Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Submits Addl Info Re Implementation of ATWS Mods". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20133B542  + (Submits Addl Info Re Implementation of Activities Re 1979 Interpretation of ASME Code,Section XI-1977 & Assessment of Valve Program Concerning Insp Repts 50-315/84-13 & 50-316/84-15)
  • ML19339B243  + (Submits Addl Info Re Implementation of Category a short-term Lessons Learned Requirements of NUREG-0578,per)
  • ML20072Q591  + (Submits Addl Info Re Implementation of Criterion 9 Interfaces Re Instrumentation in Reg Guide 1.97,per NRC 901026 Request.Engineering Study Re Mods to Electrical Isolation Devices Will Be Completed by 920930)
  • ML20247C498  + (Submits Addl Info Re Implementation of NRC Bulletin 88-011, Pressurizer Surge Line Thermal Stratification,Item 1.b. Justification for Continued Operation Submitted Per Meets Requirements of Bulletin 88-011,Item 1.b)
  • ML20127J975  + (Submits Addl Info Re Implementation of NUREG-0737,Item II.F.2 Concerning Inadequate Core Cooling Instrumentation,In Response to Jr Miller 850513 Request.Draft Model Tech Specs Encl)
  • L-90-281, Submits Addl Info Re Implementation of Programmed Enhancements Per Generic Ltr 88-17, Loss of Dhr. All Mods for Unit 1 Completed & Operational.Mods for Unit 2 Schedule for Upcoming Refueling Outage  + (Submits Addl Info Re Implementation of Programmed Enhancements Per Generic Ltr 88-17, Loss of Dhr. All Mods for Unit 1 Completed & Operational.Mods for Unit 2 Schedule for Upcoming Refueling Outage)
  • ML19289C926  + (Submits Addl Info Re Implementation of Section 210 of Energy Reorganization Act 1974.Believes NRC Should Cooperate with Dept of Labor to Provide Info,Notify Workers of Available Protection & Prohibit Employee Discrimination)
  • ML19320C952  + (Submits Addl Info Re Implementation of short-term Lessons Learned Requirements,To Supplement .Contract Consultants Will Assess Operating Experience from 800101 Until Technical Advisors Hired.Certificate of Svc Encl)
  • ML18130A286  + (Submits Addl Info Re Implementation of short-term Lessons Learned Requirements.Status of Remaining Category a Items, mid-yr Status of Design & Installation of Category B Mods & Schedule for Implementation Encl.Forwards Drawings)
  • ML18130A287  + (Submits Addl Info Re Implementation of short-term Lessons Learned Requirements.Status of Remaining Category a Items, mid-yr Status of Design & Installation of Category B Mods & Schedule for Implementation Encl.Forwards Drawings)
  • ML18019A840  + (Submits Addl Info Re Inadequate Core Cooling Instrumentation.Startup Tests & Calibrs Will Be Completed, Per SER License Condition 8.Deletion of Condition 8 Requested)
  • ML20134P129  + (Submits Addl Info Re Incomplete Rcca Insertion as follow-up to 961024 Meeting.Wog (OG-96-090) Also Received)
  • ML20069B970  + (Submits Addl Info Re Increase in Storage Capacity of Spent Fuel to 1,800 Assemblies Per SEP Topic IX-1,fuel Storage. Fuel Storage Racks Are full-length,top-entry & Spaced to Prevent Accidental Critical Array)
  • ML20082B952  + (Submits Addl Info Re Increase of Interim Plugging Criteria for SGs)
  • A01658, Submits Addl Info Re Independence of Four Channels of Reactor Protection & Engineered Safeguards Actuation Sys Measurement Logic,In Response to NRC  + (Submits Addl Info Re Independence of Four Channels of Reactor Protection & Engineered Safeguards Actuation Sys Measurement Logic,In Response to NRC)
  • B16318, Submits Addl Info Re Independent Third Party Oversight Program for Reviewing & Dispositioning Safety Concerns Raised by Employees  + (Submits Addl Info Re Independent Third Party Oversight Program for Reviewing & Dispositioning Safety Concerns Raised by Employees)
  • U-601065, Submits Addl Info Re Info Flow Between Util & Ge,Per a Wang Request  + (Submits Addl Info Re Info Flow Between Util & Ge,Per a Wang Request)
  • ML19309G772  + (Submits Addl Info Re Inservice Insp & Testing,In Response to NUREG-0411 Requirements.All Inservice Examinations Will Be Performed Per 1974 ASME Code XI W/Addenda Through 1975. Requests Relief from Hydrostatic Test Temp & Test Duration)
  • ML20052C538  + (Submits Addl Info Re Inservice Insp Program.Suppl to Proposed Change 67 Is Being Developed & Will Be Submitted by 820301.Relief Requests Will No Longer Be Included in Tech Spec)
  • ML20054F019  + (Submits Addl Info Re Inservice Insp Program in Response to 820305 Request.Revised Pages Will Be Submitted to 781122 Revisions.Identification of Class 1 Exempt Components Encl)
  • ML20063E213  + (Submits Addl Info Re Inservice Insp in Response to NRC .Util Will Perform All B-G-1 & B-G-2 Exams in Accordance W/Requirements of Section XI,1974 Edition Through Summer 1975 Addenda)
  • ML19318D276  + (Submits Addl Info Re Insp & Maint of 1A & 1B Inside Recirculation Spray Pumps in Response to NRC Request. Includes Info Re Modal Analysis of Pump Column,Mating Faces of Pump Coupling & Pump Alignment.S&W Diagrams Encl)
  • ML19224D792  + (Submits Addl Info Re Insp Procedures & Schedule for Bergen-Patterson Hydraulic Shock Absorbers.Future Reporting Will Be Accomplished Via LER Process)
  • ML20236H267  + (Submits Addl Info Re Insp Rept 50-285/87-06 Concerning Nonresponse of Security Supervisor to NRC-identified Concerns.Through Review of Site Security Plan & 10CFR73 Conducted for Discrepancies & No Further Deficiencies Noted)
  • ML20076K817  + (Submits Addl Info Re Insp Repts 50-282/93-12 & 50-306/93-12 on 930927-1115 Re GL 89-10 MOV)