Submits Followup to 940516 Part 21 Rept Informing of Investigation to Determine Data Supplied in mid-80 Used by Nuclear Utilities to Set Torque Switches in MOV
ML20076M832
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 10/28/1994
From: Mccullough H
CRANE CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
REF-PT21-94 NUDOCS 9411090029
Download: ML20076M832 (1)


Text

,

1

<- .mr. -  :

l CRANE NUCLEAR- OPERATIONS l CRANE VALVES ',

  • 104 NORTH CHICAGO STREET
  • JOUET,IL 60431 l

October 28,1994 Document Control Desk l U.S. Nuclear Regulatory Commission Washington, DC 20SSS

SUBJECT:

INTERlhi REl%)RT #3 of 10CFR Part 21 Evaluation

REFERENCE:

Crane Letter Dated May 16,1994 Gentlemen:

This letter is afollonuup to the referenced letter, in which Crane Valves Nuclear Operations advised that we were undertaking an investigation to determine if data supplied in the mid-l980's was used by Nuclear Utilities to set torque switches in biotor Operated Valves.

As described in the Afay correspondence, over 600 issues of Engineering calculations have  :

heen generated and the scope of that evaluation is even greater than we initially anticipatest As of this date, we have uncovered no contractual evidence to support thefact that Crane supplied erroneous data to Utilities, since most orders do not specsfy the objective of our earlier evaluations, it is expected that *he evaluation will be completed within the next 60 days. Any questions can he directed to my attention et 815-740-7571. l Sincerely,

/

ff&W , f. E -

~llenry G.L hicCullough, P.E. ,

blanager Engineering /

Quality Assurance ilGhicC/cs cc: John Carlson Bruce liarry Kevin liutchinson i File S

9411090029 941028 PER ADr.:K 05000302 ppg ff

, CRAN E - ALOYCO A t, NIT OF CRANE VALVES ADMINISTRATIVE OFFICES . P.O. BOX 3339,104 N. CHICAGO ST. JOLiET lL 60434. (815) 727-2600. FAX- (815) 727-4246 i e, MANUFACTURING 12 EAST DEVONWOOD ROMEOVILLE,lL 604411349 + (815)B861710 . FAX:(815)886-9539 May 16,1994 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555

SUBJECT:

INTERIM REPORT OF 10 CFR PART 21 EVALUA TION

REFERENCE:

WEAK LINK ANALYSIS FOR MOTOR OPERATED VALVES (MOV's)

Gentlemen:

In accordance with 10 CFR Part 21, Article 21.21 (a) (2), Crant Valves Nuclear Operations (formerly Crane-Aloyco) hereby advises that we are undertaking an eva'uation to determine if data supplied in the mid-1980's as Crane-Aloyco "0TC" Reports has ben used by Nuclear Utilities to set torque switches in MOV's.

At issue is not the analytical methods, but the use of data beyonl1 the intended scope. This issue surfaced as a result of review of revised OTC reports supplied to Florida Power Corp.

for MOV's at Crystal River Unit #3.

To date, Crane has generated over 600 OTC reports. Accordingly, the scope of the evaluation will extend beyond the 60 day reporting period of10 CFR Part 21. As part of our investigation, we are considering the applicability of reporting requirements in light of GL 89-10 and the possibility' that this circumstance has already been addressed by other NRC Communications such as IN 92-41 or IN 94-18.

Crane Valves Nuclear Operations' representatives have meet with technical and licensing l representativesfrom I oride, Power Corp. on two separate occasions to discuss these issues and to assure that substanthi safety hazards are avoided. i We anticipate completion of this evaluation by July 29,1994, at which time the reporting requirements of10 CFR Part 21 Paragraph 21.21 will be satisfied.

l l

l n . ~ e , cc h+ q?P

't -l V J y

,i o . .

t 4

Page2 Questions concerning this interim Report can be directed to our Manager of Developmental Engineering, Mr. Bruce Harry, at 815-740-7570 or myself at 815 740-7597.

Sincerely,

, To Ronald F. Hornyak Manager QA/ Support Engineering RFH/cs cc: J. Carlson K. Billingsley B. Harry K. Hutchinson Ja Teele File