requirements Re Annulus Ventilation Sys)
  • ML20072U212  + (Submits Followup to 910408 Rept Re 910116 Shipment of Small Quantity of Radioactive Matl.Shipment Should Have Been Labeled W/Radioactive Yellow-2 Label Instead of Radioactive Matl,Limited Quantity Label.Procedures Revised)
  • ML20034G784  + (Submits Followup to 930127 NRC Bulletin 91-001 Rept 24955 Re Overfilling Sintering Boats on 930127.Shift Supervisor Determined That 38 of 42 Sintering Boats Exceeded Max Allowed Slab Height.Boats Rearranged & Personnel Informed)
  • ML20036B261  + (Submits Followup to 930428 Response to NRC Bulletin 91-001 Re Buildup of Ash in Primary & Secondary Chambers & Flue of Incinerator Used to Burn U-contaminated Combustible Waste. Portions of Incinerator Replaced)
  • ML20058B135  + (Submits Followup to 931115 Open Meeting Re Proposed Product Sampling Autoclaves for Louisiana Energy Svcs Claiborne Enrichment Ctr.Proposed Agenda Slides Presented at Meeting & List of Attendees Encl)
  • ML20080D592  + (Submits Followup to 940418 Part 21 Re Investigation W/ Respect to Jan 1994 Incident at Prairie Island Generating Plant Involving Crane Design Gate Valves)
  • ML20076M832  + (Submits Followup to 940516 Part 21 Rept Informing of Investigation to Determine Data Supplied in mid-80 Used by Nuclear Utilities to Set Torque Switches in MOV)
  • ML19325C437  + (Submits Followup to ACRS to Chairman Carr Re Emergency Plan for full-power Operation of Facility.Nrc Will Address Issues That Arose During low-power Testing & Corrective Actions Recommended by FEMA in Sser 9)
  • ML20154B922  + (Submits Followup to Author 880411 & 0506 Ltrs Re Util Plans for self-assessment Activities at Facility.Util Presently Implementing Encl Readiness Verification Program)
  • ML20084C118  + (Submits Followup to Describing Status of Program Addressing Positions in Generic Ltr 83-28, Required Actions Based on Generic Implications of Salem ATWS Events. Nutac Final Draft Rept on Generic Ltr 83-28 Encl)
  • ML19210A143  + (Submits Followup to Event Rept 76-11/3L Re Seismic Qualification of Steam Generator Pressure & Level Indicators.Instruments Passed Seismic Tests But Addl Info Necessary Before Final Rept)
  • ML19290A713  + (Submits Followup to Initial Rept in Response to IE Bulletin 79-19.R Chapdelaine Responsible for Waste Disposal Requirements.Instructions & Operating Procedures Re Packaging & Transportation of Low Level Matl Were Developed)
  • ML20154S052  + (Submits Followup to J Hornor Spring 1998 Visit,In Preparation of Next Year Agreement State Review by Nrc. Amendatory Sections of Wac 246-249,WAC 246 250 & Wac 246-252 Encl)
  • 05000206/LER-1981-024, Submits Followup to LER 81-024 Re Failure of Energy Products Group Ball Valves W/Efcomatic Actuators to Trip Initially Per Commitment Made in Design Change 78-34.Actuators Will Be Replaced W/Different Design  + (Submits Followup to LER 81-024 Re Failure of Energy Products Group Ball Valves W/Efcomatic Actuators to Trip Initially Per Commitment Made in Design Change 78-34.Actuators Will Be Replaced W/Different Design)
  • 05000277/LER-1981-038, Submits Followup to LER 81-038/01T-2.Several Cables W/ Deficiencies Corrected by Pulling New Cables & Redesignating Others.Interposing Relays Installed to Separate safety- Related & nonsafety-related Control Circuitry  + (Submits Followup to LER 81-038/01T-2.Several Cables W/ Deficiencies Corrected by Pulling New Cables & Redesignating Others.Interposing Relays Installed to Separate safety- Related & nonsafety-related Control Circuitry)
  • ML20248G121  + (Submits Followup to Ltr Received by Lab & Radiation Svc Div, Addressed to P Shwayder from Lj Callan of Agency.All Correspondence Should Be Directed to Dept Main Campus Address & Not to Lab & Radiation Svc Div Location)
  • ML13322B103  + (Submits Followup to Oral Request to C Caldwell for Temporary Relief from Tech Spec 3.4.3, Auxiliary Feedwater Sys, in Order to Maintain Unit 1 in Mode 3 to Continue Repairs on Steam Driven Auxiliary Feedwater Pump)
  • ML20244D599  + (Submits Followup to Performance Audit Insp Conducted on 890329-31.Monitoring Discontinued After 1985 Since No Changes Occurred in Plant Operations That Suggest Some Alteration of Chickamauga Reservoir Water Quality)
  • ML20217L016  + (Submits Followup to Questions Raised During 970717 Meeting W/Nuclear Energy Advisory Committee Re Nuet Npps.Responses to Questions 8 & 9 Listed)
  • ML20136D747  + (Submits Followup to Questions Raised During Recent Nuclear Energy Advisory Council Meeting Re NRC Contract W/Sargent & Lundy Selected by Northeast Utilities to Conduct Independent Corrective Action Verification Program at Millstone 1 & 3)
  • ML19290C589  + (Submits Followup to RO 79-15,Suppls 1 & 2.Analyses & Evaluations Completed.Mods Associated W/One Seismic Support Performed & Completed on 791221.Power Operation Will Not Be Resumed Until Further Aslprobable Delete:Dupe of 8001020454)
  • ML19257A200  + (Submits Followup to RO-79-15.All Analyses & Evaluations Completed.Summary of Corrective Actions on Pipe Supports & Restraints Provided.Power Operation Will Not Resume Until Further ASLB Order)
  • ML19318B463  + (Submits Followup to Re Addl Comments on Fes for Facility.Recommends That Format Used in Responding to Comments or Questions Be Modified to Specifically Identify Area Addressed)
  • ML17324B166  + (Submits Followup to Re NRC Technical Evaluation Rept Concerning Meteorological Data.Meteorological Measurement Program Will Be Enhanced. Mods Include Relocation of Primary Tower to Inland Site)
  • ML20247N595  + (Submits Followup to Re Purchase of Matls from Us Steel Supply,Co for safety-related Sales for 10CFR50, App B Applications.Determined That Insufficient Documentation or Traceability Exist for Listed Reasons)
  • ML20211P644  + (Submits Followup to Telcon Re Current Normal Operation of Reactor Bldg Cooling Units (Rbcus) & as-modified Environ Qualification of Rbcu Isolation Valves Described in 870120 Tech Spec Change Request.Listed IE Info Notice Inapplicable)
  • ML20214Q504  + (Submits Followup to Util 860815 pre-startup Commitment Status Rept,Per 860521 Confirmatory Action Ltr & Requests Authorization for Restart of Facility.Summary of 860815-27 Events & Corrective Actions Re Encl LERs Provided)
  • ML18058A260  + (Submits Followup to Util Advising of Reassignment of Licensed Operator in 1990 & That Required 10CFR50.74(a) Notification Not Made.Caused by Personnel Error.Licensing Section Will Issue Job Assignments)
  • ML20076F344  + (Submits Followup to Util Oral Request for Regional Temporary Waiver of Compliance)
  • ML20151J913  + (Submits Followup to Util Re Adequacy & Availability of Design Bases Info.Utils Status of Completing Issues Re Design Basis Document Program Updated)
  • ML20151G143  + (Submits Followup to for NRC Consideration.Nrc Initiative in Area Where INPO Had Taken Aggressive Action, Has Potential to Cause Utils to Be Less Receptive & Less Aggressive in Responding to Future INPO Initiatives)
  • ML19263E759  + (Submits Followup to in Response to IE Bulletin 79-03.Ultrasonic Examination Evaluation Indicates Acceptance Stds of Section III of ASME Code,1971 Edition,Are Acceptable)
  • ML19254F898  + (Submits Followup to on Potential Deficiency Re Safety Relief Valve Possible Multiple Consecutive Actuation.Plant Unique Analysis Incomplete Due to Const Halt.Will Advise of Completion by Jan 1982)
  • ML17328A274  + (Submits Followup,Per 900205 & 0308 Ltrs & Provides Update Re Inoperable Fire Barrier.Fire Seal Repaired & Restored to Operability on 900419)