ML20247C498

From kanterella
Jump to navigation Jump to search
Submits Addl Info Re Implementation of NRC Bulletin 88-011, Pressurizer Surge Line Thermal Stratification,Item 1.b. Justification for Continued Operation Submitted Per Meets Requirements of Bulletin 88-011,Item 1.b
ML20247C498
Person / Time
Site: Mcguire, Catawba, McGuire, 05000000
Issue date: 09/05/1989
From: Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
IEB-88-011, IEB-88-11, NUDOCS 8909140019
Download: ML20247C498 (2)


Text

_ --- - - - -. _ _

s.

Duxn POWER GOMPANY P.O. BOX 3318D OIIARLOTTI:, N.O. 28242 HALB. TUCKER trLeratown vics rumament (704) 3y3 4531

. wous. sam emonumcw September 5, l'989 Document Control Desk U. S. Unclear Regulatory Commission Washington, D. C.

20555

Subject:

Catawba Nuclear Station, Units 1 and 2 Docket Nos. 50-413 and 50-414 McGuire Nuclear Station, Units 1 and 2 Docket Nos. 50-369 and 50-370 NRC Bulletin 88-11 Pressurizer Surge Line Thermal Stratification Gentlemen:

Your May 16, 1989 letter requested additional information regarding implementation of NRC Bulletin 88-11, Pressurizer Surge Line Thermal Stratification, Item 1.b. The purpose of this submittal is to respond to your.

request and clarify our efforts regarding Bulletin 88-11, Item 1.b.

On June 15, 1989 the Westinghouse Owners Group submitted to the NRC WCAP-12277, Westinghouse Owners Group Bounding Evaluation For Pressurizer Surge Line Thermal Stratification, [ PROPRIETARY). This WCAP documents the bounding evaluation performed by Westinghouse and provides the technical basis for the justification for continued operation (JCO) required by Item 1.b. We have reviewed WCAP-12277 for applicability to McGuire and Catawba Nuclear Stations. Based on our evaluation, the conclusions of the WCAP are applicable to McGuire and Catawba.

Please be advised that the JC0 submitted per my May 10, 1989 letter to the Document Control Desk meets the requirements of Bulletin 88-11, Item 1.b. The JC0 is based in the bounding analysis documented in the WCAP. Our resolution of Item 1.b for McGuire and Catawba is consistent with the efforts of the Westinghouse Owners Group. As indicated in my May 10, 1989 letter, we will address all other requirements of Bulletin 88-11 by January 1991.

l l

1 1

h Eph)9140019 e9opos FDR ADOCK 05000369 f ;

i O

FDC l

m____

.. j

.s b

U. S. Nuclear Regulatory Com:nission September 5, 1989 Page 2 1 declare under penalty of perjury that the statements set forth herein are true and correct to the best of my knowledge.

Very truly yours.

  • < k Hal B. Tucker JGT/4/B88-11R xc:

Mr. S. D. Ebneter Regional Administrator, Region II U. S. Nuclear Regulatory Comraission 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. P. K. Van Doorn NRC Resident Inspector McGuire Nuclear Station Mr. W. T. Orders NRC Resident Inspector Catawba Nuclear Station 1

i i

I i

J