Submits Followup to RO 79-15,Suppls 1 & 2.Analyses & Evaluations Completed.Mods Associated W/One Seismic Support Performed & Completed on 791221.Power Operation Will Not Be Resumed Until Further Aslprobable Delete:Dupe of 8001020454
ML19290C589
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 12/27/1979
From: Broehl D
PORTLAND GENERAL ELECTRIC CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML19290C588 List:
References
NUDOCS 8001220124
Download: ML19290C589 (4)


Text

M M

_ b, E

__ PortlandGenera!BechicCaiv ny a

I Donald J. BroeN Ass:s: ant Vce Prescent December 27, 1979 Mr. R. H. Engelken, Director U. S. Nuclear Regulatory Commission Region V Suite 202, Walnut Creek Plaza 1990 N. California Blvd.

Walnut Creek, CA 94596

Dear Sir:

As a follow-up to information provided in LER 79-15, and Supplements 1 and 2 thereto, this is to confirm that all analyses and evaluations have been completed and that the final sum =ary of corrective actions on pipe supports and restraints is provided below:

Corrective Actions on Single Wythe and Mortared Double Wythe Walls System Throughbolt Modify Total Safety Injection 13 19 32 Residual Heat Removal 5

21 26 Containment Spray 2

6 8

Chemical & Volume Control 8

5 13 Boron Injection 1

5 6

Spent Fuel Pool Cooling 2

7 9

Component Cooling Water 2

3 5

Containment Chilled Water 0

1 1

Steam Generator Blowdown 0

1 1

Service Water 5

12 17 Diesel Fuel Oil 1

6 7

Auxiliary Feed Pump Diesel Jacket Water 0

2 2

Total 39 88 127 1788 110 g

12: s w samon street Pon:and. oregon 97204 g c0 I"

r.

nge en December 27, 1979 Page 2 Corrective Action on Structural Steel, Concrete Slabs and Composite Walls A modification associated with one seismic support attached to a structural steel member was performed as a result of our reviews described in LER 79-15.

This support is on the Safety Injection System at Elevation 23 ft of the Auxiliary Building.

The modification consisted of supporting the top and bottom flange of a steel beam.

One support attached to a concrete floor slab has been modified.

This restraint, on the Component Cooling Water System, is locate: at Elevation 45 f t in the Aux'.11ary Building and carried primarily thermal loads.

The modification consisted of adding a column and horizontal restraint to the pipe.

Eight supports for the hydrogen vent system, which were attached to a composite wall located adjacent to Containment near the Control and Turbine Buildings, have been removed from the wall and connected to a structural steel frame.

All of the modifications summarized were completed on December 21, 1979.

In accordance with your letter of December 20, 1979, power operation will not commence before our reevaluations have been resolved to the satisfac-tion of the NRC Staff.

In addition, power operation will not resume pending further order of the Atomic Safety and Licensing Board assigned to the Control Building Proceeding.

Sincerely,

/

l

/

c:

Mr. A. Schwencer, Chief Operating Reactors Branch #1 Division of Operating Reactors U. S. Nuclear Regulatory Commission Mr. Lynn Frank, Director State of Oregon Department of Energy Control Building Service List 1788 111 17nn 9 1 0 i e UU l i L'

j,.

gg\\l'

/%

\\

CCCK5'k$ h g

=~

CON UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION y",y 2IE73 >

g S'

5%,.9: hus.m 7

BEFORE THE ATOMIC SAFETY AND LICENSING BOARD

" ~ > 0 SMC

>f SicQ x

U In the Matter of

)

)

Docket 50-344 PORTLAND GENERAL ELECTRIC COMPANY,

)

et al

)

(Control Building Proceeding)

)

(Trojan Nuclear Plant)

)

CERTIFICATE OF SERVICE I hereby certify that on December 27, 1979 Licensee's letter to the Licensing Board regarding status of LER 79-15 evaluations and corrective actions has been served upon the persons listed below by depositing copies thereof in the United States mail with proper postage affixed for first class mail or as indicated by an asterisk by delivery to a messenger for personal service.

  • Marshall E. Miller, Esq., Chairman Docketing and Service Section Atomic Safety and Licensing Board Office of the Secretary U. S. Nuclear Regulatory Commission U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Washington, D. C.

20555

  • Dr. Kenneth A. McCollom, Dean
  • Joseph R. Gray, Esq.

Dirision of Engineering, Counsel for NRC Staff Architecture and Technology U. S. Nuclear Regulatory Commission Oklahoma State University Washington, D. C.

20555 Stillwater, Oklahoma 74074 Lowenstein, Newman, Reis, Axelrad &

  • Dr. Hugh C. Paxton Toll 1229 - 41st Street 1025 Connecticut Avenue, N. W.

Los Alamos, New Mexico 87544 Suite 1214 Washington, D. C.

20036 Atomic Safety and Licensing Board Panel

  • Trank W. Ostrander, Jr., Esq.

U. S. Nuclear Regulatory Commission Richard M. Sandvik, Esq.

Washington, D. C.

20555 Assistant Attorney General State of Oregon Atomic Safety and Licensing Appeal Department of Justice Panel 500 Pacific Building U. S. Nuclear Regulatory Commission 520 S. W. Yamhill Washington, D. C.

20555 Portland, Oregon 97208 1788 ilL

CERTIFICATE OF SERVICE William Kinsey, Esq.

Ms. C. Gail Parson Bonneville Power Administration P. O. Box 2992 P. O. Box 3621 Kodiak, Alaska 99615 Portland, Oregon 97208

  • Mr. Eugene Rosolie
  • Ms. Nina Bell Coalition for Safe Power 728 S. E. 26th Avenue 215 S. E. 9th Avenue Portland, Oregon 97214 Portland, Oregon 97214 Mr. John A. Kullberg Columbia County Courthouse Route 1, Box 250Q Law Library Sauvie Island, Oregon 97231 Circuit Court Room St. Helens, Oregon 97051 Mr. David B. McCoy 348 Hussey Lane Grants Pass, Oregon 97526

'Y

$ff.

49 r

W Ronald W.

nson Corporat ttorney Portland General Electric Company Dated: December 27, 1979 jJgg jj 4salB1

-_