ML20107L726

From kanterella
Jump to navigation Jump to search
Submits Addl Info Re IE Bulletins 83-06 & 83-07 Concerning Nonconforming Matls Supplied by Ray Miller,Inc & Tube-Line Corp.Controls Established to Assure Quality of Const Matls. Rept Re IE Bulletin 83-06 Will Be Complete by 850531
ML20107L726
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 02/12/1985
From: Foster D
GEORGIA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
GN-528, IEB-83, IEB-83-06, IEB-83-07, IEB-83-6, IEB-83-7, NUDOCS 8503010044
Download: ML20107L726 (2)


Text

%

' ~

Georgia Power Company D '*

Route 2. Box 299A Waynesboro, Georgia 30830 Teleptone 404 554 9961. Ext 3300 404 724 8114. Ext 3360

o. o.ro.i.,

Protect 85 FEBl9 A9: 40 Georgia Power

$,*,eM*",'9 vogt:e Project February 12, 1985 United States Nuclear Regulatory Commission

Reference:

Office of Inspection and Enforcement RII: JP0:

Region II - Suite 2900 50-424, 50-425 101 Marietta Street, Northwest Atlanta, Georgia 30323 File: X7BC24 Log: GN-528 Attention: Mr. James P. O'Reilly The Georgia Power Company wishes to submit. the following supplemental information regarding the general concerns of USNRC I&E Bulletins 83-06 and 83-07, which deal with non-conforming materials

. supplied to nuclear power plants.

The evaluations conducted in response to the specific concerns of I&E Bulletins 83-06 and 83-07 required the review of specific procurement and control measures applied to materials supplied by Ray Miller, Inc. and Tube-Line Corporation. In addition, the Vogtle Project Quality Assurance Department conducted audits of the procurement and material control programs applied to other suppliers providing a variety of materials and equipment. These audits also included examinations of program controls for accepting substitutions for materials when requisitions specify a particular type or brand. The audits determined that adequate controls have been established at the Vogtle Electric Generating Plant to assure the quality of materials used in its construction. Documentation relative to these audits is available for review at the plant site.

Georgia Power has completed its evaluation of I&E Bulletin 83-07 (Reference -letters GN-377, dated June 26, 1984, and GN-383, dated July 5, .1984). The evaluation of I&E Bulletin 83-06 is continuing l as indicated in previous correspondence GN-507, dated January 14, l 1985. At this time, Georgia Power Company expects to complete this evaluation and submit a final. report to the USNRC by May 31, 1985.

l This report contains no proprietary information and may be placed in the NRC Public Document Room.

Yours truly, D.OfFoster/

REF/DOF/tdm 8503010044 050212

!. PDR ADOCK 05000424 G

t PDR_ 'g ffM

p.-

g ..-

Page Two 7 D. O. Foster states that he is the Vice President and Project General Manager of the Vogtle Electric Generating Plant and is authorized to execute this oath on behalf of Georgia Power Company and that to the best of his knowledge and belief the facts set forth in this letter are true.

( YA ,

/

GPC: a .

p w j

. Sworn and subscribed before me this /2/ day of February, 1985.

0 cQ u /s>a k S A rgia at Large NotaryjPtiblR,

.My CommissionState Expires: of Ggo/99 1///

xc: U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 R. J. Kelly J. A. Bailey G. Bockhold R. E. Conway 0. Batum . P. D. Rice G. F. Head H. H.' Gregory C. S._McCall (OPC)

J..T. Beckham W. T. Nickerson E. L. Blake, Jr.

R. A. Thomas D. R. Altman (Shaw, et. al . )

D. E. Dutton . D. L. Kinnsch (BPC) J. E. Joiner W. F. Sanders (NRC) J. L. Vota (W) (Troutman, et. al.)

R. H. Pinson L. T. Gucwa .D. C. Teper (GANE)

B. M. Guthrie C. E. Belflower L. Fowler (LEAF)

E. D. Groover M. Malcom (BPC) T. Johnson (ECPG)

R. W. McManus i