Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20206U799 + (Revised Proposed Tech Spec Change PCN 192,in Response to Generic Ltr 84-15 Concerning Cold Fast Start Testing.Addl Justification Also Encl,Per 860814 Meeting)
- ML18052A964 + (Revised Proposed Tech Spec Change Re Containment Air Cooler Design)
- ML20080P358 + (Revised Proposed Tech Spec Changes to Rod Control Sys)
- ML17254A694 + (Revised Proposed Tech Spec Changes,Adding New mini-purge Sys & Deleting Requirements for Old 48-inch Containment Purge Sys)
- ML20205D217 + (Revised Proposed Tech Spec Changes,Reflecting Statements for Actions 2b & 6b Per NRC & Page B 3/4 3-1 Re Bases to Reflect NRC 850221 Approval of WCAP-10271)
- ML17223A836 + (Revised Proposed Tech Spec Figure 3.4.2 Re Heatup & Core Critical,Correcting Typo)
- ML20053E170 + (Revised Proposed Tech Spec Figures 6.2-1 & 6.2-2 & Tech Spec 6.2.3 Re Offsite Organization for Facility Mgt & Technical Support)
- ML20210A861 + (Revised Proposed Tech Spec Page 15.5.3-1,adding Word Limited to Fourth Sentence of Spec 15.5.3.A.1)
- ML20126M266 + (Revised Proposed Tech Spec Page 3/4 3-35,Table 3.3-9, Remote Shutdown Monitoring Instrumentation, Replacing Es Switchgear Room W/Remote Shutdown Panel as Readout Location)
- ML18095A365 + (Revised Proposed Tech Spec Page 3/4 3-5)
- ML17325B102 + (Revised Proposed Tech Spec Page 3/4 6-27,reflecting Deletion of Ice Condenser Flow Passage Insps)
- ML20134M634 + (Revised Proposed Tech Spec Page 3/4.6-15,Table 3.6.3-1 Re Primary Containment Isolation Valve Temporary Time Limit Change)
- ML20042D218 + (Revised Proposed Tech Spec Page 5.12-1 & New Page 5.12-2 Re Administrative Control Requirements)
- ML20137J111 + (Revised Proposed Tech Spec Page 6-9 Re Administrative Controls for Composition of Nuclear Operations Board)
- ML20069J532 + (Revised Proposed Tech Spec Pages 1.2/2.2-1 & 3.3/4.3-5, Supporting Review of Future Reloads & Revised Figure 3.5.1, Sheet 1,providing Extended MAPLHGR Vs Exposure Curves for Barrier Lead Test Assembly Fuel.Supersedes 820819 Version)
- ML20147H569 + (Revised Proposed Tech Spec Pages 3/4 3-30c & 3/4 4-1a, Reflecting Change to Anticipatory Reactor Trip Sys Arming Level & Reactor Protection Sys High Pressure Trip Setpoint, Respectively)
- ML20076M029 + (Revised Proposed Tech Spec Pages 3/4 3-72 & 3/4 3-73, Permitting one-time Change to Forego Weekly Turbine Valve Testing Until End of Fuel Cycle)
- ML20237A839 + (Revised Proposed Tech Spec Pages ii,68 & 225 Re Table of Contents,Reactor Protection Instrumentation & Integrated Leak Rate Test for Secondary Containment)
- BECO-91-150, Revised Proposed Tech Spec Re Auxiliary Electrical Sys + (Revised Proposed Tech Spec Re Auxiliary Electrical Sys)
- ML20072T540 + (Revised Proposed Tech Spec Re Reactor Coolant Leakage Detection Sys)
- ML20083P977 + (Revised Proposed Tech Spec Re Transversing in-core Probe Sys,Hydrogen & Oxygen post-accident Monitoring & HPCI & RCIC)
- ML20207Q409 + (Revised Proposed Tech Spec Section 3/4.8, Electrical Power Sys Bases, Containing Commitment to Demonstrate Diesel Generator Operability by Carrying Load Unless Circumstances Constrain Loading)
- ML17346A175 + (Revised Proposed Tech Spec Table 3.5-2, ESF Actuation & 3.5-4, ESF Setpoints)
- ML20147F077 + (Revised Proposed Tech Spec Table 4.1-1 & Tech Spec 4.10.1.E.2,requiring Performance of Surveillances Only When Gaseous Chlorine Onsite)
- ML17347A698 + (Revised Proposed Tech Spec Table 4.8-2, Battery Surveillance Requirements)
- ML18051B308 + (Revised Proposed Tech Spec Table 6.2-1 Re Min Shift Crew Composition)
- ML20137R131 + (Revised Proposed Tech Spec,Reflecting Modified Wording of Footnote Superseding 851223 Rev to Tech Spec 3/4 9-4 Re Refueling Operations/Instrumentation)
- ML19317H132 + (Revised Proposed Tech Specs 3.5,3.17-3.20,4.19-4.24,5.0-5.4 & 6.0-6.8 Re Facility Fire Protection Program)
- ML20052F477 + (Revised Proposed Tech Specs 3.6.1.6, Containment Structural Integrity)
- ML20003G260 + (Revised Proposed Tech Specs 3.7.1,3.10.6,4.7.1 & 4.10.6 Re Svc Water Sys Operability)
- ML19326C171 + (Revised Proposed Tech Specs 6.0-6.11 Re Administrative Control for Facility)
- ML20073T190 + (Revised Proposed Tech Specs Changing Upper Head Injection Accumulator Automatic Isolation Setpoints to Incorporate Revised Setpoint Calculation)
- ML20087M407 + (Revised Proposed Tech Specs Clarifying & Correcting 831212 Amends to Operating Conditions for Reactor Core,Radial Peaking Factor Rept & Special Repts)
- ML18005A878 + (Revised Proposed Tech Specs Page 3/4 9-1 Re Refueling Operations)
- ML20135C378 + (Revised Proposed Tech Specs Page Re 3/4, Limiting Condition for Operation & Surveillance Requirements)
- ML19344D159 + (Revised Proposed Tech Specs Pages 1.1/2.1-2,1.1/2.1-3,1.1/2. 1-8,1.1/2.1-9 & 3.1/4.1-1,eliminating Average Power Range Monitor Gain Adjustment Sections)
- ML20236J429 + (Revised Proposed Tech Specs Pages 194 & 206,incorporating Clarifications to Sections 6.2.A.1 & 6.5.C)
- ML18005A875 + (Revised Proposed Tech Specs Pages 3/4 1-4,3/4 1-5,B 3/4 1-2 & B 3/4 1-2a Re end-of-life Moderator Temp Coefficient)
- ML20199H266 + (Revised Proposed Tech Specs Pages Re 971003 Request for Amend to License R-37 & NRC RAI)
- ML20154E562 + (Revised Proposed Tech Specs Pages Re 980403 Application for Amend to License NPF-43 for Conversion of TS to Improved Standard TS)
- ML20236J313 + (Revised Proposed Tech Specs Pages Re Safety Injection Signal & Blackout Signal)
- ML18094A747 + (Revised Proposed Tech Specs Re Ac Sources & Onsite Power Distribution Sys)
- ML20207Q457 + (Revised Proposed Tech Specs Re Addition of Reporting Level for Co-60 in Sediment Samples Taken from North Storm Drain Outfall)
- ML20235J410 + (Revised Proposed Tech Specs Re Administrative Controls)
- ML20248B681 + (Revised Proposed Tech Specs Re Combustible Gas Control)
- ML20247D304 + (Revised Proposed Tech Specs Re Containment Hydrogen Monitors)
- ML20086K442 + (Revised Proposed Tech Specs Re DG Enhancements Reflecting More Conservative Approach to Enhancing DGs)
- ML20246C946 + (Revised Proposed Tech Specs Re Extended Operation at Reduced Power W/Single Recirculation Loop in Operation, Reflecting Recent Industry Events Involving thermal-hydraulic Instability)
- ML20133C071 + (Revised Proposed Tech Specs Re Figure 6-2 Concerning Organizational Chart)
- ML17325B318 + (Revised Proposed Tech Specs Re Fire Protection,Reducing Fire Watch Burden)
- ML20117L061 + (Revised Proposed Tech Specs Re LCO 3.3.11, Post Accident Monitoring Instrumentation (Pami))